Power Government Departments Closing in 18 days TDR #58394331

Tender For Work Of Electrical Utility Shifting (33 Kv, 11 Kv, Lt Line & T/F) At Lal Bangla -Sanigwan Marg Under Kanpur Kesco..

Issued by Government Departments · Kanpur, Uttar Pradesh
Tender Value
73.24 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
18 days left
EMD
73300
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Work Of Electrical Utility Shifting (33 Kv, 11 Kv, Lt Line & T/F) At Lal Bangla -Sanigwan Marg Under Kanpur Kesco..

BOQ

Name of Work:-
Sl. No. Item Description
1Description of work
2Loading, Carriage and unloading of poles from store to work site or vice-versa.
3Erection of Double pole structure by digging of pit by hydra.
4Erection of TRI pole structure by digging of pit by hydra.
5Erection of FOUR pole structure by digging of pit by hydra.
6Erection of new S.T. Pole/repaired size 9.0 Mtr. To 13.00 Mtr. With the help of crane including of Pit back filling and ramming.
7Grouting of pole with cement brick ballast and coarse sand as per standard specification.
8Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
9Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paint including cost of Ist Class enamel paint.
10Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications.
11Dismentalling of Damaged S.T. Pole of very Critical Position with the help of crane after removing all the accessories from damaged pole and its all related work including digging of pit or by cutting with gas cutter.
12Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
13Fabrication/modification of MS Item as per requirement of site.
14Fixing of MS Channel (100x50x6) mm 2.4 / 2.8/ 0.35 mtr. Long/T-off channel.
15Dismentalling of binding wire from insulators and loosening of the ACSR Dog conductor on each pole then lowering down the ACSR Dog conductor & rolling into bundles.
16Loading, Carriage and unloading of ACSR Dog Conductor from store to work site or vice-versa.
17Laying, Stringing & Tensioning of ACSR Dog Conductor/cover dog and for making jumpers on riser.
18Taking out 33kv and 11 kV 3x70 to 3x300 XLPE Cable/LT Cable except service cable from cable drum before laying and transportation of the cables from store to work site or vice-versa.
19Laying of 33 KV/11 KV 3x300/400/185 sq.mm XLPE Cable in Air Pole to Pole./POLE TO TRANSFORMER/SECTION POLE ABOVE GI PIPE
20Lyaing AND FIXING of G.I. Pipe/MS Pipe/ Old & Used Pole Pcs
21Laying of cable in above G.I. Pipe/Old & Used Pole Pcs
22Making 33KV/11KV Making straight through,O/D,I/D joint by contractor
23Mounting of cable box on pole/ cable support structure / in VCB
24Mounting of 33 kV / 11kV Pin Insulator
25Erection of 33kV /11 kV Disc Fitting with disc Insulator
26Dismantling of M.S. Channel/X-arm/Guarding angle
27Erection of Bracing set
28Chopping of tree branches lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.
29Fixing of danger board on erected poles
30Fixing of G.I. Barbed wire
31Loading, carriage and unloading of Aearial Bunched Cable from store to work site or vice-versa.
32Laying of LT Aerial Bunched Cable including fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Pole etc.
33Dismantling of L.T./H.T. A.B. Cable and rolling into bundles
34Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
35Making of H.T. Jumpers from 3 Phase 3 Wire H.T. O.H. line for erection work.
36Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work.
37Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work.
38Making HT/LT Section points by brackets, clamps & insulator, Tightening of Line, binding of conductor & proper connection.
39Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
40Mounting & Erection of three phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
41Opening and reconnection of consumer service connections after replacement of line/ poles etc.
42Re-arrangement of 33 KV/11KV existing line / Cables
43Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
44Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely.
45Erection of TPMO
46Erection of LT Circuit 500V/500A
47Erection of DO Fuse set
48Making Plinth of Distribution Transformers
49Shifting of Distribution Transformers
50Fabrication & erection of Distribution T/F Fencing
51Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 80 feet long with socket cutter, earth wire 7/14 SWG, Nut & bolts with connection of pipe to distribution T/F Neutral or Body all material shall be provided by contractor with cost of all material.
52Laying of LT XLPE 1x630/1x400 sqmm cable T/F to ACB
53Carriage of all concerning stock material from KESCo Store to site or vice-versa including Cable Drum.
54The following materials will be provided by contractor
55MS Clamp 4½ (50x6 mm)
56MS Clamp 5½ (50x6 mm)
57MS Clamp 6½ (50x6 mm)
58MS Clamp 7½ (50x6 mm)
59MS Clamp 8½ (50x6 mm)
60Bracing clamp 6½
61Bracing clamp 7½
62Bracing clamp 8½
63C.I. Packing 4½
64C.I. Packing 5½
65C.I. Packing 6½
66C.I. Packing 7½
67C.I. Packing 8½
68ALLUMINIUM PAINT
69RED OXIDE PAINT
70X ARM HOLDING CLAMP
71Stay Clamp
72LT POLE CLAMP'
73DISTRIBUTION BOX 1PH CLAMP
74DISTRIBUTION BOX 3PH CLAMP
75EARTHING CLAMP Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58394331
AUTHORITY Government Departments
TENDER VALUE 73.24 Lakhs
LAST DATE 25-11-2026
Authority
Authority Name Kanpur Electricity Supply Co Limited
Work Description Tender for Work Of Electrical Utility Shifting (33 Kv, 11 Kv, Lt Line & T/F) At Lal Bangla -Sanigwan Marg Under Kanpur Kesco..
Basic Detail
Tender No 34/SE(Project)/2026-27
Bidding Type Tender
Location
City Kanpur
State Uttar Pradesh
Key Dates
Publish Date 05 Nov 2026
Submission Date 25 Nov 2026
Open Date 25 Nov 2026
Finance
Tender Value 73.24 Lakhs
Tender Fee 3540
EMD 73300
Exemption Not Available
Document List
85f178be-b78a-4b45-a4d8-dd6a72be1407.html
BOQ_2285417.xls
TENDERDOCUMENT34.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Nov 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
html

85f178be-b78a-4b45-a4d8-dd6a72be1407.html

xls

BOQ_2285417.xls

pdf

TENDERDOCUMENT34.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender