Tender For Outsourcing Of Operational Works Of Balijhara Water Works On Job Contract Basis For Two Years (2026-28)
Tender Value
6.68 Crore
Estimated cost
Bid Submission
28 Nov 2026
7 days left
EMD
13.36 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kendrapara → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Outsourcing Of Operational Works Of Balijhara Water Works On Job Contract Basis For Two Years (2026-28)
BOQ
| Sl. No. | Item Description |
| 1 | Supply of all materials & manpower in three shifts for smooth & continuous running, operation & maintenance of existing 27MLD water treatment plant(WTP) along with the water supply system of Balijhara Water Works(BWW) with proper tools & tackles including supply & dosing of chemicals of required quantity with all records, attending to preventive maintenance & breakdown (Major/Minor) to all the assets (The treatment plant along with its process units & all the equipments & facilities as per the detailed list i.e pumps, motors, DG Sets, electrical panels & parts, components of the switch/operating board) with supply of all spare parts required for maintenance, inspection of power lines, maintenance of illumination to the treatment plant premises, raw water & canal intake pump houses including changing of lights, push buttons, wiring if required, including maintenance of all aerators with electrical panels (complete system) and deployment of Engineering personnel to ensure an efficient, effective & sustainable water supply with the available resources on 'as is where is basis'. If during the operation the pumps, motors or any other equipments /installations are not in workable & repairable condition, then the replacement of the same from reputed manufacturers shall be made by the agency one to one at his/their own cost, functioning, running & maintenance of pumps, pipes, valves, electrical installations, instrumentation, maintaining log for running of electrical pumps, DG sets, Diesel Engine etc., to achieve drinking water confirming to IS standard etc. with supply of all labour, T&P etc. all complete for ensuring effective operation & maintenance of the water treatment plant as per direction of Engineer-in-charge. (Excluding GST) N.B.: 1)The Agency has to engage 45 Nos Skilled Labour, 09 Nos High-Skilled labour and the agency should Pay Labour wages as per the current notification published by the Ministry of labour/ PPA approved rate with EPF, ESI, PLR and PPE .The EPF, ESI, PLR, PPE & Wage Hike shall be reimbursed as per actual on submission of documentary evidence. |
| 2 | Cleaning of existing filter beds of specified size & number as per scope of work, topping up once in a year with supply of filter media consist of sand, pebbles of different sizes & activated carbon etc. asper requirement with supply of materials , labour, T&P, taxes, tollege etc. all complete as per the direction of Engineer-in-charge (Excluding GST) NB: Total 08 Nos Filter Bed Cleaning, one time in Every Year. |
| 3 | Cleaning of existing clarifloculators (No. 1, 2, 3 & 4) of 22 Mtr. dia once in a quarter (Three months) with supply of all labour, materials,T&P etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) NB: Total 04 Nos clarifloculators. |
| 4 | Testing of treated water once in a month as per IS Standard suitable for human consumption (Drinking & cooking) from out side lab (NABL Accredied lab)/ Govt. Laboratories including collection of sample in a container & transportation charges, submission of the test report to the Deptt. etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) |
| 5 | Operation & Maintenance of two nos. of flow meter installed in 450mm dia pipe at Raw water- I & II including minor & major components replacement if required with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, hire & running charges of all equipment taking all safety precautions during installation etc. all complete but excluding GST as directed by Engineer-in-charge.(Excluding GST) |
| 6 | Routine inspection & preventive maintenance of 2 nos. of water flow meter of 450mm dia. |
| 7 | Supply & replacement of display of flow meter (450mm dia). |
| 8 | Supply & replacement of UPS of flow meter (450mm dia). |
| 9 | Supply & replacement of card of flow meter (450mm dia). |
| 10 | Supply of all labour, T&P for cleaning of water hyacinth , other floating weeds, scum, other floating materials and wastes from Reservoir No.I, Intake and its surroundings including disposal of the same at identified location etc all complete as per direction of Engineer-in-charge (Excluding GST) . N.B.: 1)The Agency has to engage 07 Nos Un-Skilled Labour, The Agency Should Pay Labour Rate as per the current notification published by the ministry of labour/ PPA Approved rate with EPF, ESI,PPE and PLR. THe EPF, ESI, PPE, PLR & Wage Hike Amount shall be reimbursed as per actual on submission of documentary evidence. |
| 11 | Providing tractor for shifting of removed weeds/scum from embankment side including loading at one end and unloading at other end in low laying area including supply of all labour, T&P, hire & running charges of tractor etc all complete as per direction of Engiener-in-charge.(Excluding GST) N.B: No idle charge shall be paid. |
| 12 | Engagement of chain mounted poclain(2Cum Bucket) Long Boom for lifting of weeds, scums etc. with supply of machineries, POL, hire & running charges, operator expenses etc. all complete as per direction of Engineer-in-charge. (Excluding GST)N.B: No idle charge shall be paid. |
| 13 | Supplying, fitting, fixing of 3.55mm dia plastic coated wire mesh (50mm x 50mm) outside diameter 4.75 including fixing of barbed wire or GI wire with supply of all materials, labour, T&P, transportation charges, loading & unloading charges, tollage, royalties, taxs etc.all complete as per direction of Engineer-in-charge. .(Excluding GST) |
| 14 | Supplying, fitting, fixing of heavy duty G.I. Pipe including cutting, fabrication, laying proper position as per site requirement with supplying of all labour, materials, T&P, all taxes,loading at one end and unloading at other end, transportation, scaffolding at any height etc. all complete as per the direction of Engineer-in-charge .(Excluding GST) |
| 15 | 50mm. Dia heavy Duty G.I. Pipe. |
| 16 | 25mm. Dia heavy Duty G.I. Pipe. |
| 17 | Supply of medium size country boat made out of good quality dressed seasoned wood including painting,transporting application of leak proof treatment maintaining the boat in operational condition during the entire working period with supply of all materials, labour, T&P, taxes etc all compelte as per the direction of Engineer-in-charge(Excluding GST) |
| 18 | Cutting & cleaning of unwanted wild growths, Plant, by using bush cutter, engagement of labour, and disposing the same with supply all labour, T&P, machinery, taxes etc all complete as per direction of Engineer-in-charge. (Excluding GST) |
| 19 | Supply of Materials with T&P for day to day requirement in Balijhara Reservoir area etc all complete as per direction of Engineer-in-charge. (Excluding GST) |
| 20 | 12mm dia nylon rope |
| 21 | MS Crow bar |
| 22 | MS bill hook (Katuri) |
| 23 | Sickle |
| 24 | MS spade (Kodal) |
| 25 | Bamboo |
| 26 | Supplying, fitting, fixing of cast iron swing type foot valve confirming to IS 4038, flanged joint including cutting, fabrication, laying proper position as per site requirement with supplying of all labour, materials for Fitting and Fixing, T&P, all taxes,loading at one end and unloading at other end, transportation,Shoring Shuttering, Dewatering & scaffolding at any height etc. all complete as per the direction of Engineer-in-charge.(Excluding GST) |
| 27 | 200 mm dia |
| 28 | 250 mm dia |
| 29 | 350 mm dia |
| 30 | Cleaning and removing the chemical sludge from all drains inside BWW and Drain connecting to ATBK creek including cost of all labour, T&P, etc. all complete as directed by Engineer-in-charge .(Excluding GST) |
| 31 | Cleaning and removing the Chemical Sludge From MCHP bed wash pit inside BWW engaging required nos. 10HP sludge diesel pump sets including supply of diesel pump, operator expenses, transportation, labour, suction & delivery pipe, foot valve, T&P, taxes etc all complete as directed by the Engineer-in-charge (Excluding GST) |
| 32 | Engagement of JCB (1 Cum Bucket) for lifting of debris, scums etc. with supply of machineries, POL, lubricants,hire & running charges, operator expenses etc all complete as per direction of Engineer-in-charge. (Excluding GST)N.B: No idle charge shall be paid. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysNov 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender