Housing Urban and Rular Development Government Departments Closing in 3 days TDR #58407385

Tender For Improvement Of Phulnakhara Niali Charichhak Gop Road From 36/000 Km To 42/000Km In The District Of Puri For The Year 2025-26

Issued by Government Departments · Puri, Odisha
Tender Value
5.68 Crore
Estimated cost
Bid Submission
25 Nov 2026
3 days left
EMD
5.69 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Puri → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Improvement Of Phulnakhara Niali Charichhak Gop Road From 36/000 Km To 42/000Km In The District Of Puri For The Year 2025-26

BOQ

Name of Work:- Improvement of Phulnakhara Niali Charichhak Gop road from 36/000 km to 42/000km in the district of Puri for the year 2025-26
Sl. No. Item Description
1Clearing and grubbing road land including uprooting vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per section 200, clause 201 of the MoRT&H Specifications for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer- in- charge.
2Earth work in excavation for road works toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge
3Scarifying and removing existing bituminous surface to a required depth and dispoasl of scarified materials within all lifts and lead upto 1000 mtrs as per technical specififcation as per Clause 501.8, 305.3.4 & all relevant sections / clauses of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge.
4Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and techinical specificationa as per section 900 and Clause 501.8 and all relevant sections / clauses of MoRT&H Specification for Road and Bridge works (5th Revision) and including all cost i.e cost of all materials ,all labour, all T&P , royality etc complete in all respect as per the direction of Engineer - in - Charge
5Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and as per clause -305 of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge.
6Providing compacted shoulder with granular materials by using moorum of approved quality, watering and compacting the required density in OMC with VRR as per approved drawing and technicial specification as per Section 900 and SECTION 400 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
7Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
8Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
9Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specification as per clause 406, section 900 and all relevant sections/ clauses of the MoRT&H Speification for road & Bridge works (5th Revision) & including all cost i.e cost of all matericals,all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
10Plain cement concrete M-15 in foundation as Levelling Coursewith crushed stone aggregates 40mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
11Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018. including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
12Providing and fixing pre-cast RCC (1:2:4) Kilometer stone as per I.R.C. design including finished smooth Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.Ordinary Kilometre stone
13Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting , 3mm/4mm thick alumunium composite material sheet depending on the size of sign vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel cicular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. The sign shall be maintained as per Section 12 of IRC-67.80 cm x 60 cm rectangular (Informatory Sign)
14Cautionary signs triangular (900mm equilateral trinagle)
15Circular 600mm dia
1690cm high Octagon ( Stop Sign)
17Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting fixed over alumunium sheeting 2mm thick or alumunium composite material sheet with overall thickness of 4mm vide Clause No. 801.3 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) with area not exceeding 0.9 Sqm fixed over back support frame of minimum 40x40x5 mm angle mounted on two nos of mild steel circular pipe 65NB, 3.2 mm thickness & 4.50mtr total height firmly fixed on ground by means of properly designed foundation with M-25 grade cement concrete 45x45x60cm, 60cm below ground level as per approved drawing including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. Directional/Place Identification signs (1200x700 mm)
18BOX CULVERTDismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantling materials, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead upto 1000 mtr. as per Clause No.202 of MoRT&H specifications for Road and Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.
19Earth work in excavation for road works toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge
20Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
21Plain cement concrete M-15 in foundation as Levelling Coursewith crushed stone aggregates 40mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
22Plain cement concrete M-15 inSub Structure including centering and shuttering with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
23Reinforced cement concrete M-25compacted by vibration including curing for 14 days as per Section 900, 1500,1700,2100 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect but excluding the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.In foundation
24In Sub-structure
25In superstructure
26Providing reinforced cement concrete crash barrier of M40 Grade Concrete at the edges of road, Culvert with HYSD reinforcement conforming to IRC :21 and dowel bars 25mm dia , 450 mm long at expansion joints filled with pre-moulded asphalt filler board keyed to the structure and installed as per design given in the MOST Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per approved drawing and technical specification as per section 900,1500,170, 2300, 2700 & all relevant sections/ clauses of MORT&H Specification for road & bridge works (5th or latest Revision) & as per direction of Engineer in charge.
27Supplying, fitting and placing uncoated HYSD bar reinforcement of primary steel producers such as SAIL/TATA/RINL/JINDAL STEEL/ SHYAM STEELetc. including cutting, bending and binding as per drawing and technical specification as per section 1600, section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P etc complete in all respect and as per direction of the Engineer- in- charge.
28Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
29Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
30Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 15 cm to 30 cm as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
31Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
32Reinforced cement concrete M-30 (Wearing coat) compacted by vibration including curing for 14 days as per Section No.900,1500,1600,1700,2300,2700 & all relevant sections/ clauses of MORT&H specifcation and cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect including the cost and conveyance of M.S Rod or TOR steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending ,bindind and tying the grills and placing in proper position and as per specification and direction of the Engineer- in- charge.
33Providing and fixing drainage spouts in deck slab with 1000 mm diameter G.I pipe completed for finished item of work as per approved drawing and techinical specifiations as per section 2700 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge.
34Painting two coats with synthetic enamel paint of approved quality and shade over a coat of primer at any elevation on kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
35TOE WALLEarth work in excavation for road works toe wall and CD works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and techinical specification including setting out dressing of section to correct line level grade & camber and loading into tippers transporting to embankment site within all lifts and lead upto 1000 mtr and utilising the surplus earth locally for road work whenevre required, backfilling the excavation earth to the extent required complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 300 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge
36Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
37Plain cement concrete M-15 in foundation as Levelling Coursewith crushed stone aggregates 40mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
38Plain cement concrete M-15 inSub Structure including centering and shuttering with crushed stone aggregates 20mm size and mixed , placed in foundation and compacted as per section 900, 1500, 1700, 2100, 2900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
39Providing weep holes in brick masonry / plain or RCC /abutment / wing wall , retaining wall/ toe wall with 100mm dia AC pipe extending through the full width of structure with slope of 1V : 20H towards draining face complete as per drawing and technical specification as per Clause - 2706 of MoRT&H Specition for Road & Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
40Providing laying of filter media with granular materials/ stone crushed aggregates of 45mm size or as satisfying the requirements laid down in section 900 and 2500 of MoRT&H specification to a thickness not less than 600mm with small size towards the soil and bigger towards the wall and provided over the entire surface behind abutment wing walls return walls to the full height compacted to a firm condition complete as per drawing and technical specification & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge.
41Gravel backing to approns & revetments and providing fliter material using gravel underneath pitching in slope as per approved drawings and techinical specification as per section 2500, 900 of Spectification for Road & Bridge works (5th Revision) and including all cost, conveyance of all materials, royalities with all labour, all T&P required for the work etc complete in all respect and as per direction of Engineer - in- charge.
42Rough stone dry packing in aprons revetments stone pitching in slopes and stone packing in boulder apron etc with hard granite stone of size 15 cm to 30 cm as per approved drawing and Section 2500, 900 of specifications for road and bridge works of Minister of Road Transfort & Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58407385
AUTHORITY Government Departments
TENDER VALUE 5.68 Crore
LAST DATE 25-11-2026
Authority
Authority Name Road And Building Department
Work Description Tender for Improvement Of Phulnakhara Niali Charichhak Gop Road From 36/000 Km To 42/000Km In The District Of Puri For The Year 2025-26
Basic Detail
Tender No CCE KHORDHA (RAND B) CIRCLE 12/2026-27
Bidding Type Tender
Location
City Puri
State Odisha
Key Dates
Publish Date 06 Nov 2026
Submission Date 25 Nov 2026
Open Date 26 Nov 2026
Finance
Tender Value 5.68 Crore
Tender Fee 10000
EMD 5.69 Lakhs
Exemption Available
Document List
3a01f2a2-68d3-4cfd-898c-3eef75e45ff4.html
BOQ_618627.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Nov 26, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
html

3a01f2a2-68d3-4cfd-898c-3eef75e45ff4.html

xls

BOQ_618627.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender