Tender For Comprehensive Conservation Works Of Thekke Kottaram In Padmanabhapuram Palace Complex, Thuckalai, 2026-27
Tender Value
39.07 Lakhs
Estimated cost
Bid Submission
24 Nov 2026
3 days left
EMD
50000
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kanniyakumari → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Comprehensive Conservation Works Of Thekke Kottaram In Padmanabhapuram Palace Complex, Thuckalai, 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. |
| 2 | Hire and labour charges for providing putting up view cutter with green shade net over the scaffolding which already provided. |
| 3 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 4 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead: Of sectional area 40 square centimetres and above. |
| 5 | Removing the traditional wooden battened door shutters with top & bottom sockets without damages to the door frame and re-fixing the same after necessary repairs for easy opening and closing etc. complete as per the direction the Engineer-in-charge. |
| 6 | Hire and labour charges for covering the dismantled roof with tarpaulin / silpaulin tying with coir rope to protect from bad weather and to prevent the damages of roof timber works and to protect the things and valuable materials which kept on the building and dismantling the same when completing the conservation work. |
| 7 | Dismantling wooden Nira partition( vertical trellis )including dismantling and stacking within a distance of 50 m. |
| 8 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class teak wood. |
| 9 | Providing wood works in frames of doors, windows, clerestory windows and other frames, wrought and framed and fixed in position (such as in wooden pillars, Pillasters, on sills of door frame and on shutters etc complete) With second class teak wood for ornamental works. |
| 10 | Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. |
| 11 | Reapering with second class teakwood reaper of size 50 x 25 mm and wire nails 50 mm long including all cost & conveyance and labour charges etc. complete. |
| 12 | Providing valley sheet with 20 gauge aluminium sheet fixing rafter with spike/wire nails and PVC washers with necessary over laps including all cost of materials and labour charges etc. complete. |
| 13 | Protective coating to the wooden roof members two or more times as instructed by the departmental officer at site with CNS (cashew shell oil) mixed with diesel at 1:1 (1 diesel & 1 CNS oil) including all the cost of materials and labour charges etc. complete. |
| 14 | Supplying Pressed clay Palace tiles (Old single pathy) of standard size and approved pattern including cost and conveyance etc. complete. |
| 15 | Providing and laying departmental M.P roof tile in line and level as per the direction of the departmental officer at site. |
| 16 | Supplying Pressed clay tile (Mangalore pattern) Hip & ridge tiles of standard size and approved pattern including cost and conveyance etc. complete. |
| 17 | Providing and fixing departmental clay ridge tile set in cement mortar 1:4 (1 cement :4 coarse sand) including finishing edges with red oxide etc. complete. |
| 18 | Bordering to tiled roof with cement mortar 1:4 (1 cement : 4 coarse sand), finishing edge with red oxide etc. complete. |
| 19 | Providing 2st class teak wood partition wall (Nira) 50 mm thick including cutting grooves as in original as per the direction of departmental officer at site. |
| 20 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 21 | Lime concrete 1:2:4 (1 lime : 2 River sand : 4, 20 mm nominal size broken stone) laid in layers does not exceed 15 cm (if thickness exceeds 15 cm), ramming shall be done by heavy rammers / vibrator until a skin of mortar covers the surface of the laid concrete completely and shall be protected from rain by suitable coverings. After placing the concrete curing shall be done by keeping damp with moist gunny bags, sand or any other method for a period of 7 days. |
| 22 | Lime mortar 1:2 (1 lime : 2 clean sharp river sand) for plastering, is prepared by mechanical grinding, with herbal extracts like palm jaggeri, Kadukka, Kulamavu leaves, Panachatti seeds adhesive and plant steams and leaves of Percea macrantha and vegetable additives etc added to the mixture. Follow the traditional methodology and allow up to 15 days for natural fermentation. Then apply the lime mortar to the prepared surface, 12 mm thick. Finally the surface is troweled smooth after adding organic additives water. Continue this process until the shrinkage and cracks have disappeared. |
| 23 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm. |
| 24 | Flooring with terracotta tiles of size 225x225mm laid on lime mortar 1:2 (1 lime :2 coarse sand) with 4 mm open joints, grouted and pointed with lime mortar 1:2 (1 lime :2 fine sand). |
| 25 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 26 | Finishing with lime putty requires a final, smooth coat of high-calcium (fat) lime paste made by slaking the lime with water for at least 24 hours to achieve a thick workable consistency. Traditional additives like jaggeri water, curd, aloe vera gel etc. can be added to improve workability and water retention. The under coat (back coat) must be thoroughly wetted for 24 hours before applying the finishing coat. The finishing coat should be applied with a wooden float or steel trowel, pressed firmly onto the prepared surface, and polished with steel trowel (ironing) until a smooth, glossy surface is achieved. Maintaining damp the surface for at least 7 days using fine mist spray / moist gunny bags to ensure slow curing. Rapid drying causes cracks. Finishing coat (lime putty) 3 mm thick two or more layers. |
| 27 | White washing with hydrated lime to give an even shade. New work (three or more coats) On new works as per the direction of departmental officer at site. |
| 28 | Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete(50.2.33.6) |
| 29 | Pressure washing thoroughly with water, twice, using compressor and with necessary detergents to clear out all the rubbish and algae growth on the horizontal and vertical surfaces of the monument as per direction of departmental officers at site, including all the charges of compressor, labour and other materials etc. complete. |
| 30 | Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading etc. approved by Engineer-in-charge up to a distance of 15 km. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.