Tender For Widening And Strengthening Work Of Jarakhar-Bangra Road (Odr) In Km 1 To 10
Tender Value
13.63 Crore
Estimated cost
Bid Submission
17 Nov 2026
0 days left
EMD
27.30 Lakhs
Bank guarantee accepted
Document Fee
6250
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hamirpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Widening And Strengthening Work Of Jarakhar-Bangra Road (Odr) In Km 1 To 10
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 4 | Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (By Mix in Place Method) (As per clause 401-4.01B) |
| 5 | Providing laying spreading and compacting of granular stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mix material by Tipper to site, grading with motor grader, spreading of cement using truck mounted / self propelled cement spreader shall have variable working width microprocessor controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/ stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller to achieve desired Unconfined compressive strength and form a layer of Base as per specification. (WMM+4% OPC) |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (As Per Clause 406-4.14) |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion onprepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sum using mechanical means. As per MORT&H Clause 502- 5.01 |
| 8 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sum on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Clause 503 |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 Percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specificationclause No. 507 complete in all respects |
| 10 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. |
| 11 | Construction of sub grade and earthen shoulders with approved materials obtained from boorrow pits with all lifts & leads, transporting to site, spreading, grading to required slop and compacted to meet requirement of table No. 300-2 Patri |
| 12 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 13 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification |
| 14 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 |
| 15 | RCC Grade M30 using batching plant transit mixer & Concrete pump |
| 16 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. |
| 17 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 18 | Providing and laying of boulder apron with stone boulders as per drawing and Technical Specification clause 2503.Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. |
| 19 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 20 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (1000 mm dia Hume Pipe Culvert) |
| 21 | HAZARD MARKER (LEFT & Right)Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing |
| 22 | Brick masonry work in cement motar 1:3 in sub structure complete excluding pointing and plastering as per drawing and technical specifications. |
| 23 | Providing & fixing Km. stone, Hectometre Stone, Painting & Letter's Writing (5th kilometre stone) |
| 24 | Providing & fixing Km. stone, Hectometre Stone, Painting & Letter's Writing (Ordinary kilometer stone) |
| 25 | Providing & fixing Km. stone, Hectometre Stone, Painting & Letter's Writing (Hectometer stone) |
| 26 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%) |
| 27 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) |
| 28 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) |
| 29 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) |
| 30 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayNov 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender