Tender For Providing The View Cutter Above Existing Compound Wall At Eastern Boundary Of Kkm Gate At Igcar, Kalpakkam.

Issued by Government Departments · Chengalpattu, Tamil Nadu
Tender Value
57.79 Lakhs
Estimated cost
Bid Submission
18 Nov 2026
1 days left
EMD
1.15 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chengalpattu → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Providing The View Cutter Above Existing Compound Wall At Eastern Boundary Of Kkm Gate At Igcar, Kalpakkam.

BOQ

Name of Work:- Providing the view cutter above existing compound wall at eastern boundary of KKM gate at IGCAR, Kalpakkam.
Sl. No. Item Description
1Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, sag rod, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / synthetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: Lifting device arrangements if any required also arranged by the contractor at his own cost.
2Providing and applying at all levels Two coats of Polyuerthane paint on steel surface and other required internal surface at all levels with Apcothane CF 675 PU 240 Nickel Grey paint of ‘Asian’ or approved equivalent brand, colour and manufacturer, to give an even shade including one under coat of suitable Epoxy/PU primer, preparation of the surfaces complete all as per specification and as directed by the Engineer-in-Charge
3Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge.
4Providing and fixing 4mm thick natural anodised aluminium perforated sheet, having 5 mm dia circular holes at 8 mm c/c staggered pitch, with minimum 10 micron anodised coating suitable for external/coastal exposure, including approved SS screws/bolts, nuts, washers, cutting, drilling, alignment, fixing and all necessary accessories, complete as per drawings, manufacturers recommendations and as directed by the Engineer-in-Charge.
5Earthwork excavation by mechanical means (Hydraulic excavator) for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge.
6All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres.
7Providing and laying plain cement concrete 1:4:8 using 20mm maximum size graded aggregates and crushed stone sand including mechanical mixing, transporting and placing in required position, ramming, compaction, levelling, curing, shuttering, dewatering if any, complete all as per specification for levelling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications.
8Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine crushed graded stone aggregates and crushed stone sand including weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, curing and finishing smooth of all exposed faces complete for column footings, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all insitu item. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Chemical admixture conforming to IS 9103 shall be mixed in fresh concrete and prior permission from Engineer-in-charge shall be obtained for dosage and compatibility 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F.
9M30 grade with 370 kg. of cement per cu.m. of concrete upto plinth level
10Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement at all levels TMT bars of Fe500D grade steel conforming to IS:1786 SAIL or VIZAG or approved equivalent make and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks in cement mortar 1:2 and binding wire complete all as per specification and as directed by the Engineer-in-charge at all lifts. Note: The rate shall be including the cost of reinforcement steel. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see point 7 of Section VIII, General Information for Guidance of Tenderers.
11Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. The measurement for the formwork will be the actual area of forms in contact with concrete surfaces. Shuttering with plywood panels alone will be permitted.
12Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering for curved surface to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. The measurement for the formwork will be the actual area of forms in contact with concrete surfaces. Shuttering with plywood panels alone will be permitted.
13Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building.
14Supplying and filling the selected earth from outside of DAE installation (with all lead and lift), including excavation from borrow pits if any required, filling in layer of not more than 150mm thick, each layer well rammed and consolidated by mechanical roller including water consolidation etc., levelling, dressing the top surface to the required level, complying with standard specification and as directed by the Engineer-in-charge. Note: Proper Trip sheet records shall be maintained for bringing the earth through DAE main gate with security stamp duly signed by Departmental Engineer. Overall rebate (Optional) INR Zero Only Please Enable Macros to View BoQ information Government of India Department of Atomic Energy Indira Gandhi Centre for Atomic Research CIVIL ENGINEERING GROUP Name of work : Providing the view cutter above existing compound wall at eastern boundary of KKM gate at IGCAR, Kalpakkam. Tender No. : CEG/IGC/2245/2026 INDEX Section Title Page No. VIII Instructions to contractors 2 - 4 Schedule of Quantities 1 - 5 Section VIII I. GENERAL INFORMATION FOR GUIDANCE OF TENDERERS
15The schedule of quantities is to be read for the purpose of pricing in conjunction with the special conditions, general rules for the guidance of contractors, conditions of contract, specifications, drawings, schedule of supply of materials and the appendices.
16The prices inserted in the schedule of quantities shall be inclusive of value of the work described including all cost and expenses, which may be required in and for the construction of the work described together with the general risks, liabilities and obligations not forth or implied in the documents on which the tender is to be based.
17The quantities stated are to be considered approximate only and the unit prices entered in the schedule of quantities and prices shall apply only to the actual quantities measured in the completed work in accordance with the specifications.
18All the materials other than those shown in schedule of supply of materials in section VII are to be arranged by the contractor and his rates should account for the same.
19Rates quoted for all items in this tender shall include cost of all materials including cement and steel. Department will not supply any materials other than materials stipulated in Section VII of the tender and as such the rates quoted must be all inclusive.
20The contractor shall be responsible for supply of cement and procure OPC cement conforming to IS 269 (Latest edition) and use it on works. Since the supply of cement by the department has been dispensed all the clauses relevant to supply of cement by department in this tender document stands cancelled. The contractor shall purchase cement from the approved manufacturers only. Secured advances on cement up to 75% of purchase price shall be paid to the contractor after indemnifying the Government and through insurance cover. The quantity of cement on which secured advance shall be paid will be restricted to the consignment of cement tested and passed in the test in department laboratory. The secured advance on cement shall be regulated as per Clause 10B of conditions of contract. Prior approval to be obtained from the Engineer for the quantities proposed to be purchased.
21Regarding supply of STEEL the contractor shall procure only TMT barsof Fe – 500D Grade conforming to IS – 1786 (Latest edition) from main producers as approved by the Ministry of Steel like M/s SAIL, M/s ISPHAT Nigam Limited, M/s VIZAG Steel & M/s TISCON with a test certificate, and use it on works after getting approval from department Engineer or tested in department laboratory. In case of non-availability from aforesaid manufacturers, reinforcing steel of other makes manufactured from ingots alone will be permitted with the prior approval of Engineer-in-charge. Sample shall be tested for all the required parameter as specified in the BIS before bulk purchase.
22Contractor shall make his own arrangements for construction water supply to carryout this work.
23Compensation for escalation in the prices of materials and labour when due is permissible as per provisions in Clause 10CC of conditions of contract.
24If contractors need any clarification they are required to contact the Chief Engineer, Civil Engineering Group, Indira Gandhi Centre for Atomic Research, Central Design Office, Kalpakkam 603 102, Kancheepuram District, Tamilnadu. (Telephone STD Code: 044 – 27480306) II. CONDITIONS FOR CEMENT :
25The contractor shall procure OPC cement conforming to IS 269 (Latest edition), as required in the work, from reputed manufacturers of cement, such as M/s. Ultratech Cements, M/s. Zuari Cements, M/s. Coromandel, M/s. Penna, M/s. Priya Cements, M/s. Chettinadu Cement,M/s. Dalmia cementsand holding license to use ISI certification mark for their product whose name shall be got approved from Engineer-in-charge. Supply of cement shall be taken in 50 Kg. bags bearing manufacturer’s name and ISI marking, samples of cement arranged by the contractor shall be taken by the Engineer-in-charge and got tested in accordance with provisions of relevant BIS codes. In case test results indicate that the cement arranged by contractor does not conform to the relevant BIS codes, the same shall stand rejected and shall be removed from the site by the contractor at his own cost within a week’s time of written order from the Engineer-in-charge to do so.
26The cement shall be brought at site in bulk supply of approximately 50 tonnes or as decided by the Engineer-in-charge.
27The cement Godown of having a capacity to store minimum of 2000 bags of cement shall be constructed by the contractor at site of work for which no extra payment shall be made from department. Double lock provision shall be made to the door of the cement godown. The keys of one lock shall remain with the Engineer in charge or his authorised representative and the key of the other lock shall remain with the contractor. The contractor shall be responsible for the watch and ward the safety of the cement godown. The contractor shall facilitate the inspection of the cement godown by the Engineer-in-charge at any time.
28The contractor shall supply free of charge the cement required for testing. The cost of tests shall be borne by the contractor.
29The actual issue and consumption of cement on work shall be regulated and proper accounts maintained as provided in Clause 10 of the contract. The theoretical consumption of cement shall be worked out as per procedure prescribed in Clause 42 of the contract and shall be governed by conditions laid therein.
30Cement brought to site and cement remaining unused after completion of work shall not be removed from site without written permission of the Engineer-in-charge. III. CONDITIONS FOR STEEL:
31The contractor shall procure steel reinforcement bars conforming to relevant BIS codes from M/s SAIL, M/s RINL, M/s. TATA Iron & Steel Co., M/s. IISCO and M/s. JSW Neo Steel with a test certificate, and use it on works after getting approval from department Engineer or tested in department laboratory. In case of non-availability from aforesaid manufacturers, reinforcing steel of other makes manufactured from ingots alone will be permitted with the prior approval of Engineer-in-charge. Sample shall be tested for all the required parameter as specified in the BIS before bulk purchase. The contractor shall have to obtain and furnish test certificates to the Engineer-in-charge in respect of all supplies of steel brought by him to the site of work. Samples shall also be taken and got tested by the Engineer-in-charge as per the provisions in this regard in relevant BIS codes. In case the test results indicate that the steel arranged by the contractor does not conform to BIS codes, the same shall stand rejected and shall be removed from the site of work by the contractor at his cost within a week’s time from written orders from the Engineer-in-charge to do so.
32The steel reinforcement shall be brought to the site in bulk supply of 10 tonnes or more or as decided by the Engineer-in-charge.
33The steel reinforcement shall be stored by the contractor at site of work in such a way as to prevent distortion and corrosion and nothing extra shall be paid on this account. Bars of different sizes and lengths shall be stored separately to facilitate easy counting and checking.
34For checking nominal mass, tensile strength, bend test, re-bend test, etc. specimen of sufficient length shall be cut from each size of the bar at random at frequency not less than that specified below: Size of bar For consignment below100 tonnes For consignment over100 tonnes Under 10mm dia One sample for each 25 tonnes or part thereof One sample for each 40 tonnes or part thereof 10mm to 16mm dia One sample for each 35 tonnes or part thereof One sample for each 45 tonnes or part thereof Over 16 mm dia. One sample for each 45 tonnes or part thereof One sample for each 50 tonnes or part thereof
35The contractor shall supply free of charge the steel required for testing. The cost of tests shall be borne by the contractor.
36In case the Reinforcement steel is issued by the Department, the actual issue and consumption of steel on work shall be regulated and proper accounts maintained as provided in Clause 10 of the contract. The theoretical consumption of steel shall be worked out as per procedure prescribed in Clause 42 of the contract and shall be governed by conditions laid therein. For the purpose of payment, weight will be calculated on the basis of bar bending schedule and weights of bar given as under. Wherever actual lengths placed differ from bar bending schedule actual length will only be measured. Bar dia (mm) Weight (Kg./Metre) Bar dia (mm) Weight (Kg./Metre) 5.0 0.154 20.0 2.47 6.0 0.222 22.0 2.98 8.0 0.395 25.0 3.85 10.0 0.617 28.0 4.83 12.0 0.888 32.0 6.31 16.0 1.58 36.0 7.99 18.0 2.0 However the payment for 6mm and 8mm dia (nominal size) MS rods will be based on the weight as arrived at by the procedure as specified below. For the purpose of arriving at an average weight per unit length of any individual size of the bar, a set of bars of the same size selected at random from each consignment shall be weighed, their lengths accurately measured and average weight per unit, length found out. Unit weights thus found out, for each size and each consignment, shall be approved by the Engineer. Bars measured as used in works shall be converted into weight by adopting unit weights referred to above.
37Steel brought to site and steel remaining unused shall not be removed from site without the written permission of the Engineer-in-charge. -----
38 Government of IndiaDepartment of Atomic EnergyIndira Gandhi Centre for Atomic ResearchCivil Engineering Group TENDER DOCUMENT FOR Cleaning of Storm water drains and roads in Southern side of IGCAR Premises during the year 2024-2025 at Kalpakkam. Tender No. CEG/IGC/1937/2023 Part – II : Financial Bid (Section - VIII) INDEX Sl. No. Title Page No.
39 Schedule of Quantities 1 - 2

AI Tender Summary

OUR REF NO 58385542
AUTHORITY Government Departments
TENDER VALUE 57.79 Lakhs
LAST DATE 18-11-2026
Authority
Authority Name Indira Gandhi Centre For Atomic Research
Work Description Tender for Providing The View Cutter Above Existing Compound Wall At Eastern Boundary Of Kkm Gate At Igcar, Kalpakkam.
Basic Detail
Tender No CEG/IGC/2245/2026
Bidding Type Tender
Location
City Chengalpattu
State Tamil Nadu
Key Dates
Publish Date 05 Nov 2026
Submission Date 18 Nov 2026
Open Date 19 Nov 2026
Finance
Tender Value 57.79 Lakhs
Tender Fee Ref. Documents
EMD 1.15 Lakhs
Exemption Not Available
Document List
2245FormsACDFGHforfilling_1.xls
2245technicalbid.pdf
2245Undertakingsandformoftender.pdf
BOQ_980359.xls
c6481628-0bed-4bb7-958d-b5128d9e0a58.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Nov 19, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
xls

2245FormsACDFGHforfilling_1.xls

pdf

2245technicalbid.pdf

pdf

2245Undertakingsandformoftender.pdf

xls

BOQ_980359.xls

html

c6481628-0bed-4bb7-958d-b5128d9e0a58.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender