Tender For Supply Installation Testing and Commissioning of 500 Kva Transformer With Dp Structure & Other Accessories For Drug Ware House And Newly Constructed Fire Pump House, Scbmch, Cuttack
Tender Value
27.18 Lakhs
Estimated cost
Bid Submission
20 Nov 2026
13 days left
EMD
27200
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supply Installation Testing and Commissioning of 500 Kva Transformer With Dp Structure & Other Accessories For Drug Ware House And Newly Constructed Fire Pump House, Scbmch, Cuttack
BOQ
| Sl. No. | Item Description |
| 1 | PART-A :- Construction of 11 KV O/H line of 0.08 CKM using 55 Sq.mm. XLPE AAAC Covered Conductor along with cutpoint arrangementNo. of Cut Point with 180 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0004)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 2 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 4 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no'sChannel(GI) required =(2x9.56x0.306) |
| 5 | Danger Plate, 1 no's. |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting(B&S) 70KN, 3Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthing of Support ( Coil Type ) |
| 13 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 14 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 15 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 16 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 17 | Black Paint(GIS Numbering & Zebra Stripping) |
| 18 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 19 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 20 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 21 | No. of Cut Point with 90 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0005)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 22 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 23 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 24 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no'sChannel(GI) required =( 4x9.56x0.306) |
| 25 | Danger Plate, 1 no's. |
| 26 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 27 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 28 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 29 | 11 KV pin insulator polymer |
| 30 | H W fitting(B&S) 70KN, 3Bolt |
| 31 | Disc insulator (B&S) 70 KN polymer |
| 32 | Earthing of Support ( Coil Type ) |
| 33 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 34 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 35 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 36 | WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR |
| 37 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 38 | H.T. Stay set (Complete ) |
| 39 | H.T. Stay Insulator Type-C |
| 40 | 7/10 SWG Stay Wire 15kg /stay |
| 41 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 42 | Black Paint(GIS Numbering & Zebra Stripping) |
| 43 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 44 | Civil & ServicesFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 45 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 46 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 47 | 11 Kv Line Length In KM with 40 Mtr. Span(Ref. Drawing No.- TPCODL-MVD-0003)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 48 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 49 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 50 | Danger Plate, 1 no's. for each pole |
| 51 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 52 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 53 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 54 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 55 | Earthing of Support ( Coil Type ) |
| 56 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 57 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 58 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 59 | Black Paint(GIS Numbering & Zebra Stripping) |
| 60 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 61 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 62 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 63 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 64 | Part-B :- Construction of 11KV Line Guarding from pole to pole for road crossingGuarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI)length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 65 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 66 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 67 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 68 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 69 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)=10.7x2.36 |
| 70 | Civil & ServicesConstruction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 71 | Part C :- Installation of One No. of 11KV DP with AB Switch and LA for HT metering unit WPB(GI) 160x152 (11Mtr. Long, 30.44KG/Mtr.) -DP |
| 72 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required =( 2x9.56x3) |
| 73 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 74 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 75 | HT MU Mounting Channel(GI) 100X50X6mm, 9.56KG/Mtr, each Channel(GI) length 3 Mtr.,2 no's Channel(GI) required =( 9.56x3x2) |
| 76 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 77 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 - 1282 mm.each 2nos.(4.5 K.g. per mtr.) |
| 78 | MU and AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., eachChannel(GI) length 0.35 mtr., 4 no's Channel(GI) required =( 9.56x4x0.35) |
| 79 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 80 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 81 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 82 | Danger Plate, 2 no's. |
| 83 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2no's = (2x0.59x0.510) |
| 84 | 55mm2 ACSR - PVC Insulated for Jumpering |
| 85 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 86 | H.T. Stay set (Complete ) |
| 87 | H.T. Stay Insulator Type-C |
| 88 | 7/10 SWG Stay Wire 15kg /stay |
| 89 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 90 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body,2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36 |
| 91 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 92 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 93 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 94 | AB Switch (11KV,200A.3pole,50Hz) |
| 95 | 11 KV pin insulator polymer |
| 96 | H W fitting(B&S) 70KN, 3Bolt |
| 97 | Disc insulator (B&S) 70 KN polymer |
| 98 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 99 | GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 100 | POLYCARBONATE BIRD GUARD |
| 101 | Black Paint(GIS Numbering & Zebra Stripping) |
| 102 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 103 | Civil & ServicesFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 104 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) =0.45Cu.mtr(Per Pole) |
| 105 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cumtr(Per Pole) |
| 106 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 107 | Supply and Erection of GI Fencing with Gate |
| 108 | Part D :- Dismentling of MaterialsDismantling of 9/8 Mtr. PCC/Joist Pole |
| 109 | Part- E Supply & Installation of 11/0.4 KV 500 KVA DSSWPB 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 110 | Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 111 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 112 | Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 2 no's channel required =( 7.14x3x2) |
| 113 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 2 nos angle required = (4.5x3.512x2) |
| 114 | AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 115 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35) |
| 116 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1) |
| 117 | HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 39.98 Kg) |
| 118 | Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 119 | Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 120 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 121 | 500 KVA , 11/ 0.4 KV (Cu) Transformer with Motorisied OLTC & RTCC Panel BIS Energy level II |
| 122 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 500 KVA S/S |
| 123 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 124 | 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 125 | AB Switch(11KV,200A.3pole,50Hz) |
| 126 | H.G.Fuse( 11KV.200A.3Pole) |
| 127 | PG Clamp for 55 sq.mm AAA conductor |
| 128 | Disc insulator (B&S)70 KN polymer |
| 129 | H W fitting (B&S)70KN(3bolted) |
| 130 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 131 | 11KV pin insulator polymer |
| 132 | HT stay set complete |
| 133 | HT stay Clamp (1.9Kg/pair) |
| 134 | HT stay insulator TYPE-C |
| 135 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 136 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 137 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 138 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 139 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's (Each 8x0.59x0.510) |
| 140 | Danger plate 11kv |
| 141 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's (Each 2x0.59x0.510) |
| 142 | Name plate |
| 143 | Yellow Colour Paint for Background |
| 144 | Black Colour Paint for numbering |
| 145 | Civil and Services Works-Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr |
| 146 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 147 | Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr |
| 148 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including, installation of 3 Mtr GI pipe 40/50 mm including welding of GI flat around pipe. |
| 149 | LTDB Plinth |
| 150 | DTR Plinth Up to 1000 KVA |
| 151 | Laying of 1.1 KV Cable upto 185 to 400 Sq mm |
| 152 | Supply and Erection of GI Fencing with Gate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 06, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysNov 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender