Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 18 days TDR #58349870

Bids Are invited for Custom Bid For Services - Hiring Any Agency For Composite Works At Cng Station In Roorkee - Design, Engineering, Manufacture, Shop Testing, Supply Including Packing And Forwarding, Transportation, Delivery At Storage And From Sto

Issued by Boards / Undertakings / PSU · Haridwar, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Nov 2026
18 days left
EMD
1.19 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Haridwar → Uttarakhand
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Hiring Any Agency For Composite Works At Cng Station In Roorkee - Design, Engineering, Manufacture, Shop Testing, Supply Including Packing And Forwarding, Transportation, Delivery At Storage And From Storage To Site Of Power Distribution Board (Pdb) : , 415 V, 36 Ka Single Front Type Indoor Pdb To Receive Input Power Consisting Of Bus Bar Chamber, Cable Alley,Outgoing With Fuse Complete With Wiring, Indication Lamp, Ammeter, Voltmeter, Mfm (Multi Function Meter) Etc Including All Labour And Materials With Operating Mechanism, All Accessories, Mandatory Spares As Per Data Sheet, Auxiliaries With Flp Lcs(Local Control Switch) For Tripping The Main Incomer Of Pdb Etc Complete In All Respects As Specified In Technical Specification, Data Sheet & Sld & As Per Standard Specification.Single In-Comer Of 125 (With Single Phase Preventer) 4P Mccb (With Micro Processor And Based O/C,S/C & E/F Relase With Lsig & Shunt Trip) Along With Vmr.Outgoing With 01 No. 80 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Booster Compressor.Outgoing With 01 No. 63 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Apfc Panel.Outgoing With 02 Nos. 32 Tpn Mccb (With Tm Based O/C, S/C & E/F Relase) For Ups And Static Bypass.Outgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb With Timer(24Hrs) Auto/Mannualoutgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb Without Timer , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Floor Mounted Apfc Panel Of 10Kvar Capacitor Bank In Steps Of 4X2.5 Kvar Capacitors Consisting Of Bus Bar Chamber, Cable Alley Incoming (Fsu), Outgoing Feeder (Fsus) As Specified In Tender Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Outdoor Type Dust & Weather Proof Sheet Steel (2 Mm Thick) Enclosed Mccb Of Following Rating For Mounting On Wall Or Pedestal. 125A, 415V, 4 Pole, Ac-23 Duty And Suitable For Termination Of 3.5 X 95/50 Sq.Mm A2xfy Cable On Incomer Terminals And Outgoing Terminals, With Ryb Indication. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Including Packing And Forwarding, Transportation, Delivery At Storage Of Lighting Fixtures Complete With Mounting Bracket, Flame Proof/Non Flame Proof, Control Gear Box/ Junction Box ,Glands ,Lugs As Per The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables And Connecting Work, With All Material And Labour As Per Specifications, Drawings And Instruction Of Engineer-In-Charge. Work To Be Completed In All Respects. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering, Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The Complete Earthing And Lightning Protection System, Earth Electrodes/ Pit, Earth Main Ring, Earthing Of Electrical Equipments, Instrument Panels, Field Instruments, Process Equipments And Pipes/ Flanges Including All Associated Civil Work With All Material (Like Bitumen Coating) And Labour As Per Specification And Drawings Approved By The Company In With Is 3043. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering,Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The 1.1Kv Grade Xlpe Insulated, Pvc Sheathed, Frls Power And Control Cables (Conforming To Is:7098 And Specification) Including Cable Glands & Lugs Etc.Of Following Sizes In Trenches/ Excavated Under Ground Trench /Trays, Pulling Through Pipes And Its Proper Sealing, Cutting Of Paved Area, Roads Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Following Including Necessary Clamp, Bolts, Rawl Plugs Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Installation, Testing And Commissioning Including Packing And Forwarding, Transportation, Delivery At Storage Oflighting Fixtures Complete With Mounting Bracket, Flame Proofinon Flame Proof, Control Gear Box/ Junction Box, Glands , Lugs As The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables Andconnecting Work, With All Material And Labour As Specifications, Drawings And Instruction Ofengineer-In-Charge. Work To Be Completed In All Respects. , 80% On Completion Of Installation. , 10% On Testin , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Laying Of Ss Tubes With Pvc Tube Clamp, Hydro Testing At 375 Bar And Commissioning Of Ss Tubes Along With Fittings, Hose, Mass Flow Meter And Valves As Given Below And As Per Technical Specification And Scope Of Work Including Handling, Lifting, Transportation From Stores To Location Of Cng Stations. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Tubes As Per Technical Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Fittings , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Equal Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Nut , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Back Ferrule , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Plug , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Cap , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Quick Connect Body & Stem , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Male Connector , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Ball Valves Conforming To Technical Specification For Ss Ball Valves Of Following Sizes, Specifications As Indicated Below : , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of High Pressure Cng Hose Assembly (Conductive Core Thermoplastic Hose Assembly) , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling (Including Lifting And Transportation From Clients Store Within Ga To Cng Stations) And Erecting In Position, The Following Equipment Either On The Foundation Or On Roof At ~ 3 To 4 M Above Ground Level. Contractors Scope Includes Supply Of All Material And Accessories Including But Not Limited To Any Fixtures, Clamps, Gasket, Nut Bolts, Etc.. Scope Also Includes Supply Of All Lifting Tools / Necessary Accessories And Hiring Of Cranes For Same. , 45% On Installation In Position. , 30% After Initial Alignment, Levelling And Grouting , 15% After Final Alignment And Making Ready For Commissioning , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling Including Lifting And Transportation Of Dispenser Frame From Clients Store Within City To Cng Stations And Erection At + Ground Level , 90% On Completion Of All Activities On Pro-Rata Basis As Certified In Running Bills , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Fire Fighting Equipments , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Manufacture, Assembly,Testing & Supply As Well As Installation, Testing And Commissioning Of Lcv Filling Post Consisting Of The Following.-4 Pressure Gauge For Pressure Monitoring Of Cng,-1/2 Id Conductive Core Thermoplastic Hose Of 5.0M Length For Cng Service With Break Away Coupling Along With Quick Connect Body & Stem (End Connection:½ Tube Od For Stem & ½Npt (F) For Body, Material : Ss316; Rated Pressure : 5000 Psi @ 70°F Temperature: 0°F To 400°F) .One End Of The Hose Shall Be 1/4 Npt(M) And Other End Of The Hose Shall Be 3/4 Od.Supply And Assembling Of All Necessary Fittings With The Hose For Making The End Conncetions As Indicated Above Are In The Scope Of Contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½ Od End Connection And ¼ Npt (F) Bottom End Connection-2-Way Floating Normal Bore Ball Valve ¾-Necessary Ss Tubing Of Sizes 3/4Od And 1/2Od, Tube Fittings-Vent Tube-Required Structural Frame And Tube Supports Shall Be Payable Through Structural Sor , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order.

BOQ

Sl. No. Item TitleItem Description
1Design, engineering, manufacture, shop testing, supply including packing and forwarding, transportation, delivery at storage and from storage to site of power distribution board (PDB) :Design, engineering, manufacture, shop testing, supply including packing and forwarding, transportation, delivery at storage and from storage to site of power distribution board (PDB) :
2415 V, 36 KA single front type indoor PDB to receive input power consisting of bus bar chamber, cable alley,outgoing with Fuse complete with wiring, indication lamp, ammeter, voltmeter, MFM (Multi Function Meter) etc including all labour and materials with operating mechanism, all accessories, mandatory spares as per data sheet, auxiliaries with FLP LCS(Local Control switch) for tripping the main incomer of PDB etc complete in all respects as specified in technical specification, data sheet & SLD & as per standard Specification.Single In-comer of 125 Amp (with Single phase preventer) 4P MCCB (with Micro processor and based O/C,S/C & E/F RELASE with LSIG & Shunt trip) along with VMR.Outgoing with 01 no. 80 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for Booster Compressor.Outgoing with 01 no. 63 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for APFC panel.Outgoing with 02 nos. 32 Amp TPN MCCB (with TM based O/C, S/C & E/F RELASE) for UPS and Static Bypass.Outgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB with Timer(24Hrs) Auto/MannualOutgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB without Timer415 V, 36 KA single front type indoor PDB to receive input power consisting of bus bar chamber, cable alley,outgoing with Fuse complete with wiring, indication lamp, ammeter, voltmeter, MFM (Multi Function Meter) etc including all labour and materials with operating mechanism, all accessories, mandatory spares as per data sheet, auxiliaries with FLP LCS(Local Control switch) for tripping the main incomer of PDB etc complete in all respects as specified in technical specification, data sheet & SLD & as per standard Specification.Single In-comer of 125 Amp (with Single phase preventer) 4P MCCB (with Micro processor and based O/C,S/C & E/F RELASE with LSIG & Shunt trip) along with VMR.Outgoing with 01 no. 80 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for Booster Compressor.Outgoing with 01 no. 63 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for APFC panel.Outgoing with 02 nos. 32 Amp TPN MCCB (with TM based O/C, S/C & E/F RELASE) for UPS and Static Bypass.Outgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB with Timer(24Hrs) Auto/MannualOutgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB without Timer
35% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
485% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
510% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
6Floor mounted APFC Panel of 10KVAR capacitor bank in steps of 4x2.5 KVAR capacitors consisting of bus bar chamber, cable alley incoming (FSU), outgoing feeder (FSUs) as specified in tender specificationFloor mounted APFC Panel of 10KVAR capacitor bank in steps of 4x2.5 KVAR capacitors consisting of bus bar chamber, cable alley incoming (FSU), outgoing feeder (FSUs) as specified in tender specification
75% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
885% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
910% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
10Outdoor type dust & weather proof sheet steel (2 mm thick) enclosed MCCB of following rating for mounting on wall or pedestal. 125A, 415V, 4 Pole, AC-23 duty and suitable for termination of 3.5 x 95/50 sq.mm A2XFY cable on incomer terminals and outgoing terminals, with RYB indication.Outdoor type dust & weather proof sheet steel (2 mm thick) enclosed MCCB of following rating for mounting on wall or pedestal. 125A, 415V, 4 Pole, AC-23 duty and suitable for termination of 3.5 x 95/50 sq.mm A2XFY cable on incomer terminals and outgoing terminals, with RYB indication.
115% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
1285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
1310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
14Supply including packing and forwarding, transportation, delivery at storage of lighting fixtures complete with mounting bracket, flame proof/non flame proof, control gear box/ Junction Box ,glands ,lugs as per the type of fixture, lamps etc. including civil work with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects.Supply including packing and forwarding, transportation, delivery at storage of lighting fixtures complete with mounting bracket, flame proof/non flame proof, control gear box/ Junction Box ,glands ,lugs as per the type of fixture, lamps etc. including civil work with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects.
155% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
1685% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
1710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
185% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
1985% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
2010% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
21Design, engineering, supply including packing and forwarding, transportation, delivery at storage, of the complete earthing and lightning protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material (Like Bitumen coating) and labour as per specification and drawings approved by the company in with IS 3043.Design, engineering, supply including packing and forwarding, transportation, delivery at storage, of the complete earthing and lightning protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material (Like Bitumen coating) and labour as per specification and drawings approved by the company in with IS 3043.
225% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
2385% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
2410% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
255% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
2685% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
2710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
285% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
2985% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
3010% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
315% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
3285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
3310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
345% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
3585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
3610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
37Design, engineering,supply including packing and forwarding, transportation, delivery at storage, of the 1.1kV grade XLPE insulated, PVC sheathed, FRLS power and control cables (conforming to IS:7098 and specification) including Cable glands & Lugs etc.of following sizes in trenches/ excavated under ground trench /trays, pulling through pipes and its proper sealing, cutting of paved area, roads etc.Design, engineering,supply including packing and forwarding, transportation, delivery at storage, of the 1.1kV grade XLPE insulated, PVC sheathed, FRLS power and control cables (conforming to IS:7098 and specification) including Cable glands & Lugs etc.of following sizes in trenches/ excavated under ground trench /trays, pulling through pipes and its proper sealing, cutting of paved area, roads etc.
385% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
3985% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
4010% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
415% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
4285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
4310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
445% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
4585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
4610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
47Supply of following including necessary clamp, bolts, rawl plugs etc.Supply of following including necessary clamp, bolts, rawl plugs etc.
485% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
4985% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
5010% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
515% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
5285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
5310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
545% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
5585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
5610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
57Installation, Testing and Commissioning including packing and forwarding, transportation, delivery at Storage Oflighting fixtures complete with mounting bracket, flame proofinon flame proof, control gear box/ Junction Box, glands , lugs as the type Of fixture, lamps etc. including civil work With pipe inserts for cables andconnecting work, With all material and labour as specifications, drawings and instruction ofEngineer-in-charge. Work to be completed in all respects.Installation, Testing and Commissioning including packing and forwarding, transportation, delivery at Storage Oflighting fixtures complete with mounting bracket, flame proofinon flame proof, control gear box/ Junction Box, glands , lugs as the type Of fixture, lamps etc. including civil work With pipe inserts for cables andconnecting work, With all material and labour as specifications, drawings and instruction ofEngineer-in-charge. Work to be completed in all respects.
5880% on completion of installation.80% on completion of installation.
5910% on testin10% on testin
6010% On completion Of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% On completion Of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
61Laying of SS Tubes with PVC tube clamp, Hydro testing at 375 bar and commissioning of SS tubes along with fittings, hose, mass flow meter and valves as given below and as per Technical Specification and scope of work including handling, lifting, transportation from stores to location of CNG stations.Laying of SS Tubes with PVC tube clamp, Hydro testing at 375 bar and commissioning of SS tubes along with fittings, hose, mass flow meter and valves as given below and as per Technical Specification and scope of work including handling, lifting, transportation from stores to location of CNG stations.
6270% on erection and alignment complete70% on erection and alignment complete
6320% on completion of all testing20% on completion of all testing
6410% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
6570% on erection and alignment complete70% on erection and alignment complete
6620% on completion of all testing20% on completion of all testing
6710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
68Supply of SS Tubes as per Technical SpecificationSupply of SS Tubes as per Technical Specification
695% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
7085% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
7110% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
725% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
7385% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
7410% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
75Supply of SS FittingsSupply of SS Fittings
765% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
7785% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
7810% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
795% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
8085% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
8110% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
82Reducing UnionReducing Union
835% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
8485% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
8510% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
865% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
8785% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
8810% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
89Equal TeeEqual Tee
905% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
9185% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
9210% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
93NutNut
945% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
9585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
9610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
975% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
9885% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
9910% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
100Back FerruleBack Ferrule
1015% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
10285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
10310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1045% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
10585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
10610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
107PlugPlug
1085% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
10985% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
11010% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1115% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
11285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
11310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
114CapCap
1155% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
11685% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
11710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
118Quick Connect Body & StemQuick Connect Body & Stem
1195% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
12085% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
12110% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
122Reducing Union TeeReducing Union Tee
1235% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
12485% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
12510% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
126Male ConnectorMale Connector
1275% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
12885% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
12910% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
130Supply of SS Ball Valves conforming to Technical Specification for SS Ball Valves of following sizes, specifications as indicated below :Supply of SS Ball Valves conforming to Technical Specification for SS Ball Valves of following sizes, specifications as indicated below :
1315% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
13285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
13310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1345% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
13585% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
13610% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1375% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
13885% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
13910% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
140SUPPLY OF HIGH PRESSURE CNG HOSE ASSEMBLY (CONDUCTIVE CORE THERMOPLASTIC HOSE ASSEMBLY)SUPPLY OF HIGH PRESSURE CNG HOSE ASSEMBLY (CONDUCTIVE CORE THERMOPLASTIC HOSE ASSEMBLY)
1415% on placement of order on sub-vendor.5% on placement of order on sub-vendor.
14285% on receipt of material at site and acceptance thereof85% on receipt of material at site and acceptance thereof
14310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
144Handling (including lifting and transportation from Client's store within GA to CNG stations) and erecting in position, the following equipment either on the foundation or on roof at ~ 3 to 4 m above ground level. Contractor's scope includes supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.. Scope also includes supply of all lifting tools / necessary accessories and hiring of cranes for same.Handling (including lifting and transportation from Client's store within GA to CNG stations) and erecting in position, the following equipment either on the foundation or on roof at ~ 3 to 4 m above ground level. Contractor's scope includes supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.. Scope also includes supply of all lifting tools / necessary accessories and hiring of cranes for same.
14545% on installation in position.45% on installation in position.
14630% after initial alignment, levelling and grouting30% after initial alignment, levelling and grouting
14715% after final alignment and making ready for commissioning15% after final alignment and making ready for commissioning
14810% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
149Handling including lifting and transportation of dispenser frame from Client's store within city to CNG stations and Erection at + Ground LevelHandling including lifting and transportation of dispenser frame from Client's store within city to CNG stations and Erection at + Ground Level
15090% on completion of all activities on pro-rata basis as certified in running bills90% on completion of all activities on pro-rata basis as certified in running bills
15110% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
152Fire fighting EquipmentsFire fighting Equipments
1535% on placement of order on sub vendor.5% on placement of order on sub vendor.
15465% on receipt of material at site and acceptance thereof.65% on receipt of material at site and acceptance thereof.
15515% on erection, alignment, grouting, painting etc.15% on erection, alignment, grouting, painting etc.
1565% on testing5% on testing
15710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1585% on placement of order on sub vendor.5% on placement of order on sub vendor.
15965% on receipt of material at site and acceptance thereof.65% on receipt of material at site and acceptance thereof.
16015% on erection, alignment, grouting, painting etc.15% on erection, alignment, grouting, painting etc.
1615% on testing5% on testing
16210% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
1635% on placement of order on sub vendor.5% on placement of order on sub vendor.
16465% on receipt of material at site and acceptance thereof.65% on receipt of material at site and acceptance thereof.
16515% on erection, alignment, grouting, painting etc.15% on erection, alignment, grouting, painting etc.
1665% on testing5% on testing
16710% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.
168Design, manufacture, assembly,testing & supply as well as installation, testing and commissioning of LCV Filling post consisting of the following.-4” Pressure Gauge for pressure monitoring of CNG,-1/2” ID Conductive Core Thermoplastic Hose of 5.0m length for CNG Service with break away coupling along with Quick connect body & stem (End connection:½\\" Tube OD for stem & ½”NPT (F) for body, Material : SS316; Rated pressure : 5000 PSI @ 70°F Temperature: 0°F to 400°F) .One end of the hose shall be 1/4\\" NPT(M) and other end of the hose shall be 3/4\\" OD.Supply and assembling of all necessary fittings with the hose for making the end conncetions as indicated above are in the scope of contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½\\" OD end Connection and ¼” NPT (F) bottom end connection-2-Way Floating Normal Bore Ball Valve ¾\\"-Necessary SS tubing of sizes 3/4\\"OD and 1/2\\"OD, tube fittings-Vent tube-Required Structural frame and tube supports shall be payable through Structural SORDesign, manufacture, assembly,testing & supply as well as installation, testing and commissioning of LCV Filling post consisting of the following.-4” Pressure Gauge for pressure monitoring of CNG,-1/2” ID Conductive Core Thermoplastic Hose of 5.0m length for CNG Service with break away coupling along with Quick connect body & stem (End connection:½\\" Tube OD for stem & ½”NPT (F) for body, Material : SS316; Rated pressure : 5000 PSI @ 70°F Temperature: 0°F to 400°F) .One end of the hose shall be 1/4\\" NPT(M) and other end of the hose shall be 3/4\\" OD.Supply and assembling of all necessary fittings with the hose for making the end conncetions as indicated above are in the scope of contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½\\" OD end Connection and ¼” NPT (F) bottom end connection-2-Way Floating Normal Bore Ball Valve ¾\\"-Necessary SS tubing of sizes 3/4\\"OD and 1/2\\"OD, tube fittings-Vent tube-Required Structural frame and tube supports shall be payable through Structural SOR
1695% on placement of order on sub vendor.5% on placement of order on sub vendor.
17065% on receipt of material at site and acceptance thereof.65% on receipt of material at site and acceptance thereof.
17115% on erection, alignment, grouting, painting etc.15% on erection, alignment, grouting, painting etc.
1725% on testing5% on testing
17310% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order.

AI Tender Summary

OUR REF NO 58349870
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 24-11-2026
Authority
Authority Name Haridwar Natural Gas Private Limited
Work Description Bids Are invited for Custom Bid For Services - Hiring Any Agency For Composite Works At Cng Station In Roorkee - Design, Engineering, Manufacture, Shop Testing, Supply Including Packing And Forwarding, Transportation, Delivery At Storage And From Storage To Site Of Power Distribution Board (Pdb) : , 415 V, 36 Ka Single Front Type Indoor Pdb To Receive Input Power Consisting Of Bus Bar Chamber, Cable Alley,Outgoing With Fuse Complete With Wiring, Indication Lamp, Ammeter, Voltmeter, Mfm (Multi Function Meter) Etc Including All Labour And Materials With Operating Mechanism, All Accessories, Mandatory Spares As Per Data Sheet, Auxiliaries With Flp Lcs(Local Control Switch) For Tripping The Main Incomer Of Pdb Etc Complete In All Respects As Specified In Technical Specification, Data Sheet & Sld & As Per Standard Specification.Single In-Comer Of 125 (With Single Phase Preventer) 4P Mccb (With Micro Processor And Based O/C,S/C & E/F Relase With Lsig & Shunt Trip) Along With Vmr.Outgoing With 01 No. 80 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Booster Compressor.Outgoing With 01 No. 63 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Apfc Panel.Outgoing With 02 Nos. 32 Tpn Mccb (With Tm Based O/C, S/C & E/F Relase) For Ups And Static Bypass.Outgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb With Timer(24Hrs) Auto/Mannualoutgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb Without Timer , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Floor Mounted Apfc Panel Of 10Kvar Capacitor Bank In Steps Of 4X2.5 Kvar Capacitors Consisting Of Bus Bar Chamber, Cable Alley Incoming (Fsu), Outgoing Feeder (Fsus) As Specified In Tender Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Outdoor Type Dust & Weather Proof Sheet Steel (2 Mm Thick) Enclosed Mccb Of Following Rating For Mounting On Wall Or Pedestal. 125A, 415V, 4 Pole, Ac-23 Duty And Suitable For Termination Of 3.5 X 95/50 Sq.Mm A2xfy Cable On Incomer Terminals And Outgoing Terminals, With Ryb Indication. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Including Packing And Forwarding, Transportation, Delivery At Storage Of Lighting Fixtures Complete With Mounting Bracket, Flame Proof/Non Flame Proof, Control Gear Box/ Junction Box ,Glands ,Lugs As Per The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables And Connecting Work, With All Material And Labour As Per Specifications, Drawings And Instruction Of Engineer-In-Charge. Work To Be Completed In All Respects. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering, Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The Complete Earthing And Lightning Protection System, Earth Electrodes/ Pit, Earth Main Ring, Earthing Of Electrical Equipments, Instrument Panels, Field Instruments, Process Equipments And Pipes/ Flanges Including All Associated Civil Work With All Material (Like Bitumen Coating) And Labour As Per Specification And Drawings Approved By The Company In With Is 3043. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering,Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The 1.1Kv Grade Xlpe Insulated, Pvc Sheathed, Frls Power And Control Cables (Conforming To Is:7098 And Specification) Including Cable Glands & Lugs Etc.Of Following Sizes In Trenches/ Excavated Under Ground Trench /Trays, Pulling Through Pipes And Its Proper Sealing, Cutting Of Paved Area, Roads Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Following Including Necessary Clamp, Bolts, Rawl Plugs Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Installation, Testing And Commissioning Including Packing And Forwarding, Transportation, Delivery At Storage Oflighting Fixtures Complete With Mounting Bracket, Flame Proofinon Flame Proof, Control Gear Box/ Junction Box, Glands , Lugs As The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables Andconnecting Work, With All Material And Labour As Specifications, Drawings And Instruction Ofengineer-In-Charge. Work To Be Completed In All Respects. , 80% On Completion Of Installation. , 10% On Testin , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Laying Of Ss Tubes With Pvc Tube Clamp, Hydro Testing At 375 Bar And Commissioning Of Ss Tubes Along With Fittings, Hose, Mass Flow Meter And Valves As Given Below And As Per Technical Specification And Scope Of Work Including Handling, Lifting, Transportation From Stores To Location Of Cng Stations. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Tubes As Per Technical Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Fittings , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Equal Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Nut , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Back Ferrule , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Plug , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Cap , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Quick Connect Body & Stem , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Male Connector , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Ball Valves Conforming To Technical Specification For Ss Ball Valves Of Following Sizes, Specifications As Indicated Below : , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of High Pressure Cng Hose Assembly (Conductive Core Thermoplastic Hose Assembly) , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling (Including Lifting And Transportation From Clients Store Within Ga To Cng Stations) And Erecting In Position, The Following Equipment Either On The Foundation Or On Roof At ~ 3 To 4 M Above Ground Level. Contractors Scope Includes Supply Of All Material And Accessories Including But Not Limited To Any Fixtures, Clamps, Gasket, Nut Bolts, Etc.. Scope Also Includes Supply Of All Lifting Tools / Necessary Accessories And Hiring Of Cranes For Same. , 45% On Installation In Position. , 30% After Initial Alignment, Levelling And Grouting , 15% After Final Alignment And Making Ready For Commissioning , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling Including Lifting And Transportation Of Dispenser Frame From Clients Store Within City To Cng Stations And Erection At + Ground Level , 90% On Completion Of All Activities On Pro-Rata Basis As Certified In Running Bills , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Fire Fighting Equipments , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Manufacture, Assembly,Testing & Supply As Well As Installation, Testing And Commissioning Of Lcv Filling Post Consisting Of The Following.-4 Pressure Gauge For Pressure Monitoring Of Cng,-1/2 Id Conductive Core Thermoplastic Hose Of 5.0M Length For Cng Service With Break Away Coupling Along With Quick Connect Body & Stem (End Connection:½ Tube Od For Stem & ½Npt (F) For Body, Material : Ss316; Rated Pressure : 5000 Psi @ 70°F Temperature: 0°F To 400°F) .One End Of The Hose Shall Be 1/4 Npt(M) And Other End Of The Hose Shall Be 3/4 Od.Supply And Assembling Of All Necessary Fittings With The Hose For Making The End Conncetions As Indicated Above Are In The Scope Of Contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½ Od End Connection And ¼ Npt (F) Bottom End Connection-2-Way Floating Normal Bore Ball Valve ¾-Necessary Ss Tubing Of Sizes 3/4Od And 1/2Od, Tube Fittings-Vent Tube-Required Structural Frame And Tube Supports Shall Be Payable Through Structural Sor , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order.
Basic Detail
Tender No GEM/2026/B/8232142
Bidding Type Tender
Location
City Haridwar
State Uttarakhand
Key Dates
Publish Date 03 Nov 2026
Submission Date 24 Nov 2026
Open Date 25 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.19 Lakhs
Exemption Not Available
Document List
d89aa472-dd2d-436f-a614-5cb30e407acf.pdf
1793683920.xlsx
1793683930.pdf
1793683934.pdf
1793683940.pdf
1793683947.pdf
1793683955.pdf
1793683959.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Nov 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

d89aa472-dd2d-436f-a614-5cb30e407acf.pdf

xlsx

1793683920.xlsx

pdf

1793683930.pdf

pdf

1793683934.pdf

pdf

1793683940.pdf

pdf

1793683947.pdf

pdf

1793683955.pdf

pdf

1793683959.pdf