Bids Are invited for Custom Bid For Services - Hiring Any Agency For Composite Works At Cng Station In Roorkee - Design, Engineering, Manufacture, Shop Testing, Supply Including Packing And Forwarding, Transportation, Delivery At Storage And From Sto
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Hiring Any Agency For Composite Works At Cng Station In Roorkee - Design, Engineering, Manufacture, Shop Testing, Supply Including Packing And Forwarding, Transportation, Delivery At Storage And From Storage To Site Of Power Distribution Board (Pdb) : , 415 V, 36 Ka Single Front Type Indoor Pdb To Receive Input Power Consisting Of Bus Bar Chamber, Cable Alley,Outgoing With Fuse Complete With Wiring, Indication Lamp, Ammeter, Voltmeter, Mfm (Multi Function Meter) Etc Including All Labour And Materials With Operating Mechanism, All Accessories, Mandatory Spares As Per Data Sheet, Auxiliaries With Flp Lcs(Local Control Switch) For Tripping The Main Incomer Of Pdb Etc Complete In All Respects As Specified In Technical Specification, Data Sheet & Sld & As Per Standard Specification.Single In-Comer Of 125 (With Single Phase Preventer) 4P Mccb (With Micro Processor And Based O/C,S/C & E/F Relase With Lsig & Shunt Trip) Along With Vmr.Outgoing With 01 No. 80 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Booster Compressor.Outgoing With 01 No. 63 Tpn Mccb (With Tm Based O/C,S/C & E/F Relase) For Apfc Panel.Outgoing With 02 Nos. 32 Tpn Mccb (With Tm Based O/C, S/C & E/F Relase) For Ups And Static Bypass.Outgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb With Timer(24Hrs) Auto/Mannualoutgoing With 3 No. 40A Fuse And 3 Nos. 10A Dp Mcb Without Timer , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Floor Mounted Apfc Panel Of 10Kvar Capacitor Bank In Steps Of 4X2.5 Kvar Capacitors Consisting Of Bus Bar Chamber, Cable Alley Incoming (Fsu), Outgoing Feeder (Fsus) As Specified In Tender Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Outdoor Type Dust & Weather Proof Sheet Steel (2 Mm Thick) Enclosed Mccb Of Following Rating For Mounting On Wall Or Pedestal. 125A, 415V, 4 Pole, Ac-23 Duty And Suitable For Termination Of 3.5 X 95/50 Sq.Mm A2xfy Cable On Incomer Terminals And Outgoing Terminals, With Ryb Indication. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Including Packing And Forwarding, Transportation, Delivery At Storage Of Lighting Fixtures Complete With Mounting Bracket, Flame Proof/Non Flame Proof, Control Gear Box/ Junction Box ,Glands ,Lugs As Per The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables And Connecting Work, With All Material And Labour As Per Specifications, Drawings And Instruction Of Engineer-In-Charge. Work To Be Completed In All Respects. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering, Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The Complete Earthing And Lightning Protection System, Earth Electrodes/ Pit, Earth Main Ring, Earthing Of Electrical Equipments, Instrument Panels, Field Instruments, Process Equipments And Pipes/ Flanges Including All Associated Civil Work With All Material (Like Bitumen Coating) And Labour As Per Specification And Drawings Approved By The Company In With Is 3043. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Engineering,Supply Including Packing And Forwarding, Transportation, Delivery At Storage, Of The 1.1Kv Grade Xlpe Insulated, Pvc Sheathed, Frls Power And Control Cables (Conforming To Is:7098 And Specification) Including Cable Glands & Lugs Etc.Of Following Sizes In Trenches/ Excavated Under Ground Trench /Trays, Pulling Through Pipes And Its Proper Sealing, Cutting Of Paved Area, Roads Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Following Including Necessary Clamp, Bolts, Rawl Plugs Etc. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Installation, Testing And Commissioning Including Packing And Forwarding, Transportation, Delivery At Storage Oflighting Fixtures Complete With Mounting Bracket, Flame Proofinon Flame Proof, Control Gear Box/ Junction Box, Glands , Lugs As The Type Of Fixture, Lamps Etc. Including Civil Work With Pipe Inserts For Cables Andconnecting Work, With All Material And Labour As Specifications, Drawings And Instruction Ofengineer-In-Charge. Work To Be Completed In All Respects. , 80% On Completion Of Installation. , 10% On Testin , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Laying Of Ss Tubes With Pvc Tube Clamp, Hydro Testing At 375 Bar And Commissioning Of Ss Tubes Along With Fittings, Hose, Mass Flow Meter And Valves As Given Below And As Per Technical Specification And Scope Of Work Including Handling, Lifting, Transportation From Stores To Location Of Cng Stations. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 70% On Erection And Alignment Complete , 20% On Completion Of All Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Tubes As Per Technical Specification , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Fittings , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Equal Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Nut , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Back Ferrule , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Plug , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Cap , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Quick Connect Body & Stem , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Reducing Union Tee , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Male Connector , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of Ss Ball Valves Conforming To Technical Specification For Ss Ball Valves Of Following Sizes, Specifications As Indicated Below : , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Supply Of High Pressure Cng Hose Assembly (Conductive Core Thermoplastic Hose Assembly) , 5% On Placement Of Order On Sub-Vendor. , 85% On Receipt Of Material At Site And Acceptance Thereof , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling (Including Lifting And Transportation From Clients Store Within Ga To Cng Stations) And Erecting In Position, The Following Equipment Either On The Foundation Or On Roof At ~ 3 To 4 M Above Ground Level. Contractors Scope Includes Supply Of All Material And Accessories Including But Not Limited To Any Fixtures, Clamps, Gasket, Nut Bolts, Etc.. Scope Also Includes Supply Of All Lifting Tools / Necessary Accessories And Hiring Of Cranes For Same. , 45% On Installation In Position. , 30% After Initial Alignment, Levelling And Grouting , 15% After Final Alignment And Making Ready For Commissioning , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Handling Including Lifting And Transportation Of Dispenser Frame From Clients Store Within City To Cng Stations And Erection At + Ground Level , 90% On Completion Of All Activities On Pro-Rata Basis As Certified In Running Bills , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Fire Fighting Equipments , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order. , Design, Manufacture, Assembly,Testing & Supply As Well As Installation, Testing And Commissioning Of Lcv Filling Post Consisting Of The Following.-4 Pressure Gauge For Pressure Monitoring Of Cng,-1/2 Id Conductive Core Thermoplastic Hose Of 5.0M Length For Cng Service With Break Away Coupling Along With Quick Connect Body & Stem (End Connection:½ Tube Od For Stem & ½Npt (F) For Body, Material : Ss316; Rated Pressure : 5000 Psi @ 70°F Temperature: 0°F To 400°F) .One End Of The Hose Shall Be 1/4 Npt(M) And Other End Of The Hose Shall Be 3/4 Od.Supply And Assembling Of All Necessary Fittings With The Hose For Making The End Conncetions As Indicated Above Are In The Scope Of Contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½ Od End Connection And ¼ Npt (F) Bottom End Connection-2-Way Floating Normal Bore Ball Valve ¾-Necessary Ss Tubing Of Sizes 3/4Od And 1/2Od, Tube Fittings-Vent Tube-Required Structural Frame And Tube Supports Shall Be Payable Through Structural Sor , 5% On Placement Of Order On Sub Vendor. , 65% On Receipt Of Material At Site And Acceptance Thereof. , 15% On Erection, Alignment, Grouting, Painting Etc. , 5% On Testing , 10% On Completion Of All Activities And Their Acceptance. Submission Of Final Documents, Final Bill And Acceptance Of These By Owner Thereafter For Successful Closure Of Work Order.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Design, engineering, manufacture, shop testing, supply including packing and forwarding, transportation, delivery at storage and from storage to site of power distribution board (PDB) : | Design, engineering, manufacture, shop testing, supply including packing and forwarding, transportation, delivery at storage and from storage to site of power distribution board (PDB) : |
| 2 | 415 V, 36 KA single front type indoor PDB to receive input power consisting of bus bar chamber, cable alley,outgoing with Fuse complete with wiring, indication lamp, ammeter, voltmeter, MFM (Multi Function Meter) etc including all labour and materials with operating mechanism, all accessories, mandatory spares as per data sheet, auxiliaries with FLP LCS(Local Control switch) for tripping the main incomer of PDB etc complete in all respects as specified in technical specification, data sheet & SLD & as per standard Specification.Single In-comer of 125 Amp (with Single phase preventer) 4P MCCB (with Micro processor and based O/C,S/C & E/F RELASE with LSIG & Shunt trip) along with VMR.Outgoing with 01 no. 80 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for Booster Compressor.Outgoing with 01 no. 63 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for APFC panel.Outgoing with 02 nos. 32 Amp TPN MCCB (with TM based O/C, S/C & E/F RELASE) for UPS and Static Bypass.Outgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB with Timer(24Hrs) Auto/MannualOutgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB without Timer | 415 V, 36 KA single front type indoor PDB to receive input power consisting of bus bar chamber, cable alley,outgoing with Fuse complete with wiring, indication lamp, ammeter, voltmeter, MFM (Multi Function Meter) etc including all labour and materials with operating mechanism, all accessories, mandatory spares as per data sheet, auxiliaries with FLP LCS(Local Control switch) for tripping the main incomer of PDB etc complete in all respects as specified in technical specification, data sheet & SLD & as per standard Specification.Single In-comer of 125 Amp (with Single phase preventer) 4P MCCB (with Micro processor and based O/C,S/C & E/F RELASE with LSIG & Shunt trip) along with VMR.Outgoing with 01 no. 80 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for Booster Compressor.Outgoing with 01 no. 63 Amp TPN MCCB (with TM based O/C,S/C & E/F RELASE) for APFC panel.Outgoing with 02 nos. 32 Amp TPN MCCB (with TM based O/C, S/C & E/F RELASE) for UPS and Static Bypass.Outgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB with Timer(24Hrs) Auto/MannualOutgoing with 3 no. 40A Fuse and 3 nos. 10A DP MCB without Timer |
| 3 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 4 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 5 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 6 | Floor mounted APFC Panel of 10KVAR capacitor bank in steps of 4x2.5 KVAR capacitors consisting of bus bar chamber, cable alley incoming (FSU), outgoing feeder (FSUs) as specified in tender specification | Floor mounted APFC Panel of 10KVAR capacitor bank in steps of 4x2.5 KVAR capacitors consisting of bus bar chamber, cable alley incoming (FSU), outgoing feeder (FSUs) as specified in tender specification |
| 7 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 8 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 9 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 10 | Outdoor type dust & weather proof sheet steel (2 mm thick) enclosed MCCB of following rating for mounting on wall or pedestal. 125A, 415V, 4 Pole, AC-23 duty and suitable for termination of 3.5 x 95/50 sq.mm A2XFY cable on incomer terminals and outgoing terminals, with RYB indication. | Outdoor type dust & weather proof sheet steel (2 mm thick) enclosed MCCB of following rating for mounting on wall or pedestal. 125A, 415V, 4 Pole, AC-23 duty and suitable for termination of 3.5 x 95/50 sq.mm A2XFY cable on incomer terminals and outgoing terminals, with RYB indication. |
| 11 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 12 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 13 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 14 | Supply including packing and forwarding, transportation, delivery at storage of lighting fixtures complete with mounting bracket, flame proof/non flame proof, control gear box/ Junction Box ,glands ,lugs as per the type of fixture, lamps etc. including civil work with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects. | Supply including packing and forwarding, transportation, delivery at storage of lighting fixtures complete with mounting bracket, flame proof/non flame proof, control gear box/ Junction Box ,glands ,lugs as per the type of fixture, lamps etc. including civil work with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of Engineer-in-charge. Work to be completed in all respects. |
| 15 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 16 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 17 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 18 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 19 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 20 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 21 | Design, engineering, supply including packing and forwarding, transportation, delivery at storage, of the complete earthing and lightning protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material (Like Bitumen coating) and labour as per specification and drawings approved by the company in with IS 3043. | Design, engineering, supply including packing and forwarding, transportation, delivery at storage, of the complete earthing and lightning protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material (Like Bitumen coating) and labour as per specification and drawings approved by the company in with IS 3043. |
| 22 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 23 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 24 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 25 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 26 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 27 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 28 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 29 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 30 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 31 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 32 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 33 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 34 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 35 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 36 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 37 | Design, engineering,supply including packing and forwarding, transportation, delivery at storage, of the 1.1kV grade XLPE insulated, PVC sheathed, FRLS power and control cables (conforming to IS:7098 and specification) including Cable glands & Lugs etc.of following sizes in trenches/ excavated under ground trench /trays, pulling through pipes and its proper sealing, cutting of paved area, roads etc. | Design, engineering,supply including packing and forwarding, transportation, delivery at storage, of the 1.1kV grade XLPE insulated, PVC sheathed, FRLS power and control cables (conforming to IS:7098 and specification) including Cable glands & Lugs etc.of following sizes in trenches/ excavated under ground trench /trays, pulling through pipes and its proper sealing, cutting of paved area, roads etc. |
| 38 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 39 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 40 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 41 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 42 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 43 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 44 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 45 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 46 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 47 | Supply of following including necessary clamp, bolts, rawl plugs etc. | Supply of following including necessary clamp, bolts, rawl plugs etc. |
| 48 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 49 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 50 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 51 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 52 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 53 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 54 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 55 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 56 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 57 | Installation, Testing and Commissioning including packing and forwarding, transportation, delivery at Storage Oflighting fixtures complete with mounting bracket, flame proofinon flame proof, control gear box/ Junction Box, glands , lugs as the type Of fixture, lamps etc. including civil work With pipe inserts for cables andconnecting work, With all material and labour as specifications, drawings and instruction ofEngineer-in-charge. Work to be completed in all respects. | Installation, Testing and Commissioning including packing and forwarding, transportation, delivery at Storage Oflighting fixtures complete with mounting bracket, flame proofinon flame proof, control gear box/ Junction Box, glands , lugs as the type Of fixture, lamps etc. including civil work With pipe inserts for cables andconnecting work, With all material and labour as specifications, drawings and instruction ofEngineer-in-charge. Work to be completed in all respects. |
| 58 | 80% on completion of installation. | 80% on completion of installation. |
| 59 | 10% on testin | 10% on testin |
| 60 | 10% On completion Of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% On completion Of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 61 | Laying of SS Tubes with PVC tube clamp, Hydro testing at 375 bar and commissioning of SS tubes along with fittings, hose, mass flow meter and valves as given below and as per Technical Specification and scope of work including handling, lifting, transportation from stores to location of CNG stations. | Laying of SS Tubes with PVC tube clamp, Hydro testing at 375 bar and commissioning of SS tubes along with fittings, hose, mass flow meter and valves as given below and as per Technical Specification and scope of work including handling, lifting, transportation from stores to location of CNG stations. |
| 62 | 70% on erection and alignment complete | 70% on erection and alignment complete |
| 63 | 20% on completion of all testing | 20% on completion of all testing |
| 64 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 65 | 70% on erection and alignment complete | 70% on erection and alignment complete |
| 66 | 20% on completion of all testing | 20% on completion of all testing |
| 67 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 68 | Supply of SS Tubes as per Technical Specification | Supply of SS Tubes as per Technical Specification |
| 69 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 70 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 71 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 72 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 73 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 74 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 75 | Supply of SS Fittings | Supply of SS Fittings |
| 76 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 77 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 78 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 79 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 80 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 81 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 82 | Reducing Union | Reducing Union |
| 83 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 84 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 85 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 86 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 87 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 88 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 89 | Equal Tee | Equal Tee |
| 90 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 91 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 92 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 93 | Nut | Nut |
| 94 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 95 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 96 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 97 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 98 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 99 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 100 | Back Ferrule | Back Ferrule |
| 101 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 102 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 103 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 104 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 105 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 106 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 107 | Plug | Plug |
| 108 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 109 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 110 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 111 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 112 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 113 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 114 | Cap | Cap |
| 115 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 116 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 117 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 118 | Quick Connect Body & Stem | Quick Connect Body & Stem |
| 119 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 120 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 121 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 122 | Reducing Union Tee | Reducing Union Tee |
| 123 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 124 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 125 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 126 | Male Connector | Male Connector |
| 127 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 128 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 129 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 130 | Supply of SS Ball Valves conforming to Technical Specification for SS Ball Valves of following sizes, specifications as indicated below : | Supply of SS Ball Valves conforming to Technical Specification for SS Ball Valves of following sizes, specifications as indicated below : |
| 131 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 132 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 133 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 134 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 135 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 136 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 137 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 138 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 139 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 140 | SUPPLY OF HIGH PRESSURE CNG HOSE ASSEMBLY (CONDUCTIVE CORE THERMOPLASTIC HOSE ASSEMBLY) | SUPPLY OF HIGH PRESSURE CNG HOSE ASSEMBLY (CONDUCTIVE CORE THERMOPLASTIC HOSE ASSEMBLY) |
| 141 | 5% on placement of order on sub-vendor. | 5% on placement of order on sub-vendor. |
| 142 | 85% on receipt of material at site and acceptance thereof | 85% on receipt of material at site and acceptance thereof |
| 143 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 144 | Handling (including lifting and transportation from Client's store within GA to CNG stations) and erecting in position, the following equipment either on the foundation or on roof at ~ 3 to 4 m above ground level. Contractor's scope includes supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.. Scope also includes supply of all lifting tools / necessary accessories and hiring of cranes for same. | Handling (including lifting and transportation from Client's store within GA to CNG stations) and erecting in position, the following equipment either on the foundation or on roof at ~ 3 to 4 m above ground level. Contractor's scope includes supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.. Scope also includes supply of all lifting tools / necessary accessories and hiring of cranes for same. |
| 145 | 45% on installation in position. | 45% on installation in position. |
| 146 | 30% after initial alignment, levelling and grouting | 30% after initial alignment, levelling and grouting |
| 147 | 15% after final alignment and making ready for commissioning | 15% after final alignment and making ready for commissioning |
| 148 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 149 | Handling including lifting and transportation of dispenser frame from Client's store within city to CNG stations and Erection at + Ground Level | Handling including lifting and transportation of dispenser frame from Client's store within city to CNG stations and Erection at + Ground Level |
| 150 | 90% on completion of all activities on pro-rata basis as certified in running bills | 90% on completion of all activities on pro-rata basis as certified in running bills |
| 151 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 152 | Fire fighting Equipments | Fire fighting Equipments |
| 153 | 5% on placement of order on sub vendor. | 5% on placement of order on sub vendor. |
| 154 | 65% on receipt of material at site and acceptance thereof. | 65% on receipt of material at site and acceptance thereof. |
| 155 | 15% on erection, alignment, grouting, painting etc. | 15% on erection, alignment, grouting, painting etc. |
| 156 | 5% on testing | 5% on testing |
| 157 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 158 | 5% on placement of order on sub vendor. | 5% on placement of order on sub vendor. |
| 159 | 65% on receipt of material at site and acceptance thereof. | 65% on receipt of material at site and acceptance thereof. |
| 160 | 15% on erection, alignment, grouting, painting etc. | 15% on erection, alignment, grouting, painting etc. |
| 161 | 5% on testing | 5% on testing |
| 162 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 163 | 5% on placement of order on sub vendor. | 5% on placement of order on sub vendor. |
| 164 | 65% on receipt of material at site and acceptance thereof. | 65% on receipt of material at site and acceptance thereof. |
| 165 | 15% on erection, alignment, grouting, painting etc. | 15% on erection, alignment, grouting, painting etc. |
| 166 | 5% on testing | 5% on testing |
| 167 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 168 | Design, manufacture, assembly,testing & supply as well as installation, testing and commissioning of LCV Filling post consisting of the following.-4” Pressure Gauge for pressure monitoring of CNG,-1/2” ID Conductive Core Thermoplastic Hose of 5.0m length for CNG Service with break away coupling along with Quick connect body & stem (End connection:½\\" Tube OD for stem & ½”NPT (F) for body, Material : SS316; Rated pressure : 5000 PSI @ 70°F Temperature: 0°F to 400°F) .One end of the hose shall be 1/4\\" NPT(M) and other end of the hose shall be 3/4\\" OD.Supply and assembling of all necessary fittings with the hose for making the end conncetions as indicated above are in the scope of contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½\\" OD end Connection and ¼” NPT (F) bottom end connection-2-Way Floating Normal Bore Ball Valve ¾\\"-Necessary SS tubing of sizes 3/4\\"OD and 1/2\\"OD, tube fittings-Vent tube-Required Structural frame and tube supports shall be payable through Structural SOR | Design, manufacture, assembly,testing & supply as well as installation, testing and commissioning of LCV Filling post consisting of the following.-4” Pressure Gauge for pressure monitoring of CNG,-1/2” ID Conductive Core Thermoplastic Hose of 5.0m length for CNG Service with break away coupling along with Quick connect body & stem (End connection:½\\" Tube OD for stem & ½”NPT (F) for body, Material : SS316; Rated pressure : 5000 PSI @ 70°F Temperature: 0°F to 400°F) .One end of the hose shall be 1/4\\" NPT(M) and other end of the hose shall be 3/4\\" OD.Supply and assembling of all necessary fittings with the hose for making the end conncetions as indicated above are in the scope of contractor.-3-Way Trunnion Mounted, Reducer Bore Ball Valve ½\\" OD end Connection and ¼” NPT (F) bottom end connection-2-Way Floating Normal Bore Ball Valve ¾\\"-Necessary SS tubing of sizes 3/4\\"OD and 1/2\\"OD, tube fittings-Vent tube-Required Structural frame and tube supports shall be payable through Structural SOR |
| 169 | 5% on placement of order on sub vendor. | 5% on placement of order on sub vendor. |
| 170 | 65% on receipt of material at site and acceptance thereof. | 65% on receipt of material at site and acceptance thereof. |
| 171 | 15% on erection, alignment, grouting, painting etc. | 15% on erection, alignment, grouting, painting etc. |
| 172 | 5% on testing | 5% on testing |
| 173 | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. | 10% on completion of all activities and their acceptance. Submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender