Tender For Construction Of 30000 Litres Reinforced Cement Concrete Oht With 12.00 M Staging Height (M 30 Mix) At Rasampalayam Pattiyanpannai In Poonampalayam Panchayat Under Pgf 2026-27
Tender Value
18.40 Lakhs
Estimated cost
Bid Submission
20 Nov 2026
11 days left
EMD
18400
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tiruchirappalli → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of 30000 Litres Reinforced Cement Concrete Oht With 12.00 M Staging Height (M 30 Mix) At Rasampalayam Pattiyanpannai In Poonampalayam Panchayat Under Pgf 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Name of the Work : CONSTRUCTION OF 30000 LITRES RCC OHT WITH 12.00 M STAGING HEIGHT (M 30 MIX) at Rasampalayam pattiyanpannai in Poonampalayam Panchayat |
| 2 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 3 | Second depth 2.00 m - Below |
| 4 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete. |
| 5 | Cement concrete 1:4:8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. |
| 6 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. PLANE SURFACES Below GL |
| 7 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete. |
| 8 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete . FOOTING |
| 9 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Square column upto G.L. Brace Beam Bottom |
| 10 | RCC in 1:1.5:3GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.For column upto G.L. Brace Beam Bottom |
| 11 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B.For G.L. Brace Beam |
| 12 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. |
| 13 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. |
| 14 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 15 | RCC in 1:1.5:3GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 16 | Refilling the foundation with excavated earth including watering and consolidation etc., complete. |
| 17 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. For column, G.L. brace beam top to First brace beam bottom |
| 18 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 19 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. |
| 20 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 21 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 22 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc.complete.Square Column (3.02 - 3.30) |
| 23 | Square Column (3.30 - 4.30) |
| 24 | Square Column (4.30 - 5.30) |
| 25 | Square Column (5.30 - 5.74) |
| 26 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Square Column (3.02 - 4.50) |
| 27 | Square Column (4.50 - 5.74) |
| 28 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Second Brace beam (5.74 - 6.04) |
| 29 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 30 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. For Second Brace Beam (5.74 - 6.04) |
| 31 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Square Column (6.04 - 6.30) |
| 32 | Square Column (6.30 - 7.30) |
| 33 | Square Column (7.30 - 8.30) |
| 34 | Square Column (8.30 - 8.76) |
| 35 | RCC in 1:1.5:3GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. Column From Second Brace beam Top to Third Brace Beam Bottom (6.04 - 8.76) |
| 36 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.THIRD BRACE BEAM - (8.76-9.06) |
| 37 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 38 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. Third Brace beam (8.76-9.06) |
| 39 | Third Brace beam (9.00 - 9.06) |
| 40 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Square Column (9.06 - 9.30) |
| 41 | Square Column (9.30 - 10.30) |
| 42 | Square Column (10.30 - 11.30) |
| 43 | Square Column (11.30 - 11.31) |
| 44 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Column From Third Brace beam Top to Floor (Grid) Beam Bottom (9.06 - 11.31) |
| 45 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Floor (Grid) BEAM - (11.31-11.61) |
| 46 | Floor Slab |
| 47 | Floor Slab Side (Curved Surface) |
| 48 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 49 | RCC in 1:1.5:3 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 50 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete .Curv. Surface haunch (slanding) (11.85 - 12.00) (4.00 - 0.15) = 3.85) |
| 51 | Curv. Surface Tank Side (12.3-13.30) |
| 52 | Curv. Surface Tank Side (12.30-14.30) |
| 53 | Curv. Surface Tank Side (14.30-14.75) |
| 54 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Water Tank Side Wall (11.85 - 13.50) |
| 55 | Water Tank Side Wall (13.50-14.75) |
| 56 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Cover Slab Bottom (14.75-14.75 |
| 57 | Tank cover slab side wall (curved) (14.75-14.93) |
| 58 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 59 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Water tank cover slab (14.75-14.93) |
| 60 | Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete., |
| 61 | Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete., |
| 62 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete. |
| 63 | Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers. |
| 64 | Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete. |
| 65 | 65mm dia GI pipes for inlet connection |
| 66 | 65mm dia GI pipes for over flow and RWH |
| 67 | 65mm dia GI pipes for delivery pipe. |
| 68 | 50mm dia GI pipes for scour pipe. |
| 69 | 90mm dia PVC Threaded coupler |
| 70 | 63mm dia PVC Threaded coupler |
| 71 | 65mm dia GI Tee |
| 72 | 65mm dia 90 Deg. Bend |
| 73 | 65mm dia GI Bend (Short) |
| 74 | 65mm dia GI Coupler |
| 75 | 65mm dia GI Union |
| 76 | 65mm dia GI Elbow |
| 77 | 50mm dia GI Union |
| 78 | 50mm dia GI Elbow |
| 79 | 65mm dia GI Tee |
| 80 | 65 X 50mm dia GI Reducer |
| 81 | 75 X 63mm dia PVC Reducer |
| 82 | 75 X 90 mm dia PVC Reducer |
| 83 | 65mm dia GM Gate Valve |
| 84 | 50mm dia GM Gate Valve |
| 85 | 75mm PVC Threaded coupler |
| 86 | 63mm PVC pipe |
| 87 | Earth work,laying ,Refiling. 63mm PVC pipe |
| 88 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 89 | Cement concrete 1:4:8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. |
| 90 | Brick work using country bricks of size 83/4\\"x41/4\\"x23/4\\" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 91 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 92 | GST Amount for providing Service to Government Contract Works for the above Construction and Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction and Maintenance Works.) above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysNov 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.