Tender For Restoration Of bituminous Surface Damaged Due To Ugss Schemes And Water Supply Schemes At Naripallam South Side Road N/S Cross Road -056005R1049, Naripallam Sbm Toilet Main Road - 056005R1150, Sri Garden Thottampattti - 056005R1149 In Ward
Tender Overview
Project Description
Tender for Restoration Of bituminous Surface Damaged Due To Ugss Schemes And Water Supply Schemes At Naripallam South Side Road N/S Cross Road -056005R1049, Naripallam Sbm Toilet Main Road - 056005R1150, Sri Garden Thottampattti - 056005R1149 In Ward No.05. Royal Garden Main Road S/N - 056008R1261, Royal Garden West Side 1Stccross E/W - 056008R1262, Royal Garden West Side 2Nd Cross E/W -056008R1263, Bharathiyar Nagar 2Nd Cross W/E - 056009R1451, Bharathiyar Nagar 3Rd Cross W/E (Kovil Road Junction ) - 056009R1452, Bharathiyar Nagar Kovil Road From Side W/E - 056009R1453, Bharathiyar Nagar Main Road W/E - 056009R1454, Bharathiyar Nagar South Side 1St Cross N/S- 056009R1455, Bharathiyar Nagar South Side 2Nd Cross N/S -056009R1456, Bharathiyar Nagar South Side 3Rd Cross N/S - 056009R1457, Bharathiyar Nagar North Side 1St Cross S/N - 056009R1458, Bharathiyar Nagar North Side 2Nd Cross S/N & E/W Cross Road -056009R1459 , Bharathiyar Nagar North Side 3Rd Cross S/N - 056009R1460, Bharathiyar Nagar North Side 4Th Cross S/N & East Side Cross W/E - 056009R1461 In Ward No.09.Prasanth Street N/S-056021R1779 In Ward No.21, Municipal Colony Main Road Northeast-056028R2071 In Ward No.28, Sampath Nagar Main Road S/N-056029R1941 In Ward No.29
BOQ
| Sl. No. | Item Description |
| 1 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 2 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications |
| 3 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM/ surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications |
| 4 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Specification |
| 5 | Providing and laying tack coat of 2.0 kgs/10 sqm over the B.T surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications |
| 6 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg of plastic waste (50.30*10%=5.03Kg) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender