Bids Are invited for Swm Aqi
Tender Overview
Project Description
Bids Are invited for Swm Aqi Site Preparation , Waste To Art , Sculpture , Road Junction , Garden Monument , Waste To Wonder Park , School Or Garden Installations , Entry Gate , Metal Sheet Art , Artistic Painting , 3D Painting , Wall Painting , 3D Wallpaper , Wall Repair , Backdrop , Best Out Of Waste , Competition , R Centre , Litter Bins , Public Awareness , Lighting , Electrical , Foundation , Transport , Lifting , Safety , Documentation , Swm Education , Swm Operations , Accessibility , Drainage , Maintenance , Boundary Wall - Site Preparation - Site Cleaning, Loose Waste Removal And Surface Preparation For Art Installation , Site Preparation - Scrubbing/Cleaning Existing Wall Surface Before Painting Or Wallpaper Application , Site Preparation - Removal Of Loose Paint/Old Poster And Preparation Of Boundary Wall , Waste To Art - Simple Waste To Art Monument, Up To Approx. 1.5 M High Reused Material, Fabrication, Fixing And Protective Coating , Waste To Art - Moderate Waste To Art Monument, Approx. 1.5 To 3 M High Mixed Reused Metal/Plastic Components, Frame And Finish , Waste To Art - Large Waste To Art Monument, Approx. 3 To 5 M High Engineered Frame, Reused Material And Weather Resistant Finish , Sculpture - Custom Waste-Material Sculpture For Public Garden / Campus , Sculpture - Custom Sculpture/Artifact Quoted As Complete Designed, Fabricated And Installed Piece , Road Junction - Waste To Wonder Roundabout Sculpture/Central Feature, Approx. 2 To 3 M, Fabricated And Installed , Road Junction - Central Island Base/Raised Plinth With Concrete Finish For Art Installation , Garden Monument - Waste To Wonder Monument/Plaza Feature In Public Garden , Waste To Wonder Park - Themed Waste To Wonder Play/Learning Zone Using Safe Reused Materials, Basic Layout And Installation , School Or Garden Installations - Small Educational Waste To Wonder Installation For School/Garden , Entry Gate - Waste To Wonder Entry Gate Feature Using Reused Metal/Art Panels With Frame And Installation , Entry Gate - Waste To Wonder Themed Entrance Arch/Gateway, Complete , Metal Sheet Art - Supply/Prepare Used Metal Sheet Panels, Cut/Shaped, Deburred, Fixed To Support And Coated , Artistic Painting - Artistic Painting On Metal Sheet/Panel, Primer, Design And Protective Exterior Coat , 3D Painting - 3D Floor/Wall Optical Illusion Artwork With Surface Preparation And Protective Coating , Wall Painting - Environmental/Swm Awareness Mural On Prepared Wall , Wall Painting - Detailed Hand Painted Mural Or High Detail Artwork , 3D Wallpaper - Outdoor Rated 3D Printed Mural/Wallpaper, Adhesive, Fixing And Finishing On Prepared Wall , Wall Repair - Minor Crack Filling / Local Plaster Repair Before Artwork , Backdrop - Backdrop Structure From Reused Material With Supporting Frame, Anchoring And Installation , Backdrop - Artistic Painting Or Finishing To Waste To Wonder Backdrop , Best Out Of Waste - Best Out Of Waste Artifact Display/Installation, School Or Public Venue , Competition - School Level Best Out Of Waste Competition Event Package , Competition - Competition Participant Kit Or Material Allowance , Rrr Centre - Rrr (Reduce, Reuse, Recycle) Centre Basic Civil Fit Out And Allocated-Space Development , Rrr Centre - Shelving/Racks And Sorting/Display Units , Rrr Centre - Signage, Category Labels And Information Panels For Rrr Centre , Rrr Centre - Weighing Scale For Incoming Reusable Items , Rrr Centre - Segregated Storage Bins/Containers For Reusable, Recyclable And Reject Material , Litter Bins - Outdoor Litter Bin, Approx. 60 To 80 L, Weather-Resistant, With Fixing And Installation , Litter Bins - Three-/Four-Stream Public Litter Bin Station With Labels And Anchoring , Litter Bins - Custom Waste To Wonder Art Bin / Bin Enclosure Using Reused Material , Public Awareness - Swm Information/Interpretation Board Explaining Waste Used In Each Artwork , Lighting - Outdoor Led Accent/Floodlight For Sculpture With Mounting And Basic Installation , Lighting - Decorative Solar Spotlight For Artwork / Monument , Electrical - Outdoor Distribution Box With Mcb/Rccb, Timer And Weatherproof Enclosure , Foundation - Concrete Foundation/Plinth For Artifact, Including Anchor Bolts And Grout , Transport - Transport And Unloading Of Artifact Within Assumed Local Lead Up To 25 Km , Lifting - Crane/Hydra For Installation Of Large Artifact , Safety - Protective Coating / Anti Corrosion Clear Coat To Outdoor Metal Artwork , Safety - Anti Vandal / Uv Resistant Protective Coating For Mural Or Print , Documentation - Artwork Concept, Shop Drawings, Material Inventory, Installation Method And Handover Records , Swm Education - Waste Segregation, Reuse And Upcycling Awareness Workshop , Swm Operations - Collection, Cleaning And Sorting Of Suitable Reusable Waste For Art Fabrication , Swm Operations - Safe Preparation Of Waste Materials Washing, De Nailing, Deburring, Cutting And Surface Treatment , Accessibility - Accessible Path To Ramp And Tactile To Directional Treatment To Art Zone Or Rrr Centre , Drainage - Surface Drainage Around Art Plaza To Installation Zone , Maintenance - Annual Inspection, Tightening, Cleaning, Touch Up Paint And Anti Corrosion Maintenance Per Monument , Boundary Wall - Precasted Boundary Wall Of 2.1M Height Along With Metal Entry Gate Of 5M Length And Allied Fitting , Boundary Wall - Wire Fencing Type Boundary Wall With A Height Of 2.1M Along With Metal Entry Gate Of 5M Length And Allied Fitting
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Site preparation | Site cleaning, loose waste removal and surface preparation for art installation |
| 2 | Site preparation | Scrubbing/cleaning existing wall surface before painting or wallpaper application |
| 3 | Site preparation | Removal of loose paint/old poster and preparation of boundary wall |
| 4 | Waste to Art | Simple Waste to Art monument, up to approx. 1.5 m high reused material, fabrication, fixing and protective coating |
| 5 | Waste to Art | Moderate Waste to Art monument, approx. 1.5 to 3 m high mixed reused metal/plastic components, frame and finish |
| 6 | Waste to Art | Large Waste to Art monument, approx. 3 to 5 m high engineered frame, reused material and weather resistant finish |
| 7 | Sculpture | Custom waste-material sculpture for public garden / campus |
| 8 | Sculpture | Custom sculpture/artifact quoted as complete designed, fabricated and installed piece |
| 9 | Road junction | Waste to Wonder roundabout sculpture/central feature, approx. 2 to 3 m, fabricated and installed |
| 10 | Road junction | Central island base/raised plinth with concrete finish for art installation |
| 11 | Garden monument | Waste to Wonder monument/plaza feature in public garden |
| 12 | Waste to Wonder park | Themed Waste to Wonder play/learning zone using safe reused materials, basic layout and installation |
| 13 | School or garden installations | Small educational Waste to Wonder installation for school/garden |
| 14 | Entry gate | Waste to Wonder entry gate feature using reused metal/art panels with frame and installation |
| 15 | Entry gate | Waste to Wonder themed entrance arch/gateway, complete |
| 16 | Metal sheet art | Supply/prepare used metal sheet panels, cut/shaped, deburred, fixed to support and coated |
| 17 | Artistic painting | Artistic painting on metal sheet/panel, primer, design and protective exterior coat |
| 18 | 3D painting | 3D floor/wall optical illusion artwork with surface preparation and protective coating |
| 19 | Wall painting | Environmental/SWM awareness mural on prepared wall |
| 20 | Wall painting | Detailed hand painted mural or high detail artwork |
| 21 | 3D wallpaper | Outdoor rated 3D printed mural/wallpaper, adhesive, fixing and finishing on prepared wall |
| 22 | Wall repair | Minor crack filling / local plaster repair before artwork |
| 23 | Backdrop | Backdrop structure from reused material with supporting frame, anchoring and installation |
| 24 | Backdrop | Artistic painting or finishing to Waste to Wonder backdrop |
| 25 | Best out of Waste | Best out of Waste artifact display/installation, school or public venue |
| 26 | Competition | School level Best out of Waste competition event package |
| 27 | Competition | Competition participant kit or material allowance |
| 28 | RRR centre | RRR (Reduce, Reuse, Recycle) centre basic civil fit out and allocated-space development |
| 29 | RRR centre | Shelving/racks and sorting/display units |
| 30 | RRR centre | Signage, category labels and information panels for RRR centre |
| 31 | RRR centre | Weighing scale for incoming reusable items |
| 32 | RRR centre | Segregated storage bins/containers for reusable, recyclable and reject material |
| 33 | Litter bins | Outdoor litter bin, approx. 60 to 80 L, weather-resistant, with fixing and installation |
| 34 | Litter bins | Three-/four-stream public litter bin station with labels and anchoring |
| 35 | Litter bins | Custom Waste to Wonder art bin / bin enclosure using reused material |
| 36 | Public awareness | SWM information/interpretation board explaining waste used in each artwork |
| 37 | Lighting | Outdoor LED accent/floodlight for sculpture with mounting and basic installation |
| 38 | Lighting | Decorative solar spotlight for artwork / monument |
| 39 | Electrical | Outdoor distribution box with MCB/RCCB, timer and weatherproof enclosure |
| 40 | Foundation | Concrete foundation/plinth for artifact, including anchor bolts and grout |
| 41 | Transport | Transport and unloading of artifact within assumed local lead up to 25 km |
| 42 | Lifting | Crane/hydra for installation of large artifact |
| 43 | Safety | Protective coating / anti corrosion clear coat to outdoor metal artwork |
| 44 | Safety | Anti vandal / UV resistant protective coating for mural or print |
| 45 | Documentation | Artwork concept, shop drawings, material inventory, installation method and handover records |
| 46 | SWM education | Waste segregation, reuse and upcycling awareness workshop |
| 47 | SWM operations | Collection, cleaning and sorting of suitable reusable waste for art fabrication |
| 48 | SWM operations | Safe preparation of waste materials washing, de nailing, deburring, cutting and surface treatment |
| 49 | Accessibility | Accessible path to ramp and tactile to directional treatment to art zone or RRR centre |
| 50 | Drainage | Surface drainage around art plaza to installation zone |
| 51 | Maintenance | Annual inspection, tightening, cleaning, touch up paint and anti corrosion maintenance per monument |
| 52 | Boundary Wall | Precasted boundary wall of 2.1m height along with metal entry gate of 5m length and allied fitting |
| 53 | Boundary Wall | Wire Fencing type boundary wall with a height of 2.1m along with metal entry gate of 5m length and allied fitting |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender