Tender For 1) Dcw Estimate For 1 No 8 Mtr. Psc Pole Shifting With 3 Phase Side Arm Stud Requested By Thivadudurai Aaditheenam Vagai, Senthilkumar, Ambalavanan Nager In Vallankumaranvilai Section 2) Dcw Estimate For Lt Line Deviation Of 2 Nos. 8 Mtr.
Tender Overview
Project Description
Tender for 1) Dcw Estimate For 1 No 8 Mtr. Psc Pole Shifting With 3 Phase Side Arm Stud Requested By Thivadudurai Aaditheenam Vagai, Senthilkumar, Ambalavanan Nager In Vallankumaranvilai Section 2) Dcw Estimate For Lt Line Deviation Of 2 Nos. 8 Mtr. Psc Pole Shifting Requested By Thiru. Commisssioner, Corporation, Nagercoil Inrespect Of Vallankumaranvilai Section. (3) Dcw Estimate For Ht Line Deviation Of 1 No. Rsj Pole Inserting Requested By Thiru. Secretary, Paravar Community Development Welfare Society, Pattasaliyanvilai, Nagercoil In Vallankumaranvilai Section. (4) Dcw Estimate For Adding Of Side Arm In Ht/Lt 9 Mtr Reinforced Cement Concrete Pole For Thiru. Rajasekar, Near Amman Kovil Under Vallankumaranvilai Section. (5) Dcw Estimate For Providing Ht/Lt Line Deviation Of 1 No Guarding X Arm With Stud And 3 Phase Side Arm With Stud Request Of Thiru. Periyasamy, Kalainagar, Kottar Under Vallankumaranvilai (6) Dcw Estimate For Lt Line Deviation Of 1 Nos. 8 Mtr. Psc Pole Shifting Requested By Thirumathy. Rengammal, Sm Nagar, Kunchanvilai Vallankumaranvilai Section. (7) Dcw Estimate For Ht/ Lt Line Conversion Of Guarding X Arm With Stud Requesed By Thiru. Vignesh Raja, Bharathinagar, Thattanvilai Under Vallankumaranvilai Section. (8) Dcw Estimate For Ht/Lt Line Deviation Of 1 No. 9 Mtr. Psc Pole Shifting With Stay Requested By Thiru. The President, Arulmigu Muthumariamman Kovil Vagai, Vadalivilai Under Vallankumaranvilai Section. (9) Capital Estimate For 1 No. Tariff Iiib New Service Requested By Tmy. M. Ramisha, Kurusady, Kalainagar Feeder Under Vallankumaranvilai Section In Meenakshipuram Subdivision Under Nagercoil Division In Kanyakumari Electricity Distributin Circle.
BOQ
| Sl. No. | Item Description |
| 1 | Excavation of 8 mtr pole pit (1.25m * 0.5m*1.5m)(normal ground) |
| 2 | Excavation of 9,9.14 mtr pole pit (1.25m * 0.5m*1.5m) Rockey ground ( Hard soil) |
| 3 | Excavation of Steels Joist 30' length and above lengt pole pit (1.25m * 0.5m*2.19 m)(normal ground) |
| 4 | Excavation of Steels Joist 30' length and above lengt (1.25m * 0.5m*2.19m) Rockey ground ( Hard soil) |
| 5 | Excavation of Steels Joist 36' and above lengt pole pit (1.25m * 0.6m*2.19 m)(normal ground) |
| 6 | Erection of 8 mtr pole pit (1.25m * 0.5m*1.5m)(normal ground) |
| 7 | Erection of 9,9.14 mtr pole pit (1.25m * 0.5m*1.5m) Rockey ground ( Hard soil) |
| 8 | Erection of Steels Joist 30' length and above lengt pole pit (1.25m * 0.5m*2.19 m)(normal ground) |
| 9 | Erection of Steels Joist 30' length and above lengt (1.25m * 0.5m*2.19m) Rockey ground ( Hard soil) |
| 10 | Excavation of stay pit (1.0m * 0.5m*1.5m) normal ground |
| 11 | Excavation of stay pit (1.0m * 0.5m*1.5m) Rockey ground ( Hard soil) |
| 12 | Erection of stay pit (1.0m * 0.5m*1.5m)(normal ground) |
| 13 | Erection of transformer Upto 200 KVA/ Metering set |
| 14 | Erection of Single Phase service connection |
| 15 | Erection of Three Phase service connection |
| 16 | Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sand, jally, from box and water curing for 14 days etc,.complete. |
| 17 | Loading and unloading of 8m pole PSC Pole |
| 18 | Loading and unloading of 9m PSC Pole / Square pole |
| 19 | Loading and unloading of Up to RSJ 36' |
| 20 | Loading and unloading of RSJ 36' above Pole |
| 21 | Loading and unloading of Line Materials |
| 22 | Loading and Unloading of distribution transformer / store/ Spl Maintenenace /Pocket store below 250 KVA |
| 23 | Fixing of V cross arm 4 1/2' / Tapping channel cross arm |
| 24 | Fixing of LT three phase cross arm |
| 25 | Fixing of LT single phase cross arm |
| 26 | Fixing of HT / LT TI fitting |
| 27 | Erection of LT Side arm with stud |
| 28 | Fixing of LT Pin insulator |
| 29 | Fixing of LT Shackle Insulator |
| 30 | Fixing of Aluminium Knob |
| 31 | Fixing of HT Pin Insulator |
| 32 | Fixing of 11 KV Disc |
| 33 | Fixing of Guarding cross arm |
| 34 | Fixing of one earthing device including earthing |
| 35 | Stringing, Sagging, binding For7/3.15 and 7/3.35 ACSR pin point |
| 36 | Stringing, Sagging, binding For 7/2.59 ACSR &7/2.50 AAAC pin point |
| 37 | Stringing, Sagging, binding For 7/3.35 ACSR,7/3.15 AAAC pin point |
| 38 | Stringing, Sagging, binding For 7/3.35 ACSR,7/3.15 AAAC cut point |
| 39 | Dismantling of poles above 8 mtr without concrete in damaged condition including grill separation etc., |
| 40 | Dismantling of deteriorated up to 8m RCC Poles including removing grill with out concrete. |
| 41 | Dismantling of deteriorated up to 8m RCC Poles including removing grill with concrete. |
| 42 | Dismantling of V cross arm 4 1/2' / Tapping channel cross arm |
| 43 | Dismantling of LT three phase cross arm |
| 44 | Dismantling of LT single phase cross arm |
| 45 | Dismantling of HT / LT TI fitting |
| 46 | Dismantling of LT Pin insulator |
| 47 | Dismantling of LT Shackle Insulator |
| 48 | Dismantling of Aluminium Knob |
| 49 | Dismantling of HT Pin Insulator |
| 50 | Dismantling of 11 KV Disc |
| 51 | Dismantling of Guarding cross arm |
| 52 | Dismantling of 7/3.15 and 7/3.35 ACSR pin point |
| 53 | Dismantling of 7/2.59 ACSR &7/2.50 AAAC pin point |
| 54 | Dismantling of 7/3.35 ACSR,7/3.15 AAAC pin point |
| 55 | Dismantling of stay set complete |
| 56 | Drilling / Less than 23mm holes per hole /slotted holes |
| 57 | Tree clearence in HT or LT location For ordinary tree clearence and Throne bushes & trees |
| 58 | Transporting of poles from road side to pole pit upto 2 KM 8m pole |
| 59 | Transporting of poles from road side to pole pit upto 2 KM 9m pole |
| 60 | Transporting of poles from road side to pole pit upto 2 KM Up to RSJ 36' |
| 61 | Transporting of poles from road side to pole pit upto 2 KM Above RSJ 36' pole |
| 62 | Transporting of line materials from Section office to work Spot up to 20 Km |
| 63 | Erection of Double pole Distribution Transformer structure as per TNEB standard including painting, feeders arrangement, colour washing of RCC poles etc., Fixing of poles type to be unit HT/LT LAS and jumpering 3 nos earth pit with earth trough except erection of Distribution Transformer Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender