Tender For Preventive Maintenance Of 132 Kv Gis System And Allied Works At Mrs At Naval Dockyard, Visakhapatnam Under Ge (I) Dm Visakhapatnam.
Tender Overview
Project Description
Tender for Preventive Maintenance Of 132 Kv Gis System And Allied Works At Mrs At Naval Dockyard, Visakhapatnam Under Ge (I) Dm Visakhapatnam.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Nov-2026 | Corrigendum 01 | BOQ | 25-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | M&L for carrying out M2 level preventive maintenance of 132KV GIS system including inspection , Servicing, testing and submission of detailed service and test reports for all bay/ compartments by OEM i.e service Engineer of GE T&D India Ltd (Formerly Areva) complete all as specified and directed :-(a) SF6 Gas test & checks : Dew point measurement SF6 purity check {% measurement} Alarm check for density switches optional Gas leak test. (b) Circuit Breaker mechanical test :- Visual inspection of spring operated mechanism mannually on/off spring-operated mechanism optical indicator( spring on/off) position check.(c) Electrical test :- Breaker timing test, Auxiliary contact change over position, check spring charge motor current measureas & time measurement, heater current measurement. |
| 2 | (d) Disconnector/Earthing switches mechanical test :- Mannually on/off with hand crank optical position indication check for change over, insulated earth switch external earthing link installation & tightness check.(e) Contact resistance check :- Test as per circuit proposed during commissioning.(f) Current & voltage transformer/Local control cubicle :- Terminal tightness check and wquipment operational and alram test.(g) Interlock & scheme verification : Complete checking of elect and Mech intrlocks for safe operation of GIS eqpt.(h) Auxiliary systems check : Checking of heaters, space haters, lighting, AC/DC supply, MCBs, fuses and healthiness of control panels(j) Tightness & Housekeeping :- Checking of all accessible fasteners, termial connections , earhing connections and general cleaning of panels and GIS area |
| 3 | Note :- All maint activities shall be carried out as per OEM recommendations and relevant/ IS/IEC standards under proper shutdown conditions following safety procedure. Detailed service and test repors along with observations and recommendations shall be submitted after completion of work. |
| 4 | Supply of following consumable kit for M2 maint :-(a) Isopropyl alcohol - 20 ltr(b) Lint free tissue paper for cleaning - 10 Roll(c) Locatitie 8103 Lubricant - 20 Kg(d) Fomblin grease UT18 - 100 Gm(e) Molykote 111 grease with grease gun(f) SF6 leak detector foam spray bottles(g) Breaker Mech door beadings. |
| 5 | M&L for copper strip 32 x 6mm with saddle and fixing screws, including insulating block for connection of pit to bldg test point complete all as specified and directed. |
| 6 | M&L for copper strip 75 x 10mm with saddle and fixing screws, including insulating block for connection of pit to bldg test point complete all as specified and directed by Eng-in-charge. |
| 7 | M & L for casting Chemical earth pits with Pipe in Pipe technology 50 mm Cu bonded , 200 microns, 3 Mtr Long Earth Electrode targeted/ achieving individual earthpit result from 1.5 ohms upto maximum of 5.0 ohms for each individual pit and by maintaining of expected Grid value of 0.20 ohms but less than 0.5 ohm for grid earth pits as in around individual technical building with the following items, specifications and testing complete for each pit complete all as specified and directed.(i) Boring 300 mm dia of earth pit in soft and loose soil upto the depth of not less than 2.5 m deep below ground level by means of any method i.e boring/ digging including removal of excavated material to a distance of 50 m as directed by Engr-in-charge in each pit.(ii) Filling the each bore hole with 10 kg thick compacted layer of earth enhancing compound to reduce the soil resistivity as per Clause 14.5d of IEEE 80:2000 (latest Edition) of make Terec+ as per manufacturers specifications. |
| 8 | (iii) Placing of 3 m length of 50mm dia of copper bonded pipe-in-pipe earth electrode with welded copper plate 38mmx200mm of 12mm thick on top. The earth rod should be placed at centre of each bore hole/earth pit with minimum of 10 kg inserted in to Terec+ layer(iv) Back filling with earth enhancing compound up to earth pit GL to reduce the soil resistivity as per clause 14.5b of IEEE 80:2000 (latest Edition) of make Earthcon upto the ground.(v) Connecting/Jointing/brace welding each electrode of earth pit serially with copper earthing strip 25X3 mm with minimum 3 m distance between two earth pits buried below GL in trench filled with earth enhancing compound to reduce the soil resistivity as per Clause 14.5b of IEEE 80:2000 (latest edition) by enhancing its ionic properties, dispersion properties, hygroscopic properties, expansion properties, diffusion properties etc, incl earth excavation complete all as directed by Eng-in-charge. Please Enable Macros to View BoQ information |
| 9 | (iii) Placing of 3 m length of 50mm dia of copper bonded pipe-in-pipe earth electrode with welded copper plate 38mmx200mm of 12mm thick on top. The earth rod should be placed at centre of each bore hole/earth pit with minimum of 10 kg inserted in to Terec+ layer(iv) Back filling with earth enhancing compound up to earth pit GL to reduce the soil resistivity as per clause 14.5b of IEEE 80:2000 (latest Edition) of make Earthcon upto the ground.(v) Connecting/Jointing/brace welding each electrode of earth pit serially with copper earthing strip 25X3 mm with minimum 3 m distance between two earth pits buried below GL in trench filled with earth enhancing compound to reduce the soil resistivity as per Clause 14.5b of IEEE 80:2000 (latest edition) by enhancing its ionic properties, dispersion properties, hygroscopic properties, expansion properties, diffusion properties etc, incl earth excavation complete all as directed by Eng-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender