Tender For Group C - External Painting Works Of Storage Tanks, Station Piping & Associated Structures Across Installations Of Western Region Pipelines (Wrpl).
Tender Value
1.92 Crore
Estimated cost
Bid Submission
26 Nov 2026
7 days left
EMD
49000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pali → Rajasthan
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Group C - External Painting Works Of Storage Tanks, Station Piping & Associated Structures Across Installations Of Western Region Pipelines (Wrpl).
BOQ
| Sl. No. | Item Description |
| 1 | GST % for the tender Please select the rate of GST in cell AY13. Default GST rate is already filled, however, bidder can select the GST with proper justification. |
| 2 | Painting at Kot |
| 3 | Tank Surface Preparation and Painting works: (refer detailed technical specs): The scope includes surface preparation to defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing all required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per technical specifications and instructions of EIC/ Site Engineer. |
| 4 | Surface preparation of corroded area : For highly corroded areas on roof & Shell(as specified by owner) etc. surface preparation is to be done by wetabrasive / wet sand blasting (Water ring blasting) @ 100 psi minimum toremove old paint, to get a surface to near white metal, making anchoring profile Appropriate equipment such as water ring blasters, etc shall beused. The detailed description of the equipment to be submitted alongwith the tender. Continuous flow of water is to be ensured as the workis to be carried out in an operating tank. Surface preparation shallconfirm to NACE std. NACE No.3/SSPC SP-6 WAB. All safety precautions likemud plugging of any gap between primary/secondary seal & tank shell, covering of all the direct opening with asbestos cloth, checking ofvapour concentration etc. shall be carried out by contractor. |
| 5 | Surface preparation of Roof ,shell, structure etc: The scope of work of the contractor includes supply of paint, tools & tackcles ,laburs, all equipments etc. Surface preparation using hand tool cleaning including removal of oil, grease and other contaminants by solventcleaning followed by removal of defective paint, loose mill scale, looserust, loose paint, weld flux, slag from the metallic surfaces, by handchipping, hand brushing, hand scrappers / chisels, steel wools, finalcleaning with High pressure ( 10000 PSI ) low TDS fresh soft water jetcleaning and drying with compressed air as per the specifications anddirections of Site Engineer. Prepared surface shall conform to WJ-4 as per NACE no.5/SSPC SP-12 standards |
| 6 | Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 7 | Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 8 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 microns) |
| 9 | Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all safety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during surface preparation and painting of tank shell. |
| 10 | Surface cleaning to Sa 21/2 Swedish Specification by Grit/shot blasting (extra over St-2 / St-3 cleaning) by using abrasive materials of size range 16 to 30 (~0.6 to 1.2 mm) mesh like copper grit / shot etc as per relevant standard & direction of Engineer -in -Charge on steel surfaces like storage tanks, columns, vessels, exchangers, chimneys, steel structures and other flat surfaces including pipelines of 350 NB and more diameters to S.A. 2-1/2 sweedish specifications in position at all heights including all tools and plants, consumables, labour etc complete in all respect as directed by Engineer-in-charge but excluding cost of scaffolding which shall be paid separately. Air in the scope of contractor (contractor will have to make is own arrangement for compressor etc. for arranging required air for blasting). |
| 11 | HB Polymide cured epoxy primer to achive a minimum DFT of 200 microns (2 or more coats of 100 microns each) |
| 12 | Painting at Beawar |
| 13 | Tank Surface Preparation and Painting works: (refer detailed technical specs): The scope includes surface preparation to defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing all required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per technical specifications and instructions of EIC/ Site Engineer. |
| 14 | Surface preparation of Roof ,shell, structure etc: The scope of work of the contractor includes supply of paint, tools & tackcles ,laburs, all equipments etc. Surface preparation using hand tool cleaning including removal of oil, grease and other contaminants by solventcleaning followed by removal of defective paint, loose mill scale, looserust, loose paint, weld flux, slag from the metallic surfaces, by handchipping, hand brushing, hand scrappers / chisels, steel wools, finalcleaning with High pressure ( 10000 PSI ) low TDS fresh soft water jetcleaning and drying with compressed air as per the specifications anddirections of Site Engineer. Prepared surface shall conform to WJ-4 as per NACE no.5/SSPC SP-12 standards |
| 15 | HB Polymide cured epoxy primer to achive a minimum DFT of 200 microns (2 or more coats of 100 microns each) |
| 16 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 ?). |
| 17 | Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all safety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during surface preparation and painting of tank shell. |
| 18 | Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 19 | Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 20 | Painting at Chaksu |
| 21 | Tank Surface Preparation and Painting works: (refer detailed technical specs): The scope includes surface preparation to defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing all required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per technical specifications and instructions of EIC/ Site Engineer. |
| 22 | Surface preparation of Roof ,shell, structure etc: The scope of work of the contractor includes supply of paint, tools & tackcles ,laburs, all equipments etc. Surface preparation using hand tool cleaning including removal of oil, grease and other contaminants by solventcleaning followed by removal of defective paint, loose mill scale, looserust, loose paint, weld flux, slag from the metallic surfaces, by handchipping, hand brushing, hand scrappers / chisels, steel wools, finalcleaning with High pressure ( 10000 PSI ) low TDS fresh soft water jetcleaning and drying with compressed air as per the specifications anddirections of Site Engineer. Prepared surface shall conform to WJ-4 as per NACE no.5/SSPC SP-12 standards |
| 23 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 microns) |
| 24 | HB Polymide cured epoxy primer to achive a minimum DFT of 200 microns (2 or more coats of 100 microns each) |
| 25 | Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 26 | Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 27 | Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all safety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during surface preparation and painting of tank shell. |
| 28 | Painting at Sanganer |
| 29 | Tank Surface Preparation and Painting works: (refer detailed technical specs): The scope includes surface preparation to defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing all required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per technical specifications and instructions of EIC/ Site Engineer. |
| 30 | Surface preparation of Roof ,shell, structure etc: The scope of work of the contractor includes supply of paint, tools & tackcles ,laburs, all equipments etc. Surface preparation using hand tool cleaning including removal of oil, grease and other contaminants by solventcleaning followed by removal of defective paint, loose mill scale, looserust, loose paint, weld flux, slag from the metallic surfaces, by handchipping, hand brushing, hand scrappers / chisels, steel wools, finalcleaning with High pressure ( 10000 PSI ) low TDS fresh soft water jetcleaning and drying with compressed air as per the specifications anddirections of Site Engineer. Prepared surface shall conform to WJ-4 as per NACE no.5/SSPC SP-12 standards |
| 31 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 microns) |
| 32 | Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all safety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during surface preparation and painting of tank shell. |
| 33 | HB Polymide cured epoxy primer to achive a minimum DFT of 200 microns (2 or more coats of 100 microns each) |
| 34 | Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 35 | Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 36 | Painting at Jaipur |
| 37 | Tank Surface Preparation and Painting works: (refer detailed technical specs): The scope includes surface preparation to defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing all required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per technical specifications and instructions of EIC/ Site Engineer. |
| 38 | Surface preparation of Roof ,shell, structure etc: The scope of work of the contractor includes supply of paint, tools & tackcles ,laburs, all equipments etc. Surface preparation using hand tool cleaning including removal of oil, grease and other contaminants by solventcleaning followed by removal of defective paint, loose mill scale, looserust, loose paint, weld flux, slag from the metallic surfaces, by handchipping, hand brushing, hand scrappers / chisels, steel wools, finalcleaning with High pressure ( 10000 PSI ) low TDS fresh soft water jetcleaning and drying with compressed air as per the specifications anddirections of Site Engineer. Prepared surface shall conform to WJ-4 as per NACE no.5/SSPC SP-12 standards |
| 39 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 microns) |
| 40 | Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all safety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during surface preparation and painting of tank shell. |
| 41 | HB Polymide cured epoxy primer to achive a minimum DFT of 200 microns (2 or more coats of 100 microns each) |
| 42 | Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 43 | Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of EIC/ Site Engineer to complete work in all respects. |
| 44 | Painting at Jodhpur |
| 45 | Surface preparation of piping, equipment and valves etc. by abrasive blast cleaning or with power wire brush (wherever blast cleaning is not possible) confirming to SA 2.5, making the surface free of dust, grease, mill scales etc., application of 1 coat x 50-75 microns DFT of Inorganic Zinc Ethyl Slicate Primer, followed by application of sealer coat of 30 micron DFT and intermediate coat of 150 micron DFT with surface tolerant epoxy mastic paint and 2 coats x 50 micron each DFT of Isocynate Aliphatic Poly Urethene (PU) by airless spray, with approved materials, paints, tools, tackles, consulambles, non-consumables, labour, equipment etc. to complete the job in all respects as per specification and instructions of the Site Engineer / EIC. The total DFT shall be minimum 330 microns. |
| 46 | Cleaning exposed steel surfaces of piping, equipment and valves etc. by abrasive blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials, labour, equipment etc. and completing the job in all respects as per specification and instructions of the Site Engineer / EIC. |
| 47 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas including trimming of sides of the trenches, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including filling in sides of foundation trenches, plinth etc. with the excavated earth available and/or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade , complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. In all kinds of soil Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.