Tender For Mtps-Ii(1X600mw) - Mill Plant Division - Ac & Ventilation System - Overhauling Of Butterfly Valves / Gate Valves / Globe Valves / Nrvs Of Various Sizes Available At Chiller Unit & Air Washer Unit And Providing Of Insulation For Cooling Air
Tender Overview
Project Description
Tender for Mtps-Ii(1X600mw) - Mill Plant Division - Ac & Ventilation System - Overhauling Of Butterfly Valves / Gate Valves / Globe Valves / Nrvs Of Various Sizes Available At Chiller Unit & Air Washer Unit And Providing Of Insulation For Cooling Air Ducts & Pipelines In Air Conditioning And Ventilation System During Coh 2026 - 27.
BOQ
| Sl. No. | Item Description |
| 1 | Charges for fixing and removing the scaffolding arrangements for removing of valves for overhauling and to refix the same after completion of works in Air Washer units at TG building 8.5 & 31.75 Mtr (Scaffolding Materials are under contractor scope) |
| 2 | Charges for Dismantling, overhauling, lapping and replacing the spares if necessary in butterfly valves / gate valves / globe valves / NRV's of sizes 50NB, 65NB, 80NB & 100NB and assembling in position after replacing the gasket, replacing of damaged valves including the cost of transporting, consumables, lead, lift etc., |
| 3 | Charges for Dismantling, overhauling, lapping and replacing the spares if necessary in gate valves / globe valves / NRV's of sizes 200NB and assembling in position after replacing the gasket including the cost of consumables, lead, lift etc., |
| 4 | Charges for fixing and removing the scaffolding arrangements for providing of Insulation for Outlet duct from Air Handling Units at TG building 17 Mtr turbine pocket store room & switchyard control room (Scaffolding Materials are under contractor scope) |
| 5 | Charges for insulating of the fabricated air Duct at TG building 20 Mtr Air Handling unit and Switchyard control room by packing of insulation wool, tightening the insulation wool with GI wire mesh & covering the insulation wool with Aluminum foil insulation / GI Sheet including the cost of materials, consumables, lead, lift etc., |
| 6 | Charges for fixing and removing the scaffolding arrangements for providing of insulation for pipelines from TG building \\"0\\" mtr near chiller unit to TG building 31.75 Mtr cooling tower (Scaffolding Materials are under contractor scope) |
| 7 | Charges for providing of new insulation for Cooling tower outlet water line from TG building 31.75 Mtr to TG building \\"0\\" Mtr chiller unit including the cost of consumables, T&P, lead, lift etc., |
| 8 | Charges for plastering (over the insulation) the Cooling tower outlet water line from TG building 31.75 Mtr to TG building \\"0\\" Mtr chiller unit including the cost of consumables, T&P, lead, lift etc., |
| 9 | Material charges for insulation wool for cooling air duct including the cost of transporting, consumables, lead, lift etc., Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender