Tender For Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning Etc. For Conversion Of 132Kv Nahtor(220)-Fajalpur Tss From 2Phase Sc Line To 3Phase Dc Line (Approx. 34.78 Route Km) Of Upptcl Under Tran
Tender Overview
Project Description
Tender for Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning Etc. For Conversion Of 132Kv Nahtor(220)-Fajalpur Tss From 2Phase Sc Line To 3Phase Dc Line (Approx. 34.78 Route Km) Of Upptcl Under Transmission West, Meerut, On Turn-Key Basis
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Nov-2026 | Corrigendum1 | Other | 03-Dec-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Schedule-3 Summary Tender Inviting Authority: Superintending Engineer, Electricity Transmission Design Circle, 10th Floor, Shakti Bhawan Extension, 14-Ashok Marg, Lucknow-226001 Name of Work: Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning etc. for Conversion of 132kV Nahtor(220)-Fajalpur TSS from 2Phase SC line to 3Phase DC line (approx. 34.78 route km) of UPPTCL under Transmission West, Meerut, on Turn-key basis Tender No: TD-570/26 Bidder Name & Address : SCHEDULE OF QUANTITIES AND PRICES (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name, Address and Values only) |
| 2 | Total Price for Supply [Schedule S-1] |
| 3 | Total Price for Work [Schedule S-2] |
| 4 | Total Price [S-1 + S-2] |
| 5 | GST @18% [18% of 3] |
| 6 | Total Bid Price including GST [3+4] Date: Signature Bidder Name: Designation : Name & Address of Company SCHEDULE S-1 : (SUPPLY OF MATERIAL) Tender Specification No.: TD-570/26 Name of Firm: S N Item Unit QTY Ex-Work per unit rate (Rs.) Freight (Rs.) P&F (Rs.) INS (Rs.) Unit FOR Destination rate (Rs.) Total Amt (Exclusive of GST) (Rs.) |
| 7 | TOWERS (a) Fabrication, galvanizing, Inspection and supply of DC towers including stubs, extension and stub-setting templates, gantry structures as per drawings & BOM (i) Mild steel MT 190.67 0.0 0.0 (b) Hot dip galvanized, Hexagon round hexagon head transmission tower Bolts Nuts and washers for above structures as per BOM MT 8.14 0.0 0.0 |
| 8 | TOWER ACCESSORIES (a) Number Plate Nos. 119.0 0.0 0.0 (b) Danger Plate Nos. 60.0 0.0 0.0 (c) Phase Plate in sets of red, blue and yellow for Tension towers Nos. 60.0 0.0 0.0 (d) Bird Guard for towers Nos. 48.0 0.0 0.0 (e) Pipe type earthing material for towers Nos. 119.0 0.0 0.0 |
| 9 | POLYMER INSULATORS / COMPOSITE SILICON RUBBER INSULATOR STRING (a) 70 KN suitable for 132 KV suspension fitting per string 376.0 0.0 0.0 (b) 120 KN suitable for 132 KV tension fitting per string 358.0 0.0 0.0 |
| 10 | HARDWARES SUITABLE FOR ACSR PANTHER (a) Single suspension fittings Nos. 368.0 0.0 0.0 (b) Single Tension fittings Nos. 314.0 0.0 0.0 (c) Double Tension fittings Nos. 24.0 0.0 0.0 |
| 11 | EARTHWIRE (a) Earth wire GS (7/3.25 mm) KM 10.35 0.0 0.0 |
| 12 | HARDWARES SUITABLE FOR EARTHWIRE 7/3.25 mm (a) Mid Span compression Joint Nos. 12.0 0.0 0.0 (b) Vibration Dampers Nos. 46.0 0.0 0.0 (c) Copper Bond Nos. 23.0 0.0 0.0 |
| 13 | CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER (a) Vibration Dampers Nos. 1044.0 0.0 0.0 (b) Mid Span compression Joint Nos. 50.0 0.0 0.0 (c) Repair sleeves Nos. 50.0 0.0 0.0 (d) Preformed Armour Rod Nos. 340.0 0.0 0.0 Total 0.0 NOTE: * One set of installation hardware set shall contain all installation hardware fittings & accessories as may be required for 1 km of OPGW/Fibre Optic Approach Cable. * Tenderer must quote their rates for Ex-Works, Packing and Forwarding, Freight and Insurance Charges separately in Indian Rupees and upto 02 decimal places only as per Columns of above Price Schedule. * GST shall be paid extra (applicable at the time of supply/work) on total of Ex-Works, Packing and Forwarding, Transportation and Insurance Charges. Present rate of GST on work contract is 18%. Signature Date: Bidder Name: Designation : Name & Address of Company SCHEDULE S-2 : (ERECTION WORK) Tender Specification No.: TD-570/26 Name of Firm: S N Description Unit QTY Unit Rate (Rs.) Amount Exclusive of GST (Rs.) |
| 14 | Check survey |
| 15 | Soil testing |
| 16 | Cost of excavation of 132 KV tower foundation pits including all earth work,backfilling, levelling etc. |
| 17 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers : (a) 132 KV DA Nos. 8.0 0.0 (b) 132 KV DB Nos. 2.0 0.0 (c) 132 KV DC/DE Nos. 13.0 0.0 |
| 18 | Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars (a) 1:2:4 concreting Cu.m. 585.403 0.0 |
| 19 | Erection of Superstructure of 132KV/220KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 132/220KV SC/DC/MC lines |
| 20 | Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers. |
| 21 | Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Two phases of 132 KV SC/DC lines |
| 22 | Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Four phases of 132 KV DC lines |
| 23 | Laying, stringing, tensioning, clamping, jointing of Earthwire ,including fittings of all necessary Hardware and accessories |
| 24 | Grounding work including earth work etc for pipe type grounding including cost of coke & salt. |
| 25 | Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc. |
| 26 | Railway track crossing/Railway TSS/Line crossing/other power line crossing in HOT/Live condition for 132 KV line |
| 27 | ERS Work: Transportation, Erection and commissioning of ERS Tower at 132 KV Nehtaur(220)-Fazalpur Railway TSS line under ETD Dhampur (a) ERS material Transportation from 220KV S/S Gokul store to work location under the jurisdiction of 132 KV Nehtaur (220) Fazalpur Railway TSS line (Dist. Approx. 240 Km) under transit insurance and returning to 400 KV Substation Greater Noida store under transit insurance as received originally. Note-All parts of ERS system is to be returned except consumables like conductor, fitting etc. Nos 22.0 0.0 (b) ERS Tower Erection at line sections complete in all respeets with anchoring arrangement and safely dismantling of ERS Material at site 132 KV Nehtaur (220) Fazalpur Railway TSS line. Nos 126.0 0.0 (c) (i) De-stringing of 2 Phase Conductor of 132 KV Nehtaur(220)-Fazalpur Railway TSS line. (ii) Stringing of 2 Phase Conductor of 132 KV Nehtaur(220)-Fazalpur Railway TSS line after erection of ERS tower and jumpering at both end and associated works. (iii) De-stringing of all 2 Phase Conductors of ERS line sections of 132 KV Nehtaur(220)-Fazalpur Railway TSS line and safe removal of ERS Towers after restoration of main transmission line and properly rolling of conductor in drums (provided by department) and safely shifting of conductor in the store under ETD-Dhampur. Km 31.5 0.0 (d) Arrangement of watch and ward round the clock with atleast 2 nos security guards security in each shift at ERS location and from start of ERS installation work to till the dismantling of ERS tower and conductor with hardware fittings is done at site. Days 60.0 0.0 Total 0.0 Date: Signature Bidder Name: Designation : Name & Address of Company |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender