Tender For Repair / Maintenance Of Air Conditioning Plant And Other Misc Works At Arde
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Nov 2026
3 days left
EMD
98000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair / Maintenance Of Air Conditioning Plant And Other Misc Works At Arde
BOQ
| Sl. No. | Item Description |
| 1 | Supply, installation, commissioning & testing of factory made, CPRI type tested, indoor, cubical compartmental type \\"HPVC Panel\\" of suitable size, conforming to IEC 61439 - 1 & 2, IEC 61641, having both sides opernable with hinged double doors & locking arrangement and IP 42 protection made out of 2.0 mm thick mild steel CRCA sheet, supported and fixed on structural frame of angle iron of suitable size, including earthing stud, labeling, painting to all internal & external exposed steel surfaces with powder coating paint (7 tank process), duly fixed in ground with PCC foundation (1:2:4) type B1, with danger notice plate of 1.6mm thick mild steel sheet, vitreous enameled (white) with letters figures and conventional skill and bones in signal red colour, suitable for 3 - phase 4 wire system, 500V grade with necessary wiring, PVC sheathed stranded copper conductor of appropriate length & size, including fixing lugs, bolts, screws etc. complete with accessories as specified and directed by the Engineer-in-ChargeMake : CPRI approved panel builder, the HVAC panel shall comprise of the following : Busbar Chambar :(i) 01 Set (3L+N) of copper busbar of rated capacity 350 A, covered with PVC insulated sleeves including insulator, nuts, bolts, etc. with complete connection.Incoming(i) MCCB FP, 160 Amps, 415 V, Ics = 100% Icu = 36 KA, 50 Hz, conforming to IEC 60947-2,having thermal magnetic based trip unit, adjustable oveload setting (0.7 -1 X In), Adjustable short-circuit setting (5 - 10 X Ir), Adjustable neutral protection (N, N/2, OFF), front indication LEDs (Ready, Overload and pre-alarm & Overload) - 01 No.(ii) CI 1.0 multi-function meter capable of measuring V,A,F, PF |
| 2 | Matrial and Labour for ADM Groups Package AC water cooled type Should Be Completely Dismentled in a Proper manner . The electrical pannel Condenser Pump , Pipe Line from the condenser pump to the cooling tower and all the pipelines of the package AC should be brought to room number 3 in a proper manner. The contractor should arrange the necessary equipment, cutting machine, fork lift, crane, and all the equipment for this. All the materials in the plant should be shifted to room number 3 in the main building all as directed by Engr-in-Charge. |
| 3 | Supply and installation in repairs at the water cooled type Packgage AC unit supplied by ADM group at plant Room No 3 including construction at 4ft x 4ft x 2ft high RCC concrete foundation provision and gravaling at the procured matching stand, proper positioning, leveling and alignment at the AC unit and complete duly and refrigerant gas piping connection and C channel, MS Angles, Pipe duct supporting, clamps, fitting insulation, fastner and accessories. Refrigerant piping shall be properly supported and insulated after insualtion and successfully testing carryout vaccaning and requirement charging as per the complete all as specified and directed. |
| 4 | Material and labour in repair for GI Pipe heavy grade 'C' class including necessary fittings laid in trenches / fixed on wall complete all as specified and are directed for the following sizes :-(a) GI Tube 40 mm |
| 5 | (b) GI Tube 50mm |
| 6 | (c) GI Tube 15 mm |
| 7 | (d) GI Tube 20mm |
| 8 | (e) GI Tube 25MM |
| 9 | Supply And Fix in repairs Gun Metal Globe Gate Valve of following size complete all as specified and directed. (a) 40mm |
| 10 | (b) 25mm |
| 11 | (c) 50mm |
| 12 | Material and labour in repairs for 3mm CRCA Sheet Powder coated out door panel of suitable size with aluminium bus bar of 100 Amps with 3 phase and neutral fixed on wall / floor with necessary fixing arrangements including comprising of following :Incoming :MCCB 63 AMPS, 4 Pole, 16 KA fixed type -01 Nos.Outgoing :MCCB 32 AMPS, 3 Pole, 16 KA fixed type -02 NosDOL starter 5 HP, 3 phase -02 NosMCB SP 10 AMPS -02 NosIndicator lamps -03 NosAmp meter - 01 NosVolt meter - 01 Nos |
| 13 | Removing existing false ceiling (20m x 4.6m) and repairing duct after repairing duct refixing the false ceiling match with as per existing and making good the distrubed surface complete all as specified and directed. |
| 14 | Material and labour for providing 20 Gauge GI sheet with TDF flanged rectangular/square duct made out of \\"L\\" shaped hollow profile including all accessories such as corner, cleat, carriage bolts, gaskets and appropriate sealent on longitudinal joints etc complete of size 22 guage including GI sheet cover 28 guage all as directed and connecting/matching to the existing ducting system, including necessary brackets/supports of suitable size MS angle and painting the supports with two coats of synthetic enameled paint over a coat of primer complete all as specified and directed by Engr-in-Charge.Note : Insulation will be measured and paid separaterly. |
| 15 | Material and labour for duct insulation providing 25 mm thick Nitrile Rubber insulation with Aluminium Foil of density 40-50 kg/m3 using CPRX solution as adhesive for fixing complete all as specified and directed by Engr-in-Charge. |
| 16 | Supply and fixing in repairs of Rotational moulded polyethylene water storage tanks capacity 1000 ltrs (cylindrical vertical with closed top) hoisted and fixed on PCC structure for cooling tower makeup water including MS ERW pipe line connections 25 mm dia with necessary control valves provide for inlet, outlet and drain complete all as specified and directed. Note: PCC work for PVC tank shall be Measured and paid separetly. |
| 17 | Supply and fixing in repairs for temperature control Sensor suitable for central AC Plant as per existing/site required complete all as specified and directed. |
| 18 | Material and labour for in replacement of existing unserviceable Controller With Pcb Card and Display Air cooled Central AC Plant Model No. ACDSO 34 DPMN 3x1 complete all as specified and directed by Engr-in-Charge. |
| 19 | Material and labour for in replacement of existing unserviceable Controller With MPVD, MPD, And Air cooled Central AC Plant Model No. ACDSO 34 DPMN 3x1 complete all as specified and directed by Engr-in-Charge. |
| 20 | Supply and fix in repairs wornout crankcase heaters of compressor of Make : Danfoss scroll compressor, SM 185, and as per existing specifications at site all as directed by Engr-in-Charge. |
| 21 | Material and labour for PZT Building Floor 5.5 Ton Ceiling Suspended Ductable AC After removing the hollow core, remove the Cooling coil, drain tray completely and as per the tray pattern, make a new tray with 2 mm thickness in SS 304 and fix the cooling coil in place. After fitting all the AC fittings, install the AC in its original place and braze the copper connection and copper pipe. After holding the nitrogen pressure for 48 hours vacuum it, charge the gas and start the machine again complete all as specified and directed. |
| 22 | Material and labour for descaling of shell and tube type water cooled condenser of capacity 5 to 7.5 TR with MS shell and intergral copper tubes with safety valve with cleaning agent including flushing / descaling compound and through cleaning with descaling nylon brush with rod and circulating by descaling pump including repalcement of gasket set, nuts and bolts and leak testing after descaling / cleaning of condenser unit complete all as specified and directed by Engr-in-Charge. |
| 23 | Material and labour for descaling of shell and tube type water cooled condenser of capacity 8 to 15 TR with MS shell and intergral copper tubes with safety valve with cleaning agent including flushing / descaling compound and through cleaning with descaling nylon brush with rod and circulating by descaling pump including repalcement of gasket set, nuts and bolts and leak testing after descaling / cleaning of condenser unit copmlete all as specified and directed by Engr-in-Charge. |
| 24 | Material and labour for descaling of shell and tube type water cooled condenser of capacity 16 to 20 TR with MS shell and intergral copper tubes with safety valve with cleaning agent including flushing / descaling compound and through cleaning with descaling nylon brush with rod and circulating by descaling pump including repalcement of gasket set, nuts and bolts and leak testing after descaling / cleaning of condenser unit complete all as specified and directed by Engr-in-Charge. |
| 25 | Material and labour for descaling of shell and tube type water cooled condenser of capacity 21 to 35 TR with MS shell and intergral copper tubes with safety valve with cleaning agent including flushing / descaling compound and through cleaning with descaling nylon brush with rod and circulating by descaling pump including repalcement of gasket set, nuts and bolts and leak testing after descaling / cleaning of condenser unit complete all as specified and directed by Engr-in-Charge. |
| 26 | Material and labour for disconnecting electrical connections motor located at the top of cooling tower keep cables at safe custody for reconnection and dismantling and taking out fan blade assembly along with motor mounted on base frame at the top of cooling tower after cutting / dismentaling all nuts, bolts and fixtures from the mounting frame and removing whole assembly including motor and base frame from the top of cooling tower with the help of T&P for servicing of cooling tower suitable for any capcity including following complete upto 50 TR :-(i) Cleaning /scrapping of inner & outer surface of FRP basin, repair of damaged portion if any incuding FRP lining of all surfaces joints to avoid leakage including replacement of all nuts and bolts joining all parts of Basin complete. (ii) Servicing cooling tower plant through cleaning re-agent complete pipe line, including servicing of cooling tower motor and fan and make the necessary alignment with motor. (iii) Replacement of bearing if any of suitable capacity if any after necessory work including gressing and replacement of nut bolts and preventing leakage if any by means of suitable adetives etc all as directed and specified. (iv) Taking out PVC fills blocks, cleaning and refixing as per existing location and channel direction. (v) Servicing of spray header and sprinkler assy complete. (vi) Repair of water strainer complete. |
| 27 | Supply only spare parts of cooling tower any capacity to be incorporated under item as :-(a) PVC fills (Big size) in colums of size 60 x 30 x 15 cm or next higher size as per existing specification and requirement. |
| 28 | (b) PVC fills (small size) in colums of size 60 x 15 x 15 cm or next higher size as per existing specification and requirement |
| 29 | (c) Roller bearing/Pedestal bearings for fan motor as per sample of make SKF |
| 30 | (d) Ball / Roller bearing for Sprinlkler top and Bottom Hub for 5 TR to 15 TR capacity |
| 31 | (e) Ball / Roller bearing for Sprinlkler top and Bottom Hub for 16 TR to 30 TR capacity |
| 32 | (f) Sprinkler Hub top and bottom portion with PVC pipe and cap complete set for capacity 15 to 30TR |
| 33 | (g) Sprinkler Hub top and bottom portion with PVC pipe and cap complete set for capacity 5 to 7.5 TR |
| 34 | Supply and fix toggle switch one way 5 Amps including control wiring and lugs if any complete all as specified and directed. |
| 35 | Supply only spare parts of AHU of capacity 5 TR to 60TR to be incorporated under item as per :(a) Roller bearing/ball/taper bearings for blower motor as per sample of make SKF |
| 36 | (b) Ball / Roller bearing/Pedestal for Blower shaft or as per existing specifications. |
| 37 | Material and labour for servicing and cleaning of cooling coil 4-6 rows deep of capacity 5 TR to 60 TR through cleaning agent and remove the oil and dust from fins and cooper tubes / pipes complete checking of copper tubing for leakage maching / repairing / brazing of leakaged tubes complete including sealing of joints complete all as specified and directed by engineer in charge. |
| 38 | Supply and fix in repair of defective worn out unserviceale spare parts of hot water generator of capacity 10KW to 50KW for Make as per sample of existing make availale at site :-.(a) Heater Rod upto 3KW, suitable 1 PH, 230V AC supply as per sample. |
| 39 | (b) Duct / strip Heater 2 Kw Suitable 1 PH, 230V ac Supply as per sample |
| 40 | (c) duct/ Strip Heater 3/4 Kw sutibale 1 PH, 230v AC supply as Per sample |
| 41 | Supply and fixing in repairs of Terminal heater plate suitalble for item No of heater rods including control circuit. |
| 42 | Supply and fixing in repairs of Thermostate and control switch ON/OFF assy control auto and manual paramerters. |
| 43 | Material and labour for checking and testing of Electrical control panel of AC Plant for interlock panel wiring, detecting the fault / defects including replacement of minor burnt wires, lugs, terminal, inter lock and making panel in workable condition complete all as specified and directed by Engineer-in-Charge. |
| 44 | Supply only R-407C Refrigerant gas in returnable company sealed cylinder of 61kg each with test certificate of cylinder complete all as specified and directed. |
| 45 | Supply only R-22 Refrigerant gas in returnable company sealed cylinder of 61kg each with test certificate of cylinder complete all as specified and directed. |
| 46 | Supply only Nitrogen gas as required pressure for leak testing of central AC plant complete all as specified and directed by Engineer - in - Charge. |
| 47 | Material and labour for checking leakage of gas pressure using nitrogen gas for central A/C plant filled in standard and required pressure complete all as specified and directed by Engineer - in - Charge. Note: Nitrogen gas shall be measured and paid separately. |
| 48 | Supply and charging of Danfoss scroll compressor oil P.O.E 160P SZ after flushing out old oil of compressor and testing commissioning complete all as directed by Engineer-in-Charge. |
| 49 | Supply and fix in repairs of Bearing 70TR AHU Cadas AC Plants, Bearing with Housing and Bushing Shaft Dia 52mm Including Cutting welding Brazing work both end plate AHU complete all as specified and directed. Please Enable Macros to View BoQ information |
| 50 | Supply and fix in repairs of Bearing 70TR AHU Cadas AC Plants, Bearing with Housing and Bushing Shaft Dia 52mm Including Cutting welding Brazing work both end plate AHU complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysDec 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents