Tender For Work With Supply For Increasing Capacity From100 Kva Transformers To 250 Kva Transformers At Various Places Of 33/11 Kv S/S Gis Kathgodam Under Edsd-Ist, Subhashnagar, Haldwani Under Head Capital(S.I.) For F.Y. 2026-27
Tender Overview
Project Description
Tender for Work With Supply For Increasing Capacity From100 Kva Transformers To 250 Kva Transformers At Various Places Of 33/11 Kv S/S Gis Kathgodam Under Edsd-Ist, Subhashnagar, Haldwani Under Head Capital(S.I.) For F.Y. 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | De-Centralized Material |
| 2 | Holding Clamp for SP-55 with N/B |
| 3 | Nut & Bolts |
| 4 | PG CLAMP 95-25 SQ.mm. |
| 5 | Stay Clamp for SP-55 With Nut & Bolt |
| 6 | SUSPENSION CLAMP WITH EYE HOOK |
| 7 | MS CLAMP FOR DEAD END CLAMP WITH N&B |
| 8 | Mid Span Insulator J.sleeve for LT ABC |
| 9 | STAY INSULATOR |
| 10 | SHEAR HEAD TYPE PRC 120 TO 25 SQ mm |
| 11 | MS Clamp with N&B for Suspension Clamp |
| 12 | HS Type End Caps for LT AB Cable 120mm² |
| 13 | LT XLPE CABLE 1X50 SQ.mm |
| 14 | LT DISTRUBITON BOX 3 PHASE |
| 15 | AL CRIMPING TYPE LUGS 50 SQ.mm |
| 16 | Al. Lug Long Barrel 240 sq. mm. |
| 17 | MS Half Clamp for LT Distribution Box |
| 18 | Labour |
| 19 | CHEMICAL EARTHING |
| 20 | ERECTION OF EARTHING ROD |
| 21 | FABRICATION OF STEEL |
| 22 | EXCAVATION OF PIT FOR STAY SET |
| 23 | ERECTION OF LT STAY SET |
| 24 | GROUTING OF STAY SET |
| 25 | EXCAVATION OF PIT FOR POLE |
| 26 | ERECTION OF SINGLE SP-21 POLE |
| 27 | ERECTION OF SP-55 DOUBLE POLE |
| 28 | GROUTING OF POLE |
| 29 | MUFFING OF POLE |
| 30 | DISMANTLING OF 100 KVA DTR |
| 31 | INSTALLATION OF LT PRMC |
| 32 | INST. OF 250 KVA DTR ON POLE STRUCTURE |
| 33 | FIXING OF FUSE SET |
| 34 | FIXING OF LIGHTNING ARRESTOR |
| 35 | CARTAGE SP-21/23 POLE, 0-20 KM |
| 36 | CARTAGE SP-55 POLE, 0-20 KM |
| 37 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 38 | CARTAGE OF 100 KVA DTR, 0-20 KM |
| 39 | CARTAGE OF 250 KVA DTR, 0-20 KM |
| 40 | DISCONNECTION & RECONNECTION OF CONsumer |
| 41 | STRAIGHTNING OF TILTED EXISTING LT POLE |
| 42 | SERVICE OF HYDRA MACHINE |
| 43 | TIGHTENING OF STAY SET |
| 44 | DIGGING OF PIT THROUGH HAMMER AT CC, DAM |
| 45 | LAYING & FIXING LT XLPE CABLE |
| 46 | INSTALLATION OF LT DISTRIBUTION BOX |
| 47 | FIXING OF PIERCING CONNECTOR 120-35 SQMM |
| 48 | FIXING OF PG CLAMP 95-95 SQMM |
| 49 | DISMANTELLING & RE-FIXING OF TPMO |
| 50 | LOOPING AND CHOPPING OF TREE BRANCHES Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender