Tender For Installation And Energisation Of Sikharapur-Iii T.W.P Under Odagaon Block In Nayagarh District Under Bkvy-Ridf 2026-27
Tender Overview
Project Description
Tender for Installation And Energisation Of Sikharapur-Iii T.W.P Under Odagaon Block In Nayagarh District Under Bkvy-Ridf 2026-27
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Nov-2026 | Tender Notice | Other | 26-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level in alluvial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer in charge including use of own Rigs with its accessories, tools and plants and all consumables (like coir rope, cotton waste and bentonite powder etc. complete) etc. for lowering of finished bore suitable for lowering (minimum 400 mm dia.) of 200mm dia GI/PVC Pipe for housing fitted with sockets and with or without well screen as per the necessity for the soft medium, hard and boulder formations (. GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion ) including lower and withdrawing of casing pipes after drilling 200mm to 450mm dia in over burden portion. For Drilling of 200 (8”) dia pipe From 0 mtr. to 100th meters |
| 2 | Supply of all Labour & T&P for lowering the following sizes of PVC Pipes with or without slotted pipes as per the necessity from ground level & fitted & fixed up in perfectly verticaly position inlcuding cutting & threading pipe and slotted pipe and fixing all jointing materials etc. complete. and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above excluding cost of fitting & joining materials. 200mm dia PVC/GI Casing pipes |
| 3 | Cleaning and developing the production well using their own compressor continuously worked till clear and adequate discharge minimum 6hours is obtained from the tube well including supply and use of all necessary equipments and labour as per the direction of Engineer-incharge. |
| 4 | Supplying all materials,Labour T & P for packing the bore with washed gravel size (P-6) arround the well screen and pipes in good quality including cost of gravel ,conveyance,royality,etc complete as per direction Engineer-in-charge. |
| 5 | Cost for slotting charges of 200 mm dia Schedule 80 PVC casing pipe having slot size 1.5 mm including all cost etc complete. |
| 6 | Threading charges 200mm dia Schedule 80 PVC casing pipe |
| 7 | 200mm dia 300mm long PVC short piece |
| 8 | 200mm PVC Cone (WP 10 Kg/cm2) |
| 9 | 8\\" PVC threaded end cap PN-10 |
| 10 | 200mm Ø SCHEDULE 80 casing pipe (As per EPM Rate order no.1814 dated 23.04.2025) |
| 11 | Earth work excavation in foundation in hard soil with 50 mtr initial lead 1.5 m initial lift including rough dressing and breaking clods to 2 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of Engineer-in-charge |
| 12 | Earth work in hard soil such as hard stiff clay,stiff black cotton, hard red earth, sheles, morrum,.ordinry gravelly within 50 meter initial lead and 1.5mt. Intial lift including rough dressing and breaking the clods and stacking rubble or spreading and levelling within the site as the case may be etc complete as per the direction of the department. Average Rate of Mannual & Machinery (60% mechanical + 40% mannual) |
| 13 | Filling foundation and plinth with sand watered and rammed as per direction of Engineer-in-charge. |
| 14 | Cement concrete (1:4:8) with 4 cm size h.g metal as per direction of engineer-in-charge. |
| 15 | Brick work with Fly ash Brick (25cmx12cm x8 cm) having crushing strength not less than 35kg/cm with dimensional tolerance ± 5% in cement mortar (1:6) in foundation and plinth. |
| 16 | Brick work with Fly ash Brick (25cmx12cm x8 cm) having crushing strength not less than 35kg/cm with dimensional tolerance ± 5% in cement mortar (1:6) in super structure. |
| 17 | 12mm thick cement plaster (1:6 ) over brick masonary |
| 18 | Cement Concrete (1:2:4) with 12 mm size HG chips for R.C.C Works. |
| 19 | Supplying, fitting and placing oncoated HYSD (TISCON) bar reinforcement complete as per drawing and technical specification including cutting, binding, bending and cost of binding wire. |
| 20 | Rigid and smooth centering and shuttering for RCC work including false work and dismentalling them after casting including cost of materials complete. in foundation ( Plinth Bend ) |
| 21 | Lintel |
| 22 | Rcc Wall |
| 23 | Filling F & P with excavated materials, moorum including watering and ramming as directed by the engineer-in-charge |
| 24 | Filling in F&P with excavated materials by means of Mechanical 60% & mannually 40% i.e. of respective item No. 1 above) |
| 25 | White washing 3 Coat. |
| 26 | Colouring,washing with materials (2 coats) |
| 27 | Priming 1 coat with any appproved Primer including cost of materials |
| 28 | Painting two coats with any approved paints |
| 29 | 2.5 cm thick A.S flooring with CC (1:2:4) including punning. |
| 30 | Cement washing one coat |
| 31 | Cost of Pump chamber wiring with all costs |
| 32 | Supply of M.S Door with door frame grill & Window with cost of priming, painting and fixing etc. In complete shape |
| 33 | Writing charge of required information and data on both side of the transperancy pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge. |
| 34 | 160mm Ø HDPE Pipe PE 80- PN 4 |
| 35 | Transportation of 160 mm dia HDPE pipe from nearest approved manufacturing units as listed in EPM rate contract to village site of the project |
| 36 | Supplying all materials, labour, T&P for jointing of 160 mm outer dia High Density Polythylene Pipes of specified material grade & pressure rating by butt fusion welding method as per speciication & laying in tranches including testing including all cost etc complete as per direction of the Engineer-in-charge |
| 37 | Cost of 6 HP S/S Pumpset having discharge of 700LPM at 25 meter head including testing. |
| 38 | Control Pannel with Automatic Star delta Starter, sheet steel enclosure suitable for operation of Squirrel cage induction motor up to 10 HP with 16 Amp (AC -3) duty contractor at 415 Volt+6%-15%, 3 phase, 50 Hz AC supply with over load relay range 6.00 to 9.50 Amp & no volt coil with electronic timer suitable for operation at voltage range of 300 to 440 V. The Starter should provide dependable protection against over load and single phasing fitted with Volt meter,Ameter,MCB in complete shape including Indicator Lamp |
| 39 | 3 KVR Capacitor |
| 40 | 3 x 10 sqm Tarpodar Cable XLPE (Cross like polythylin) confirming to IS-7098 (Part-II) including laying below 9 mtr of the ground & fitting the excavated materials including watering & ramming. |
| 41 | 6 mm2 submerssible (3 Coper) Flat Cable |
| 42 | 63/100 AMP 415 volt T.P. main switch confirming to IS 4064 (Pt-I & Pt-II) with utilisation category Ac-22. |
| 43 | Supply, fittintg and placing of 80 mmdia Nominal Bore GI pipes having wall thickness 4.5 mm electrical resistance welded of medimum class confirming to IS-1239 (part-I/2004) with latest amendments, screwed at both ends as per IS-554 socketed at 1 end and other end protected with plastic threaded protector. The socket confirming IS-1239 (Part-II/1992) with latest amendments in rendom length of 4 to 7 mtrs. Each pipe should bear ISI certification and manufacturers name /trade mark. |
| 44 | Labour charges for Lowering of the pump set,delivery fitting including fitting of sluice valve / NRV / ARV / PVC-Tee / and transportation etc. for two sets |
| 45 | 80 mm dia G.I. bend IS No 1239 (Part-II/1992) |
| 46 | 80 mm dia G.I. flange IS No 6392/1971 |
| 47 | 100x80 mm dia G.I. reducing socket |
| 48 | 150 x80 mm dia G.I. reducing socket |
| 49 | Cost of Tube Well safeguard |
| 50 | Cost of 200x100 mm Ø M.S. T/W cap |
| 51 | Cost of 80 mm Ø M.S Clamp |
| 52 | Cost of 160 mm dia HDPE End Cap |
| 53 | Cost of 160mmx160mmx160mm dia HDPE equal Tee |
| 54 | Cost of Nut Bolt. |
| 55 | Cost of Rubber Insuration. |
| 56 | Cost of 160mm x160mm x 110 mm GI Tee with accessories |
| 57 | Cost of 150mm dia Butter fly valve |
| 58 | 50mm dia C.I. Air Release Valve IS Mark 14845(SI)with 1 mtr long G.I.Short piece with saddle |
| 59 | Cost of cement primer 1 ltr |
| 60 | Oil painting with approved colour two coats including cost of paint and labour charges |
| 61 | Cost of radium paint to be used in lettering 1 ltr |
| 62 | Cost of extra earthwork for laying of suction pipe in proper slope. |
| 63 | Photograph of before, during and completion of work. |
| 64 | Cost & Supply of tool kit (Sly wrench, DE Spanner, Tester,Gloves etc) |
| 65 | Construction & erection of 11 / 0.416 KV ,25 KVA (3 star rated transformer) D.P. Substation confirming to RE Rules 1956, mounted on 2.44 Mtr long structure, supported in 330 Kg 10 Mtr long PSC pole, transformer hard channel & top channel made of 2.80 M long 100x50x60 mm M.S. Channel, Transformer belting on 2.80 Mtr long 50x50x50 mm M.S. Angle, (all REC SPN. Std. F-3) with all accessories like 3 pole 11 KV HG Fuse (F-5) & A.B. Switches (F-9) both mounted on 2.80 M long 75x40x60 mm M.S. Channel and supported by 1.0M long 50x50x50 mm M.S. Angle, with 3 No. 11 KV Lightening Arrestors & Distribution box for 25/63 KVA S/S, Pipe earthing (F-2) , including cost of 50 Sqm 3.5 Core PVC Cable carpping & padding of Poles, Danger board at each Pole, Anti Climbing Devices & all other necessary fittings i.e. required size Nuts & Bolts, Brackets, Cable, Cable Sockets etc. including cost of all materials, labour, transportation complete with liasioning for testing inspection & commissioning etc as per CESU specification. |
| 66 | Construction of 3 phase 11 KV line as per REC standard confirming to RE Rules 1956 with 330 Kg 10 Mtr long PSC Pole support in 50 M span, 70 Sqmm Insulated Conductor, 11 KV \\"V\\" Cross arm , with required No.of 11 KV T & C Disc.Insulators & 11 KV Pin Insulators, Carping & Padding of Poles, Danger Board at each Pole, Anti Climbing Devices, Stay Set at Bending point & Double Stay at end point with 18 mm G.I. H.T Stay , concreting of Stay with Anchor plate, guarding at Road crossings etc.including cost of all materials, labour, transpotation, inspection & commissioning etc. complete. |
| 67 | LT line 3ph 4w using 3x35+1x25 sq.mm XLPE AB Cable & 9 mtr long PSC poles with fittings with all materials required for the same as per specification & estimate of Discom. |
| 68 | Electrical T.P. Box including labour chatges for installation and fittings of materials in the sub-station. |
| 69 | Electrical Earthing with 40mtr dia medium duty GI earthing pipe each 3 m longwith installation including cost of all materials like GI flange chorcoat, salf etc. as required as per I.E Rule |
| 70 | Other Electrical materials such as pvc tape.7/20pvc copper wire 3/20 pvc copper wire G.I flxible condite pipe no 6 GI wire copper cable socket GI socket and petty materials required for electrical installation. All materials should be as per IS including fitting charges and electrical installation & energisation. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender