Tender For repair maintenace Of Lis Scheme Nouni Manjhyar In Gp Maan Tehsil Arki District Solan Hp (Sh:- Providing Laying & Jointing Hdpe Pipe Line And Construction Of Reinforced Cement Concrete Out Let Chamber 5 Nos. To Leftout Village Panan Under D
Tender Overview
Project Description
Tender for repair maintenace Of Lis Scheme Nouni Manjhyar In Gp Maan Tehsil Arki District Solan Hp (Sh:- Providing Laying & Jointing Hdpe Pipe Line And Construction Of Reinforced Cement Concrete Out Let Chamber 5 Nos. To Leftout Village Panan Under Dmft
BOQ
| Sl. No. | Item Description |
| 1 | Excavation drain & channels etc. earth all classification of earth work such as pick work jumper work pumping out water blasting softs /hard work in all same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring strutting, planking , timbering and dewatering wherever required , stacking usable and unusable material/ soil separately and after laying jointing and testing pipes, returning the usable soil in 15 Cm layers by ramming and watering and then desposing off all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of unmateled/ mateled surfaces top its orinal condition including cost of diversion of of trafffic, night signal boards, fixing of caution boards, crossing over trenches for acces to houses, fencuing etc. complete in all respects within all leads and lifts as per the directions of Engineer in Charge. |
| 2 | Providing laying & jointing high density polyethylene pipe with fussion welding process for buried water means and services duly ISI marked (IS-4984-1995) as amended upto date in the following dia material grade PE-100 pressure raiting of various dia including all leads and lifts carriage of materials at site as directed by the Engineer-in charge |
| 3 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 90 mm |
| 4 | Excavation in foundation, trenches etc. earth work in all type of soil such as pick work, jumper work, blasting work kankar,moorum singles including decomposed soft and hard rock etc. upto all heights stacking the excavated earth not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths and sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all leads and lifts as directed by the Engineer in charge complete in all respects. |
| 5 | Providing and laying cement concrete 1:4:8(1 Cement :4 Sand : 8 graded stone aggregate 40mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including all carriage of materials upto all leads and lifts complete in all respects. |
| 6 | Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. |
| 7 | Foundation and plinth complete in all respects. |
| 8 | Walls any thickness (but not less than 0.10meter thickness including attached pilasters,buttresses plinth and string courses etc. from top of foundationlevel upto floor two level including all leads and lifts etc.complete in all respects |
| 9 | Providing form work with mild steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu reinforced concrete work and plain concrete work in :- |
| 10 | Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. |
| 11 | Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level including cost of binding wires and carriage of materials upto all leads and lifts complete in all respects. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender