Bids Are invited for Hiring Of Consultants - Milestone/Deliverable Based - Functional Consultants; Engineering Design, Building And Construction; No; Hybrid(As Specified In Scope Of Work) - 1. General Inspection Of Rcc Structures As Covered In Scope
Tender Overview
Project Description
Bids Are invited for Hiring Of Consultants - Milestone/Deliverable Based - Functional Consultants; Engineering Design, Building And Construction; No; Hybrid(As Specified In Scope Of Work) - 1. General Inspection Of Rcc Structures As Covered In Scope Of Work Above For All The Structures/Buildings Of Scope Of Work Of Nit, Along With Inspection And Recommendation Reports And Issue Of Stability Certificate In Requisite Form As Per Maharashtra Factories Rule-1963 [Form-3A] & Identification Of Structures & Locations For Carrying Out Various Ndts. All Possible Relevant Data & Information Of The Rcc Structures Shall Be Collected. Extent And Quantum Of Field Survey Shall Be Decided. Preparation Of Field Documents, Grouping Of Structural Members And Classification Of Damage If Any.All The Structures Shall Be Visually Inspected. Planning For N.D.T. Shall Be Done Based On Visual Inspection. Identification Of Rcc & Other Structures Which Are Badly Damaged & Require Detailed Inspection & Suggesting N.D.T.Conducting Ndts Such As Ultrasonic Pulse Velocity Test, Rebound Hammer Test, Carbonation Test, Chloride Test, Rcc Structures Destructive Tests Like Core Testing For Rcc Structures. Minimum Nos. Of Tests Mentioned In Scope Of Work. Any Other N.D.T. Than Mentioned Herein, But Required From Audit Point Of View, May Also Be Conducted. All The Tests Shall Be Undertaken On Selective Basis On Representative Structural Members.Performing The Ndts. Submission Of Report Of Ndts And Core Cutting Test Conducted.To Prepare And Submit A Structural Audit Report Incorporating All The Above Along With Photographic Evidences, Inference Of Non-Destructive Testing Reports, Conclusions Of The Inspections And Recommending Technically Most Suitable Methodology For Repair Works Along With Material Specifications And Detailed Procedure Shall Be Submitted, For The Structure Mentioned In Scope. 2. Issue Of Stability Certificates Based On The Audit, Valid For Five Years For The Structures Mentioned In Scope. Orissue Of Provisional Stability Certificate Valid For Two Years. Submission Of Schedule Of Quantities Including Estimated Cost Mentioning Suitable Repair, Rehabilitation/Retrofitting Methods For Each Building/Structure With Item/Material Specifications And Detailed Procedure. After Completion Of Suggested Repairs, Issue Of Stability Certificate For Remaining Three Years. (Note: Please Refer Scope Of Work In Nit.)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | 1. General inspection of RCC structures as covered in Scope of work above for all the structures/buildings of scope of work of NIT, along with inspection and recommendation reports and issue of stability certificate in requisite form as per Maharashtra factories rule-1963 [form-3A] & identification of structures & locations for carrying out various NDTs. All possible relevant data & information of the RCC structures shall be collected. Extent and quantum of field survey shall be decided. Preparation of field documents, grouping of structural members and classification of damage if any.All the structures shall be visually inspected. Planning for N.D.T. shall be done based on visual inspection. Identification of RCC & other structures which are badly damaged & require detailed inspection & suggesting N.D.T.Conducting NDT’s such as Ultrasonic Pulse Velocity Test, Rebound Hammer test, Carbonation test, Chloride test, RCC structures Destructive tests like Core testing for RCC structures. Minimum nos. of tests mentioned in scope of work. Any other N.D.T. than mentioned herein, but required from audit point of view, may also be conducted. All the tests shall be undertaken on selective basis on representative structural members.Performing the NDTs. Submission of report of NDTs and core cutting test conducted.To prepare and submit a structural audit report incorporating all the above along with photographic evidences, inference of non-destructive testing reports, conclusions of the inspections and recommending technically most suitable methodology for repair works along with material specifications and detailed procedure shall be submitted, for the structure mentioned in scope. 2. Issue of Stability certificates based on the audit, valid for five years for the structures mentioned in scope. ORIssue of provisional stability certificate valid for two years. Submission of Schedule of quantities including estimated cost mentioning suitable repair, rehabilitation/retrofitting methods for each building/structure with item/material specifications and detailed procedure. After completion of suggested repairs, issue of stability certificate for remaining three years. (Note: Please refer scope of work in NIT.) | 1. General inspection of RCC structures as covered in Scope of work above for all the structures/buildings of scope of work of NIT, along with inspection and recommendation reports and issue of stability certificate in requisite form as per Maharashtra factories rule-1963 [form-3A] & identification of structures & locations for carrying out various NDTs. All possible relevant data & information of the RCC structures shall be collected. Extent and quantum of field survey shall be decided. Preparation of field documents, grouping of structural members and classification of damage if any.All the structures shall be visually inspected. Planning for N.D.T. shall be done based on visual inspection. Identification of RCC & other structures which are badly damaged & require detailed inspection & suggesting N.D.T.Conducting NDT’s such as Ultrasonic Pulse Velocity Test, Rebound Hammer test, Carbonation test, Chloride test, RCC structures Destructive tests like Core testing for RCC structures. Minimum nos. of tests mentioned in scope of work. Any other N.D.T. than mentioned herein, but required from audit point of view, may also be conducted. All the tests shall be undertaken on selective basis on representative structural members.Performing the NDTs. Submission of report of NDTs and core cutting test conducted.To prepare and submit a structural audit report incorporating all the above along with photographic evidences, inference of non-destructive testing reports, conclusions of the inspections and recommending technically most suitable methodology for repair works along with material specifications and detailed procedure shall be submitted, for the structure mentioned in scope. 2. Issue of Stability certificates based on the audit, valid for five years for the structures mentioned in scope. ORIssue of provisional stability certificate valid for two years. Submission of Schedule of quantities including estimated cost mentioning suitable repair, rehabilitation/retrofitting methods for each building/structure with item/material specifications and detailed procedure. After completion of suggested repairs, issue of stability certificate for remaining three years. (Note: Please refer scope of work in NIT.) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender