Bids Are invited for Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17 - Title1 - Carriage Of Pcc,Stp Pole And Line Material From Esc, Lakhim
Tender Overview
Project Description
Bids Are invited for Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17 - Title1 - Carriage Of Pcc,Stp Pole And Line Material From Esc, Lakhimpur To Work Site (Aprox Distance 0 To 55 Km) , Title2 - Dragging Of St,Pcc Pole To Pit Site, Digging And Erection (As Per Respo Norms) Of 11 Kv 9,11,8.5 Mtr Long St,Pcc Pole With Fixing Of Necessary Items, Such As V-Type X-Arm, F-Bracket, 11 Kv Pin,Disc Insulator, With Nut And Bolts Its Ramming As Per Resspo Specification Errection Of Line Fallen Conductor And Its Sagging. , Title3 - Fixing And Errection Of Broken Double Pole On 8.5 Mtr. Long Pcc Pole Along With Fixing Of Necessary Hardware Of Double Pole Alongwith Necessery Pin Insulators And Grouting As Per Resspo Specification And Direction Of E,I. , Title4 - Streightning Of Tilted Stp Poles 11 Mtr. Long By Digging Of Pole Opening Of Binding On Insulator Refitting Of Earth And Raining And Binding Of Conductor On Insulator. , Title5 - Streightning Of Tilted Pcc Poles 8.5 Mtr. Long By Digging Of Pole Opening Of Binding On Insulator Refitting Of Earth And Raining And Binding Of Conductor On Insulator. , Title6 - Grouting Of Pcc And St Pole With Civil Material (Cement Coarse Sandstone Ballast In 123 Ratio) With Grouting Of Pole Upto 0.3 Mtr. Above Ground Level (As Per Respo Norms). Only Pole Shall Be Supplied By The Department. , Title7 - Resagging Of Loose Conductor Of 33 Kv Line Including Opening Of Binding And Rebinding After Sagging Of Conductor. , Title8 - Resagging Of Loose Conductor On 11 Kv Line Including Opening Of Binding And Rebinding After Sagging Of Conductor. , Title9 - Streightning Of Tilled Cross Arm Of 33 Kv Line Including Proper Tighting Of Clamp And Fitting Of Pin Insulators. , Title10 - Streightning Of Tilled Cross Arm Of 11 Kv Line Including Proper Tighting Of Clamp And Fitting Of Pin Insulators. , Title11 - Cutting Of Tree Branches Near 33 Kv Line To Avoid Tripping. , Title12 - Cutting Of Tree Branches Near 11 Kv Line To Avoid Tripping. , Title13 - Cutting Of Tree Branches Near Lt Line To Avoid Tripping. , Title14 - Supply And Erection Of V-X Holding Clamp , Title15 - Supply And Erection Of F Clamp , Title16 - Supply And Erection Of Lt Clamp , Title17 - Supply And Erection Of Nut And Bolt
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Title1 | Carriage of PCC,STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM) |
| 2 | Title2 | Dragging of ST,PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9,11,8.5 mtr long ST,PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin,Disc insulator, with nut and bolts its ramming as per RESSPO Specification Errection of line fallen conductor and its sagging. |
| 3 | Title3 | Fixing and errection of broken double pole on 8.5 mtr. Long PCC pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E,I. |
| 4 | Title4 | Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator. |
| 5 | Title5 | Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator. |
| 6 | Title6 | Grouting of PCC and ST Pole with civil material (cement Coarse sandStone ballast in 123 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department. |
| 7 | Title7 | Resagging of loose conductor of 33 KV line including opening of binding and rebinding after sagging of conductor. |
| 8 | Title8 | Resagging of loose conductor on 11 KV line including opening of binding and rebinding after sagging of conductor. |
| 9 | Title9 | Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators. |
| 10 | Title10 | Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators. |
| 11 | Title11 | Cutting of tree branches near 33 KV line to avoid tripping. |
| 12 | Title12 | Cutting of tree branches near 11 KV line to avoid tripping. |
| 13 | Title13 | Cutting of tree branches near LT line to avoid tripping. |
| 14 | Title14 | SUPPLY AND ERECTION OF V-X HOLDING CLAMP |
| 15 | Title15 | SUPPLY AND ERECTION OF F CLAMP |
| 16 | Title16 | SUPPLY AND ERECTION OF LT CLAMP |
| 17 | Title17 | SUPPLY AND ERECTION OF NUT and BOLT |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender