Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Erection Of 11 Kv Line For Construction Of Independence Feeder For Electrification Of Cwr
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation, The Work Of Erection Of 11 Kv Line For Construction Of Independence Feeder For Electrification Of Cwr Vill Sahurpur Of Jal.. - The Work Of Erection Of 11 Kv Line For Construction Of Independence Feeder For Electrification Of Cwr Vill. Sahurpur (Tindwari) Of Jal Jivan Mishan Under Full Deposit Scheme 2026-27 Under Edd, Banda (Rural), Including Carriage Of All Required Material From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old/Damaged Scraped Material/Tfs From Site To Store Centre, If Any. All Works Like Erection, Fixing, Installation, Laying & Grouting Etc. Shall Be Done By Firm As Per Direction Of Engineer Incharge/Resspo Manual. During The Erection Of Lines/Poles Has To Be Done Including Cartage. Various Type Petty Materials/Work, Which Are Not Mentioned In Scope Of Work, But Actual Required Has To Be Arranged By Contractor At His Own Cost. No Extra Payment Will Be Made To Such Petty Requirement. The Material Supplied By Contractor Should Be The Best Quality And As Per Standard/Resspo Norms, Including Transportation, If Any. All Steel Material Supplied By Firm Have To Galavanised, Details Of The Work As Given Below :- , Supply Of Following Materials Including Loading, Unloading At Site :- , Stp Pole 11 Mtr. Long , Stp Pole 13 Mtr. Long , 11 Kv Xlpe Cable 3X185 Sq.Mm. , Guarding Angle With Clamp & Nut-Bolts , 11 Kv Pin Insulator With Pin And Nut , 11 Kv Disc Insulator With Fitting , Stay Set Complete (Stay Rod 16X1800 Mm, Stay Wire 5 Kg., Stay Clamp, Bolt-Nuts Etc). , Earthing Complete (Earthing Rod Of 20X2500 Mm & 6 Swg Earthing Wire Etc.) , Dropper Channel With Clamp & Nut-Bolts , Top Channel With Clamp & Nut-Bolts , Ms Angle Cross Bracing With Clamps And Nut-Bolts, Washers , 11 Kv Vcb Incoming Ctr 600/300/5A , 11 Kv Vcb Outgoing Ctr 200/100/5A , 11 Kv V-Type Steel X-Arm , 11 Kv Cable Jointing Kit Suitable For 11 Kv Xlpe Cable 3X185 Sq.Mm. , Stone Pad , 11 Kv X-Arm Holding Clamp With Nut-Bolts & Washers For Stp , 11 Kv X-Arm Holding Clamp With Nut-Bolts & Washers For Pcc , 11 Kv F-Bracket With Nut-Bolts & Washers , Danger Board With Clamp & Nut-Bolts , Barbed Wire , Number Plate With Clamp , Pg Clamp , Nut-Bolts & Washers Of Suitable Size , Red Oxide Paint , Alluminium Paint , Gi Pipe , The Work Of Erection/Installation/Fixing Of Following :- , Safe Carriage Of Following Material From Electricity Store Centre To Pit Site Of Work Through The Kachcha And Pakka Road, Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P Etc. Which Required For Proper Completion Of Work (Distance 00-50 Kms.) , Acsr Rabbit/Weasel/Dog Conductor , Pcc Pole 8.5 Mtr. Long , Erection Of Following Poles With Grouting Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Compete Ht/Lt Fittings As Per Direction Of Engineer Incharge/Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5 Mtr. Long , Stp Pole 11 Mtr. Long , Stp Pole 13 Mtr. Long , Fixing/Erection Of Following Items, Cost Of Labour, Material And T&P Which Required For Completion Of Work :- , Stone Pad , 11 Kv X-Arm Holding Clamp With Nut-Bolts & Washers For Stp , 11 Kv X-Arm Holding Clamp With Nut-Bolts & Washers For Pcc , 11 Kv F-Bracket With Nut-Bolts & Washers , Danger Board With Clamp & Nut-Bolts , Barbed Wire , Number Plate With Clamp , Pg Clamp , Nut-Bolts & Washers Of Suitable Size , Red Oxide Paint , Alluminium Paint , Gi Pipe , 11 Kv Pin Insulator With Pin And Nut , 11 Kv Disc Insulator With Fitting , Dropper Channel With Clamp & Nut-Bolts , Top Channel With Clamp & Nut-Bolts , 11 Kv V-Type Steel X-Arm , 11 Kv Cable Jointing Kit Suitable For 11 Kv Xlpe Cable 3X185 Sq.Mm. , Ms Angle Cross Bracing With Clamps And Nut-Bolts, Washers , Erection And Grouting Of Stay Set Complete Including The Work Of Nozelling Etc. As Per Resspo Manual. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor As His Own Cost. , Fixing Of Earthing Rod Complete As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding And Jumpering Of Following Conductor/Cable On The Erected Poles In 33 Kv/11 Kv Ht/Lt Lines As Per Direction Of Supervising Engineer/Resspo Manual. Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Acsr Rabbit/Weasel/Dog Conductor , 11 Kv Xlpe Cable 3X185 Sq.Mm. , Underground Laying/Drilling Of 11 Kv Xlpe Cable Along With Sand & Brick Complete , Installation Of 11 Kv Vcb Incoming Ctr 600/300/5A As Per Resspo Manual And As Per Direction Of Supervising Engineer. , Installation Of 11 Kv Vcb Outgoing Ctr 200/100/5A As Per Resspo Manual And As Per Direction Of Supervising Engineer. , Re-Guarding/Guarding Of 11 Kv Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parellel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.36 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | The work of erection of 11 KV Line for construction of independence feeder for electrification of CWR Vill. Sahurpur (Tindwari) of Jal Jivan Mishan under FULL DEPOSIT SCHEME 2026-27 under EDD, BANDA (Rural), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- | The work of erection of 11 KV Line for construction of independence feeder for electrification of CWR Vill. Sahurpur (Tindwari) of Jal Jivan Mishan under FULL DEPOSIT SCHEME 2026-27 under EDD, BANDA (Rural), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. The material supplied by contractor should be the best quality and as per standard/RESSPO norms, including transportation, if any. All steel material supplied by firm have to Galavanised, Details of the work as given below :- |
| 2 | Supply of following materials including loading, unloading at site :- | Supply of following materials including loading, unloading at site :- |
| 3 | STP Pole 11 Mtr. Long | STP Pole 11 Mtr. Long |
| 4 | STP Pole 13 Mtr. Long | STP Pole 13 Mtr. Long |
| 5 | 11 KV XLPE Cable 3x185 Sq.mm. | 11 KV XLPE Cable 3x185 Sq.mm. |
| 6 | Guarding Angle with clamp & Nut-bolts | Guarding Angle with clamp & Nut-bolts |
| 7 | 11 KV Pin Insulator with pin and nut | 11 KV Pin Insulator with pin and nut |
| 8 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 9 | Stay Set Complete (Stay Rod 16x1800 mm, Stay Wire 5 Kg., Stay Clamp, Bolt-Nuts etc). | Stay Set Complete (Stay Rod 16x1800 mm, Stay Wire 5 Kg., Stay Clamp, Bolt-Nuts etc). |
| 10 | Earthing Complete (Earthing Rod of 20x2500 mm & 6 SWG earthing wire etc.) | Earthing Complete (Earthing Rod of 20x2500 mm & 6 SWG earthing wire etc.) |
| 11 | Dropper Channel with Clamp & nut-bolts | Dropper Channel with Clamp & nut-bolts |
| 12 | Top Channel with Clamp & nut-bolts | Top Channel with Clamp & nut-bolts |
| 13 | MS Angle Cross Bracing with clamps and Nut-Bolts, washers | MS Angle Cross Bracing with clamps and Nut-Bolts, washers |
| 14 | 11 KV VCB Incoming CTR 600/300/5A | 11 KV VCB Incoming CTR 600/300/5A |
| 15 | 11 KV VCB Outgoing CTR 200/100/5A | 11 KV VCB Outgoing CTR 200/100/5A |
| 16 | 11 KV V-Type Steel X-arm | 11 KV V-Type Steel X-arm |
| 17 | 11 KV Cable Jointing Kit suitable for 11 KV XLPE Cable 3x185 Sq.mm. | 11 KV Cable Jointing Kit suitable for 11 KV XLPE Cable 3x185 Sq.mm. |
| 18 | Stone Pad | Stone Pad |
| 19 | 11 KV X-arm Holding clamp with Nut-Bolts & washers for STP | 11 KV X-arm Holding clamp with Nut-Bolts & washers for STP |
| 20 | 11 KV X-arm Holding clamp with Nut-Bolts & washers for PCC | 11 KV X-arm Holding clamp with Nut-Bolts & washers for PCC |
| 21 | 11 KV F-Bracket with Nut-Bolts & washers | 11 KV F-Bracket with Nut-Bolts & washers |
| 22 | Danger Board with Clamp & Nut-Bolts | Danger Board with Clamp & Nut-Bolts |
| 23 | Barbed Wire | Barbed Wire |
| 24 | Number Plate with clamp | Number Plate with clamp |
| 25 | PG Clamp | PG Clamp |
| 26 | Nut-Bolts & washers of suitable size | Nut-Bolts & washers of suitable size |
| 27 | Red Oxide Paint | Red Oxide Paint |
| 28 | Alluminium Paint | Alluminium Paint |
| 29 | GI Pipe | GI Pipe |
| 30 | The work of erection/installation/fixing of following :- | The work of erection/installation/fixing of following :- |
| 31 | Safe carriage of following material from electricity store centre to pit site of work through the Kachcha and pakka road, including loading and unloading at the respective ends including the cost of arrangement of labour, T&P etc. which required for proper completion of work (Distance 00-50 Kms.) | Safe carriage of following material from electricity store centre to pit site of work through the Kachcha and pakka road, including loading and unloading at the respective ends including the cost of arrangement of labour, T&P etc. which required for proper completion of work (Distance 00-50 Kms.) |
| 32 | ACSR Rabbit/Weasel/Dog Conductor | ACSR Rabbit/Weasel/Dog Conductor |
| 33 | PCC Pole 8.5 Mtr. Long | PCC Pole 8.5 Mtr. Long |
| 34 | Erection of following poles with grouting including cutting of kharanja/mettalic road/concrete portion while digging pit & compete HT/LT fittings as per direction of Engineer incharge/RESSPO manual including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of following poles with grouting including cutting of kharanja/mettalic road/concrete portion while digging pit & compete HT/LT fittings as per direction of Engineer incharge/RESSPO manual including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 35 | PCC Pole 8.5 Mtr. Long | PCC Pole 8.5 Mtr. Long |
| 36 | STP Pole 11 Mtr. Long | STP Pole 11 Mtr. Long |
| 37 | STP Pole 13 Mtr. Long | STP Pole 13 Mtr. Long |
| 38 | Fixing/erection of following items, cost of labour, material and T&P which required for completion of work :- | Fixing/erection of following items, cost of labour, material and T&P which required for completion of work :- |
| 39 | Stone Pad | Stone Pad |
| 40 | 11 KV X-arm Holding clamp with Nut-Bolts & washers for STP | 11 KV X-arm Holding clamp with Nut-Bolts & washers for STP |
| 41 | 11 KV X-arm Holding clamp with Nut-Bolts & washers for PCC | 11 KV X-arm Holding clamp with Nut-Bolts & washers for PCC |
| 42 | 11 KV F-Bracket with Nut-Bolts & washers | 11 KV F-Bracket with Nut-Bolts & washers |
| 43 | Danger Board with Clamp & Nut-Bolts | Danger Board with Clamp & Nut-Bolts |
| 44 | Barbed Wire | Barbed Wire |
| 45 | Number Plate with clamp | Number Plate with clamp |
| 46 | PG Clamp | PG Clamp |
| 47 | Nut-Bolts & washers of suitable size | Nut-Bolts & washers of suitable size |
| 48 | Red Oxide Paint | Red Oxide Paint |
| 49 | Alluminium Paint | Alluminium Paint |
| 50 | GI Pipe | GI Pipe |
| 51 | 11 KV Pin Insulator with pin and nut | 11 KV Pin Insulator with pin and nut |
| 52 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 53 | Dropper Channel with Clamp & nut-bolts | Dropper Channel with Clamp & nut-bolts |
| 54 | Top Channel with Clamp & nut-bolts | Top Channel with Clamp & nut-bolts |
| 55 | 11 KV V-Type Steel X-arm | 11 KV V-Type Steel X-arm |
| 56 | 11 KV Cable Jointing Kit suitable for 11 KV XLPE Cable 3x185 Sq.mm. | 11 KV Cable Jointing Kit suitable for 11 KV XLPE Cable 3x185 Sq.mm. |
| 57 | MS Angle Cross Bracing with clamps and Nut-Bolts, washers | MS Angle Cross Bracing with clamps and Nut-Bolts, washers |
| 58 | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor as his own cost. | Erection and grouting of stay set complete including the work of nozelling etc. as per RESSPO manual. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor as his own cost. |
| 59 | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod complete as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 60 | Laying, sagging, stringing, binding and jumpering of following conductor/cable on the erected poles in 33 KV/11 KV HT/LT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Laying, sagging, stringing, binding and jumpering of following conductor/cable on the erected poles in 33 KV/11 KV HT/LT lines as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 61 | ACSR Rabbit/Weasel/Dog Conductor | ACSR Rabbit/Weasel/Dog Conductor |
| 62 | 11 KV XLPE Cable 3x185 Sq.mm. | 11 KV XLPE Cable 3x185 Sq.mm. |
| 63 | Underground Laying/drilling of 11 KV XLPE Cable along with sand & brick complete | Underground Laying/drilling of 11 KV XLPE Cable along with sand & brick complete |
| 64 | Installation of 11 KV VCB Incoming CTR 600/300/5A as per RESSPO manual and as per direction of supervising engineer. | Installation of 11 KV VCB Incoming CTR 600/300/5A as per RESSPO manual and as per direction of supervising engineer. |
| 65 | Installation of 11 KV VCB Outgoing CTR 200/100/5A as per RESSPO manual and as per direction of supervising engineer. | Installation of 11 KV VCB Outgoing CTR 200/100/5A as per RESSPO manual and as per direction of supervising engineer. |
| 66 | Re-guarding/guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parellel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of x-guards (Tillis) of GI wire at distance of 3 Mtr. | Re-guarding/guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parellel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of x-guards (Tillis) of GI wire at distance of 3 Mtr. |
| 67 | Note: Any quantity of item from sl no. 1 to sl no. 2.36 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.36 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender