Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Container Freight Stations; High Mast Tower; As Per Scope Of Work - Supply & Installation Of High-Tensile Anti-Corrosive Stainless-Steel Wire Rope F
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Container Freight Stations; High Mast Tower; As Per Scope Of Work - Supply & Installation Of High-Tensile Anti-Corrosive Stainless-Steel Wire Rope For High-Mast Winch/Lifting Assembly , Supply & Installation Of Wire-Rope Termination & Anchorage Hardware, Including Thimbles, U-Clamps/Wire-Rope Grips And Associated Fittings , Deployment & Rental Of Hydraulic Boom Lift For Controlled Lowering, Handling, Re-Erection And Alignment Of 30-Mtr High-Mast Pole , Specialized High-Mast Rigging, Mechanical Servicing, Winch/Pulley Maintenance, Wire-Rope Installation, Tensioning, Testing & Re-Commissioning Charges
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply & Installation of High-Tensile Anti-Corrosive Stainless-Steel Wire Rope for High-Mast Winch/Lifting Assembly | Supply & Installation of High-Tensile Anti-Corrosive Stainless-Steel Wire Rope for High-Mast Winch/Lifting Assembly |
| 2 | Supply & Installation of Wire-Rope Termination & Anchorage Hardware, including Thimbles, U-Clamps/Wire-Rope Grips and Associated Fittings | Supply & Installation of Wire-Rope Termination & Anchorage Hardware, including Thimbles, U-Clamps/Wire-Rope Grips and Associated Fittings |
| 3 | Deployment & Rental of Hydraulic Boom Lift for Controlled Lowering, Handling, Re-Erection and Alignment of 30-Mtr High-Mast Pole | Deployment & Rental of Hydraulic Boom Lift for Controlled Lowering, Handling, Re-Erection and Alignment of 30-Mtr High-Mast Pole |
| 4 | Specialized High-Mast Rigging, Mechanical Servicing, Winch/Pulley Maintenance, Wire-Rope Installation, Tensioning, Testing & Re-Commissioning Charges | Specialized High-Mast Rigging, Mechanical Servicing, Winch/Pulley Maintenance, Wire-Rope Installation, Tensioning, Testing & Re-Commissioning Charges |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender