Coal and Mines Boards / Undertakings / PSU Closing in 12 days TDR #58384638

Tender For Operation And Maintenance Of Sprinkler System Wharf Wall And Approach Road For New Dispatch Office At Bina Project

Issued by Boards / Undertakings / PSU · Sonbhadra, Uttar Pradesh
Tender Value
63.91 Lakhs
Estimated cost
Bid Submission
21 Nov 2026
12 days left
EMD
80000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Operation And Maintenance Of Sprinkler System Wharf Wall And Approach Road For New Dispatch Office At Bina Project

BOQ

Name of Work:- Operation and maintenance of Sprinkler system wharf wall and approach road for new Dispatch office at Bina Project
Sl. No. Item Description
1Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 150 mm dia nominal bore
2Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 80 mm dia nominal bore
3Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 50 mm dia nominal bore
4Providing and fixing mist spray sprinkler with throw of 27 meter and 211 LPM discharge along with specifications : (A) nature of material of sprinkler body aluminium alloy and end connection- Brass (B) inlet size - 1.50 inches & Nozzle sizes - 12 mm x 5 mm (C) radius of throw 27 m (D) Discharge- 211 LPM (E) Operating pressure - 4 kg/ sq cm
5Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) :150 mm diameter Class I
6Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) :100 mm diameter Class I
7Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore
8Operation of pump system and regulating necessary controlling valves provided in the pipelines, sprinkling system including routine maintainance and repairing of pipelines, valves of all sizes by deploying necessary man powers as required including T& P etc. all complete as per instructions of EIC. Manpowers: Fitter-one nos. per day, valveman- 3 nos. per day, Guard- one no. per day (Night shift)
9Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
10Bolts and nuts 16 mm dia 60 mm long
11Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
12Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification
13Construction of dry lean cement concrete Sub- base over a prepared subgrade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. Deduct from Item No.6.1 above if paver with electronic sensor, vibratory roller are not used and laying, compaction is done by any other method. (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work.) .
14Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-30 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. Deduct from Item No.6.3 & 6.4 above if paver with electronic sensor is not used and laying, compaction is done by any other method (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid
15Add extra in Item No.6.3, 6.4, 6.6 & 6.10 above for the cost of steel in dowel bar and and tie rod including craddle laps etc. complete required as per design: Mild steel
16Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
17Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
18Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58384638
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 63.91 Lakhs
LAST DATE 21-11-2026
Authority
Authority Name Northern Coalfields Limited
Work Description Tender for Operation And Maintenance Of Sprinkler System Wharf Wall And Approach Road For New Dispatch Office At Bina Project
Basic Detail
Tender No B/Civil/2026-27/ETN-11 dtd 04.11.2026
Bidding Type Tender
Location
City Sonbhadra
State Uttar Pradesh
Key Dates
Publish Date 04 Nov 2026
Submission Date 21 Nov 2026
Open Date 23 Nov 2026
Finance
Tender Value 63.91 Lakhs
Tender Fee Ref. Documents
EMD 80000
Exemption Not Available
Document List
56312ffe-cf5c-45d6-88c9-8b3b89c2e9d2.html
BOQ_381132.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Nov 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
html

56312ffe-cf5c-45d6-88c9-8b3b89c2e9d2.html

xls

BOQ_381132.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender