Power Boards / Undertakings / PSU Closing in 20 days TDR #58381244

Tender For Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning Etc. For Construction Of 9 Nos. 132/220 Kv Transmission Lines (Approx. 179.28 Route Km) Under Package-1 (Transmission Central, Lucknow) O

Issued by Boards / Undertakings / PSU · Lucknow, Uttar Pradesh
Tender Value
143.57 Crore
Estimated cost
Bid Submission
27 Nov 2026
20 days left
EMD
1.43 Crore
Bank guarantee accepted
Document Fee
17700
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning Etc. For Construction Of 9 Nos. 132/220 Kv Transmission Lines (Approx. 179.28 Route Km) Under Package-1 (Transmission Central, Lucknow) Of Upptcl, On Turn-Key Basis

BOQ

Name of Work:- Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning etc. for Construction of 9 Nos. 132/220 kV transmission lines (approx. 179.28 route km) under Package-1 (Transmission Central, Lucknow) of UPPTCL, on Turn-key basis
Sl. No. Item Description
1Schedule-3 Summary Tender Inviting Authority: Superintending Engineer, Electricity Transmission Design Circle, 10th Floor, Shakti Bhawan Extension, 14-Ashok Marg, Lucknow-226001 Name of Work: Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning etc. for Construction of 9 Nos. 132/220 kV transmission lines (approx. 179.28 route km) under Package-1 (Transmission Central, Lucknow) of UPPTCL, on Turn-key basis Tender No: TD-567/26 (Package-1) Bidder Name & Address : SCHEDULE OF QUANTITIES AND PRICES (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name, Address and Values only)
2Total Price for Supply [Schedule S-1]
3Total Price for Work [Schedule S-2]
4Total Price [S-1 + S-2]
5GST @18% [18% of 3]
6Total Bid Price including GST [3+4] Signature Bidder Name: Designation : Name & Address of Company Date: SCHEDULE S-1 : (SUPPLY OF MATERIAL) Tender Specification No.: TD-567/26 (Package-1 : Transmission Central, Lucknow) Name of Firm: S N Item Unit QTY Ex-Work per unit rate (Rs.) Freight (Rs.) P&F (Rs.) INS (Rs.) Unit FOR Destination rate (Rs.) Total Amt (Exclusive of GST) (Rs.)
7TOWERS (a) Fabrication, galvanizing, Inspection and supply of DC towers including stubs, extension and stub-setting templates, gantry structures as per drawings & BOM (i) Mild steel MT 3397.947 0.0 0.0 (ii) High Tensile Steel MT 97.72 0.0 0.0 (b) Hot dip galvanized, Hexagon round hexagon head transmission tower Bolts Nuts and washers for above structures as per BOM MT 145.78 0.0 0.0
8TOWER ACCESSORIES (a) Number Plate Nos. 596.0 0.0 0.0 (b) Danger Plate Nos. 596.0 0.0 0.0 (c) Phase Plate in sets of red, blue and yellow for Tension towers Nos. 673.0 0.0 0.0 (d) Bird Guard for towers Nos. 1732.0 0.0 0.0 (e) Pipe type earthing material for towers Nos. 986.0 0.0 0.0 (f) Circuit plate (Set of two) SET 328.0 0.0 0.0 (g) Anticlimbing device Nos. 415.0 0.0 0.0
9PORCELAIN DISC INSULATORS (a) 70 KN Nos. 4722.0 0.0 0.0 (b) 120 KN Nos. 14459.0 0.0 0.0
10POLYMER INSULATORS / COMPOSITE SILICON RUBBER INSULATOR STRING (a) 70 KN suitable for 132 KV suspension fitting per string 867.0 0.0 0.0 (b) 120 KN suitable for 132 KV tension fitting per string 2739.0 0.0 0.0
11HARDWARES SUITABLE FOR ACSR PANTHER (a) Single suspension fittings Nos. 1317.0 0.0 0.0 (b) Single Tension fittings Nos. 3057.0 0.0 0.0 (c) Double suspension fittings Nos. 24.0 0.0 0.0 (d) Double Tension fittings Nos. 398.0 0.0 0.0
12HARDWARES SUITABLE FOR EARTHWIRE 7/3.25 mm (a) Suspension clamps seated type Nos. 10.0 0.0 0.0 (b) Tension Clamps Nos. 30.0 0.0 0.0 (c) Mid Span compression Joint Nos. 10.0 0.0 0.0 (d) Vibration Dampers Nos. 10.0 0.0 0.0 (e) Copper Bond Nos. 30.0 0.0 0.0
13CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER (a) Vibration Dampers Nos. 8918.0 0.0 0.0 (b) Mid Span compression Joint Nos. 794.0 0.0 0.0 (c) Repair sleeves Nos. 689.0 0.0 0.0 (d) Preformed Armour Rod Nos. 1103.0 0.0 0.0
14OPGW (96 FIBRE) (a) 96 Fibre (DWSM) OPGW Fibre Optic Cable route km 24.0 0.0 0.0 (b) Supply & Installation of Hardware set for 96 Fibre (DWSM) OPGW* route km 24.0 0.0 0.0 (c) Joint box (96 Fibre) Nos. 10.0 0.0 0.0 (d) FODP (192 F) Nos. 1.0 0.0 0.0 (e) Fibre Optic Approach Cable for 96 F OPGW route km 1.0 0.0 0.0 (f) Supply & Installation of hardware set for 96 Fibre (DWSM, G.652D) Fibre Optic Approach Cable* route km 1.0 0.0 0.0
15OPGW (48 FIBRE) (a) 48 Fibre (DWSM) OPGW Fibre Optic Cable route km 148.444 0.0 0.0 (b) Supply & Installation of Hardware set for 48 Fibre (DWSM) OPGW* route km 148.444 0.0 0.0 (c) Joint box (48 Fibre) Nos. 75.0 0.0 0.0 (d) FODP (96 F) Nos. 16.0 0.0 0.0 (e) Fibre Optic Approach Cable for 48 F OPGW route km 10.5 0.0 0.0 (f) Supply & Installation of hardware set for 48 Fibre (DWSM, G.652D) Fibre Optic Approach Cable* route km 10.5 0.0 0.0 Total 0.0 GST @18% 0.0 Total with GST 0.0 NOTE: * One set of installation hardware set shall contain all installation hardware fittings & accessories as may be required for 1 km of OPGW/Fibre Optic Approach Cable. * Tenderer must quote their rates for Ex-Works, Packing and Forwarding, Freight and Insurance Charges separately in Indian Rupees and upto 02 decimal places only as per Columns of above Price Schedule. * GST shall be paid extra (applicable at the time of supply/work) on total of Ex-Works, Packing and Forwarding, Transportation and Insurance Charges. Present rate of GST on work contract is 18%. Signature Date: Bidder Name: Designation : Name & Address of Company SCHEDULE S-2 : (ERECTION WORK) Tender Specification No.: TD-567/26 ( Package-1 : Transmission Central, Lucknow) Name of Firm: S N Description Unit QTY Unit Rate (Rs.) Amount Exclusive of GST (Rs.)
16Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey)
17Check survey
18Soil testing
19Cost of excavation of 132 KV tower foundation pits including all earth work,backfilling, levelling etc.
20Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers : (a) 132 KV DA Nos. 174.0 0.0 (b) 132 KV DB Nos. 135.0 0.0 (c) 132 KV DC/DE Nos. 209.0 0.0 (d) 132/220 KV Multicircuit tower Nos. 4.0 0.0
21Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars (a) 1:2:4 concreting Cu.m. 17722.424000000003 0.0
22Erection of Superstructure of 132KV/220KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 132/220KV SC/DC/MC lines
23Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers.
24Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Three phases of 132 KV SC lines
25Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on single phase if existing 132 KV TSS SC line
26Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all phases of 132 KV MC lines
27Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 132 KV DC lines
28Laying, stringing, tensioning, clamping, jointing,including fittings of all necessary Hardware and accessories of OPGW & OFAC,installation of FODP, termaination at S/s, end to end connectivity & testing etc on 132KV & 220 KV lines
29Laying, stringing, tensioning, clamping, jointing of Earthwire ,including fittings of all necessary Hardware and accessories
30Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
31Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc.
32Dismantiling of old existing earthwire/OPGW with all accessories including re-rolling of dismantled Earthwire/OPGW on empty drums for reuse and shifting of all material from site to store.
33Dismantling of old existing 132/220kV Tower with all accessories including stacking of tower parts and shifting of all material from site to store.
34Dismantling of earliers foundation which includes excavation , breaking of foundations upto 2 meter depth and removing of stubs and steel reinforcement, backfilling, levelling and making field suitable for agriculture
35Dismantling of old existing All 3 Phases of ACSR PantherConductor with all accessories including re-rolling of dismantled conductor on empty drums for reuse and shifting of all material from site to store.
36Cutting of following sizes various types of trees like (All type trees) range of corridore of the said 132kv line to provide the maximum clearance of about 13.5 mtr (all clearance 27 mtr) between the tree and conductor on both side of towers/line,with all due care of safty and precautions to avoid any damage to nearby buildings, power and telephone lines poassing nearby,crops other nearby trees etc.The work also includes removing eliminating & cleaning the line sites after cutting of the trees. (a) Tree cutting of up to 1 mtr girth of tree coming in line corridor Nos 3500.0 0.0 (b) Lopping & Chopping of branches of different types of trees like Mango ,Neem, Sheesham, Peepal, Semal, Eucalyptus,Bamboo koty,Popular etc. Falling in the range of corridore of the said 132KV line to provide the minimum clearance of about 8 mtr between the trees & conductors on both side of the towers/ line with all due care of safety & precautions to avoid any damage to nearby buildings power and telephone lines passing nearby crops other nearby trees etc. The work also includes removing eliminating & cleaning the line sites after looping & chopping of the trees. Nos 5000.0 0.0
37Execution of ERS work for LILO work & Height raisiing work of existing 132kV Hardoi-Kaurha TSS circuit. The work details are as follows:- (a) ERS material transportation from any UPPTCL substation as per availability of ERS towers to work location of 132KV TSS lines under ETD Hardoi under transit insurance and returning back to UPPTCL substation from where it was taken under transit insurance as receieved originally. Nos 11.0 0.0 (b) ERS tower erection complete in all respect with anchoring arrangement and safely dismantling of ERS material at site of 132kV TSS lines Nos 11.0 0.0 (c) (i)Destringing of conductor of existing 132kV hardoi-Kaurha TSS line at Tower Loc no 15,16 &17.(ii)Stringing of conductor of 132Kv Hardoi-Kaurha TSS line after erection of ERS tower and jumpering at both the end and associated work.(iii)Destringing of conductor of ERS line and safe removal of ERS towers after restoiration of main line and properly rolling of conductor in drums and safely shifting of conductor in the store. Km 2.0 0.0 (d) Dismantling work of 1No of C type and 2Nos of B type tower part by part & shifting to store of UPPTCL MT 16.5 0.0 Total 0.0 Signature Date: Bidder Name: Designation : Name & Address of Company Schedule-3 Summary Tender Inviting Authority: Superintending Engineer, Electricity Transmission Design Circle, 10th Floor, Shakti Bhawan Extension, 14-Ashok Marg, Lucknow-226001 Name of Work: Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning etc. for Construction of 8 Nos. 132/220 kV transmission lines (approx. 102.28 route km) under Package-2 (Transmission North East, Gorakhpur & Transmission South East, Prayagraj) of UPPTCL, on Turn-key basis Tender No: TD-567/26 (Package-2) Bidder Name & Address : SCHEDULE OF QUANTITIES AND PRICES (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name, Address and Values only)
38Total Price for Supply [Schedule S-1]
39Total Price for Work [Schedule S-2]
40Total Price [S-1 + S-2]
41GST @18% [18% of 3]
42Total Bid Price including GST [3+4] Signature Bidder Name: Designation : Name & Address of Company Date: SCHEDULE S-1 : (SUPPLY OF MATERIAL) Tender Specification No.: TD-567/26 (Package-2 : Transmission North East, Gorakhpur & Transmission South East, Prayagraj) Name of Firm: S N Item Unit QTY Ex-Work per unit rate (Rs.) Freight (Rs.) P&F (Rs.) INS (Rs.) Unit FOR Destination rate (Rs.) Total Amt (Exclusive of GST) (Rs.)
43TOWERS (a) Fabrication, galvanizing, Inspection and supply of DC towers including stubs, extension and stub-setting templates, gantry structures as per drawings & BOM (i) Mild steel MT 2939.5499999999997 0.0 0.0 (ii) High Tensile Steel MT 235.601 0.0 0.0 (b) Hot dip galvanized, Hexagon round hexagon head transmission tower Bolts Nuts and washers for above structures as per BOM MT 105.68900000000001 0.0 0.0 (c) Hot dip galvanized, Hexagon ANTI-THEFT tower Bolts Nuts and washers for above structures as per BOM MT 8.4 0.0 0.0
44TOWER ACCESSORIES (a) Number Plate Nos. 509.0 0.0 0.0 (b) Danger Plate Nos. 509.0 0.0 0.0 (c) Phase Plate in sets of red, blue and yellow for Tension towers Nos. 833.0 0.0 0.0 (d) Bird Guard for towers Nos. 1064.0 0.0 0.0 (e) Pipe type earthing material for towers Nos. 623.0 0.0 0.0 (f) Circuit plate (Set of two) SET 231.0 0.0 0.0 (g) Anticlimbing device Nos. 181.0 0.0 0.0
45PORCELAIN DISC INSULATORS (a) 70 KN Nos. 5080.0 0.0 0.0 (b) 120 KN Nos. 30820.0 0.0 0.0 (c) 160 KN Nos. 3840.0 0.0 0.0
46POLYMER INSULATORS / COMPOSITE SILICON RUBBER INSULATOR STRING (a) 70 KN suitable for 132 KV suspension fitting per string 107.0 0.0 0.0 (b) 120 KN suitable for 132 KV tension fitting per string 895.0 0.0 0.0
47HARDWARES SUITABLE FOR ACSR PANTHER (a) Single suspension fittings Nos. 660.0 0.0 0.0 (b) Single Tension fittings Nos. 3457.0 0.0 0.0 (c) Double suspension fittings Nos. 50.0 0.0 0.0 (d) Double Tension fittings Nos. 364.0 0.0 0.0
48HARDWARES SUITABLE FOR ACSR ZEBRA (a) Single suspension fittings Nos. 12.0 0.0 0.0 (b) Single Tension fittings Nos. 192.0 0.0 0.0 (c) Double suspension fittings Nos. 6.0 0.0 0.0 (d) Double Tension fittings Nos. 24.0 0.0 0.0 (e) SS Pilot fitting Nos. 12.0 0.0 0.0
49CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER (a) Vibration Dampers Nos. 4812.0 0.0 0.0 (b) Mid Span compression Joint Nos. 488.0 0.0 0.0 (c) Repair sleeves Nos. 445.0 0.0 0.0 (d) Preformed Armour Rod Nos. 886.0 0.0 0.0
50CONDUCTOR ACCESSORIES SUITABLE FOR ACSR ZEBRA (a) Vibration Dampers Nos. 400.0 0.0 0.0 (b) Mid Span compression Joint Nos. 18.0 0.0 0.0 (c) Repair sleeves Nos. 24.0 0.0 0.0 (d) Preformed Armour Rod Nos. 36.0 0.0 0.0
51OPGW (96 FIBRE) (a) 96 Fibre (DWSM) OPGW Fibre Optic Cable route km 4.0 0.0 0.0 (b) Supply & Installation of Hardware set for 96 Fibre (DWSM) OPGW* route km 4.0 0.0 0.0 (c) Joint box (96 Fibre) Nos. 4.0 0.0 0.0 (d) FODP (192 F) Nos. 1.0 0.0 0.0 (e) Fibre Optic Approach Cable for 96 F OPGW route km 1.0 0.0 0.0 (f) Supply & Installation of hardware set for 96 Fibre (DWSM, G.652D) Fibre Optic Approach Cable* route km 1.0 0.0 0.0
52OPGW (48 FIBRE) (a) 48 Fibre (DWSM) OPGW Fibre Optic Cable route km 151.7 0.0 0.0 (b) Supply & Installation of Hardware set for 48 Fibre (DWSM) OPGW* route km 151.7 0.0 0.0 (c) Joint box (48 Fibre) Nos. 112.0 0.0 0.0 (d) FODP (96 F) Nos. 12.0 0.0 0.0 (e) Fibre Optic Approach Cable for 48 F OPGW route km 11.0 0.0 0.0 (f) Supply & Installation of hardware set for 48 Fibre (DWSM, G.652D) Fibre Optic Approach Cable* route km 18.0 0.0 0.0 Total 0.0 GST @18% 0.0 Total with GST 0.0 NOTE: * One set of installation hardware set shall contain all installation hardware fittings & accessories as may be required for 1 km of OPGW/Fibre Optic Approach Cable. * Tenderer must quote their rates for Ex-Works, Packing and Forwarding, Freight and Insurance Charges separately in Indian Rupees and upto 02 decimal places only as per Columns of above Price Schedule. * GST shall be paid extra (applicable at the time of supply/work) on total of Ex-Works, Packing and Forwarding, Transportation and Insurance Charges. Present rate of GST on work contract is 18%. Signature Date: Bidder Name: Designation : Name & Address of Company SCHEDULE S-2 : (ERECTION WORK) Tender Specification No.: TD-567/26 (Package-2 : Transmission North East, Gorakhpur & Transmission South East, Prayagraj) Name of Firm: S N Description Unit QTY Unit Rate (Rs.) Amount Exclusive of GST (Rs.)
53Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey)
54Check survey
55Soil testing
56Cost of excavation of 132 KV tower foundation pits including all earth work,backfilling, levelling etc.
57Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers : (a) 132 KV DA Nos. 96.0 0.0 (b) 132 KV DB Nos. 93.0 0.0 (c) 132 KV DC/DE Nos. 182.0 0.0 (d) 132/220 KV Multicircuit tower Nos. 5.0 0.0 (e) 220 KV DA Nos. 1.0 0.0 (f) 220 KV DB Nos. 2.0 0.0 (g) 220 KV DC Nos. 5.0 0.0 (h) 220 KV DC/DE Nos. 8.0 0.0 (i) 220 KV Narrow Base D type Nos. 1.0 0.0 (j) 220 KV Multicircuit D type Nos. 4.0 0.0
58Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars (a) 1:2:4 concreting Cu.m. 13739.396999999999 0.0 (b) 1:3:6 concreting Cu.m. 716.19 0.0 (c) 1:1.5:3 concreting Cu.m. 649.33 0.0
59Erection of Superstructure of 132KV/220KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 132/220KV SC/DC/MC lines
60Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers.
61Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Two phases of 132 KV SC/DC lines
62Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Three phases of 132 KV SC lines
63Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all phases of 132 KV MC lines
64Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 132 KV DC lines
65Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Zebra’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 220 KV DC lines
66Laying, stringing, tensioning, clamping, jointing,including fittings of all necessary Hardware and accessories of OPGW & OFAC,installation of FODP, termaination at S/s, end to end connectivity & testing etc on 132KV & 220 KV lines
67Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
68Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc.
69Dismantiling of old existing earthwire/OPGW with all accessories including re-rolling of dismantled Earthwire/OPGW on empty drums for reuse and shifting of all material from site to store.
70Dismantling of old existing 132/220kV Tower with all accessories including stacking of tower parts and shifting of all material from site to store.
71Dismantling of earliers foundation which includes excavation , breaking of foundations upto 2 meter depth and removing of stubs and steel reinforcement, backfilling, levelling and making field suitable for agriculture
72Dismantling of old existing All 3 Phases of ACSR PantherConductor with all accessories including re-rolling of dismantled conductor on empty drums for reuse and shifting of all material from site to store.
73Dismantling of old existing All 2 Phases of ACSR PantherConductor with all accessories including re-rolling of dismantled conductor on empty drums for reuse and shifting of all material from site to store.
74Cutting of following sizes various types of trees like (All type trees) range of corridore of the said 132kv line to provide the maximum clearance of about 13.5 mtr (all clearance 27 mtr) between the tree and conductor on both side of towers/line,with all due care of safty and precautions to avoid any damage to nearby buildings, power and telephone lines poassing nearby,crops other nearby trees etc.The work also includes removing eliminating & cleaning the line sites after cutting of the trees. (a) Tree cutting of up to 1 mtr girth of tree coming in line corridor Nos 2550.0 0.0 (b) Tree cutting of above 1 mtr girth of tree coming in line corridor Nos 1350.0 0.0 (c) Lopping & Chopping of branches of different types of trees like Mango ,Neem, Sheesham, Peepal, Semal, Eucalyptus,Bamboo koty,Popular etc. Falling in the range of corridore of the said 132KV line to provide the minimum clearance of about 8 mtr between the trees & conductors on both side of the towers/ line with all due care of safety & precautions to avoid any damage to nearby buildings power and telephone lines passing nearby crops other nearby trees etc. The work also includes removing eliminating & cleaning the line sites after looping & chopping of the trees. Nos 7675.0 0.0 Total 0.0 Signature Date: Bidder Name: Designation : Name & Address of Company

AI Tender Summary

OUR REF NO 58381244
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 143.57 Crore
LAST DATE 27-11-2026
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender for Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning Etc. For Construction Of 9 Nos. 132/220 Kv Transmission Lines (Approx. 179.28 Route Km) Under Package-1 (Transmission Central, Lucknow) Of Upptcl, On Turn-Key Basis
Basic Detail
Tender No TD-567/26
Bidding Type Tender
Location
City Lucknow
State Uttar Pradesh
Key Dates
Publish Date 04 Nov 2026
Submission Date 27 Nov 2026
Open Date 28 Nov 2026
Finance
Tender Value 143.57 Crore
Tender Fee 17700
EMD 1.43 Crore
Exemption Not Available
Document List
9a3c1fe1-3531-4b37-928f-787b3cf4ed2c.html
BOQ567.xls
SBD_TD567.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Nov 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
html

9a3c1fe1-3531-4b37-928f-787b3cf4ed2c.html

xls

BOQ567.xls

pdf

SBD_TD567.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender