Supply Of Set of Panels to EDTS-355, Rev-1, Amd-1 to 6 (Amendment-5 not applicable) without pump circuit switch gears i.e. MPCB & contactors mentioned at s.no. 36,43 & 44 of BOM of Annexure-A (not required in the HV panel) for Regular LHB Non AC coac
Tender Overview
Project Description
Supply Of set of panels to edts-355, rev-1, amd-1 to 6 (amendment-5 not applicable) without pump circuit switch gears i.e. mpcb & contactors mentioned at s.no. 36,43 & 44 of bom of annexure-a (not required in the hv panel) for regular lhb non ac coaches. note: 1.low voltage panel shall be supplied as per rcf drg.no. cc-72445 alt-a or latest and additional requirement, top & bottom cable entry holes & earthing lugs shall be provided as per icf drg.no icf/sk3-7-2-082 alt-nil or latest. 2.drg.no.ls71103 alt-a anx-1&2 shall be followed for door stopper arrangement and stiffner in hv panel. 3.drg.no.sked-646 icf anx-2 shall be followed for hv panel lh & rh side holes, wsp mounting holes & provision of poly-carbonate sheet. 4.the rbc cum ebc mcbs and its indications shall be provided in the hv & lv panels as per rdso modification sheet no. rdso/pe/ms/ac/0094-2024 (rev 0) and rdso/pe/ms/ac/0095-2024 (rev 0). , set of panels to edts-355, rev-1, amd-1 to 6 (amendment-5 not applicable) without pump ci rcuit switch gears i.e. mpcb & contactors mentioned at s.no. 36,43 & 44 of bom of annexure-a (not require d in the hv panel) for regular lhb non ac coaches. note: 1.low voltage panel shall be supplied as per rc f drg.no. cc-72445 alt-a or latest and additional requirement, top & bottom cable entry holes & earthing lu gs shall be provided as per icf drg.no icf/sk3-7-2-082 alt-nil or latest. 2.drg.no.ls71103 alt-a anx-1&2 sh all be followed for door stopper arrangement and stiffner in hv panel. 3.drg.no.sked-646 icf anx-2 shall b e followed for hv panel lh & rh side holes, wsp mounting holes & provision of poly-carbonate sheet. 4.the rbc cum ebc mcbs and its indications shall be provided in the hv & lv panels as per rdso modification s heet no. rdso/pe/ms/ac/0094-2024 (rev 0) and rdso/pe/ms/ac/0095-2024 (rev 0). [ warranty period: 30 months after the date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender