Tender For Construction Of A New Kitchen Shed With Stock Room @ Government High School Thumbalahalli Head Of Thumbalahalli Karimangalam Block , (Pkbfs & Ptmgr ) 2026 - 2027
Tender Value
7.56 Lakhs
Estimated cost
Bid Submission
20 Nov 2026
5 days left
EMD
8000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dharmapuri → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of A New Kitchen Shed With Stock Room @ Government High School Thumbalahalli Head Of Thumbalahalli Karimangalam Block , (Pkbfs & Ptmgr ) 2026 - 2027
BOQ
| Sl. No. | Item Description |
| 1 | Construction of a New Kitchen shed with stock room @ Government High school Thumbalahalli H/o Thumbalahalli Karimangalam Block , (PKBFS & PTMGR ) 2026 - 2027 |
| 2 | Earth work excavation and depositing on bank with initial lead and list in all clauses as soil as per SS 20 B, First Depth, Column, Grade BeamBuilding alroundC/W Kitchen & StoreC/W Kitchen & Verandah C/W Store 1 & Store 2Verandah StepD/F Column |
| 3 | Cement concrete 1:4:8 mix using 40mm metal including cost and Conveyance of all site etc. Complete.FoundationGrade BeamBuilding alroundC/W Kitchen & StoreC/W Kitchen & Verandah C/W Store 1 & Store 2Verandah StepD/F ColumnFlooringStore RoomVerandahKitchen |
| 4 | Collection and supply of M sand and filling conveyance to the siteand all labour charges for filling as per standard speecificationsColoumn |
| 5 | Refilling the Basement with Excavated earth Other than sand compling the standard Specification.Flooring, Store Room.Kitchen,Verandah |
| 6 | Brick work in cm 1:5 Mix using new country bricks including cost and Conveyance of all site etc. complete.Grade Beam top to BasementBuilding alround, C/W Kitchen & Store , C/W Kitchen & Verandah , C/W Store & Store, D/F ColumnMain wall alround, C/W Kitchen & Store , C/W Store & Store, Shelf walls, Hand Wash sink side wall. Store Room Platform, Store Room Platform, Step 1, Step DeductionsDoor D, Windows, Column, |
| 7 | Supplying erecting steel centering for lintel, sunshade and Roof slab etc completeGrade Beam SidesMainwall alround, C/W Kitchen & Store , C/W Kitchen & Verandah , C/W Store & Store,Column upto Grade Beam |
| 8 | Column GB to RL,Lintel Beam,C/W Kitchen & Store , C/W Kitchen & Verandah , C/W Store & Store, Sill Slab WindowRoof Slab BottomStore Room,Kitchen,Verandah, Store Loft,Roof Slab Roof Level Beamwall alround ,C/W Kitchen & Store , C/W Kitchen & Verandah , C/W Store & Store,Roof Level Beam BottomDoor D,Window Sunshade,Windows |
| 9 | Reinforcement Cement concerete 1:1.5:3 using 20mm.H.B.G.jelly for all R .c.c. items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing but providing fixtures like fanclamps , Column Matt,Tapper Portion,Column upto Grade Bottom,Column GB to RL,Lintel Beam,C/W Store, Wash & Kit, Ver, C/W Store & Store, SunshadeGrade BeamMainwall alround, C/W Store, Wash & Kit, Ver.C/W Kitchen & Verandah ,C/W Store & Store, Roof Level beamAlround,/W Store, Wash & Kit, Ver, C/W Kitchen & Verandah ,C/W Store & Store, Roof Slab |
| 10 | Supply and fabrication of steel including , cutting, bending and binding wires etc. complete. |
| 11 | Plastering in cm 1:3 mix using 10mm thick including cost and conveyance of all site etc.complete.CeilingSunshade Top ,Sunshade Sides ,Front Sunshade Top ,Side Sunshade, Front Sunshade sides |
| 12 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.CeilingStore Room,Verandah,Kitchen,Sunshade Bottom,Front Sunshade Bottom,Side Sunshade bottom |
| 13 | Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum Roof Top,Store Room,Kitchen,Verandah |
| 14 | Plastering in CM 1:5 mix using 12mm thick including cost conveyance of all site etc. complete.Inner wall ,Store Room alround,Kitchen alround,Soffits,Door D1,WindowsOuter, Wall alround + Base,Hand wash Sink side wallDeductions, Door D1, Windows |
| 15 | Distember two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete Store Room alround,Kitchen alround,Soffits,Door D1,Windows |
| 16 | Exterior Emulsion Painting two coats over using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete Outer, Wall alround + Base,Soffits, Windows,Deductions,Door D, Windows |
| 17 | Painting two coats for Door & Ventilator including cost and Conveyance of all site etc. Complete. Door D1, Window |
| 18 | Supply and fixing of Steel door , Window, Ventilator including cost labour charges and all etc., complete Door D1 (0.90X 2.10), |
| 19 | Window (1.20X 1.30) |
| 20 | Supply and fixing of Cuddappa Slab including cost and Conveyance of all site etc. Complete.Shelf |
| 21 | Provision for 100mm Rainwater Down Fall Pipe |
| 22 | Provision for Electrification arrangements Light & Fan Point SD.no.23 |
| 23 | Supply&Fixing of Tube Light SD.no.88 |
| 24 | CFL SD.no.80 |
| 25 | Supply&Fixing of Street light SD.no.94 |
| 26 | Plug Point SD.no.38 |
| 27 | S & Fixing DP Main swetch SD.no.125 |
| 28 | Provision for Exhaust Fan |
| 29 | Service pipe SD.no.73 |
| 30 | Service Connection wire SD.no.69 |
| 31 | Provision of Water Supply arrangement32mm PVC Pipe |
| 32 | 32mm PVC Elbow |
| 33 | 32mm PVC Tee |
| 34 | 32x15mm PVC Reducer |
| 35 | 15mm PVC Tap |
| 36 | Provsion for Name Board. |
| 37 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender