Bids Are invited for Horticulture Service - Lumpsum Based - Upkeeping Maintenance And Development Of Lawn And Garden At Gokul Ocm Under Murpar Sub Area Of Umrer Area; General Maintenance Of Plant (Mowing, Strimming, Laying, Sweeping, Watering, Weedin
Tender Overview
Project Description
Bids Are invited for Horticulture Service - Lumpsum Based - Upkeeping Maintenance And Development Of Lawn And Garden At Gokul Ocm Under Murpar Sub Area Of Umrer Area; General Maintenance Of Plant (Mowing, Strimming, Laying, Sweeping, Watering, Weeding) - Up Keeing & Maintenance Of Lawn & Plants With Daily Watering, Sweeping, Brooming Applying Manure & Pesticides Whichever Is Required, Trimming Of Plants. Mowing Of Lawn, Uprooting Of Unwanted Vegetation, Shrubs Keeping The Area Neat & Clean & Disposal Of Waste Materials/Garbage And The Disposed Waste Materials To Be Leveled And Neaty Dressed Including The Cost Of Tools And Plants Plastic Flexible Pipes, Manure Etc. Required As Per Site Condition And Instruction Of Engineer Incharge. (By Engaging 01 Unskilled Manpower). , Providing & Laying Of Selection No. 1 Doob Grass Turf With Earth 50Mm To 60Mm Thickness Of Existing Ground Prepared With Proper Level And Ramming With Required Tools Wooden And Than Rolling The Surface With Light Roller Make The Surface Smoothen And Light Watering The Same And Maintenance For 30 Days Or More Till The Grass Establish Properly, As Per Direction Of The Officer-In-Charge. , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Upto 50 M And For All Lift, As Directed By Engineer-In-Charge. All Kinds Of Soil , Supplying And Filling In Plinth With Sand Under Floors, Including Watering, Ramming, Consolidating And Dressing Complete. , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level : 1:3:6 (1 Cement : 3 Coarse Sand (Zone-Iii) Derived From Natural Sources : 6 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources) , Providing And Laying 60Mm Thick Factory Made Cement Concrete Interlocking Paver Block Of M -30 Grade Made By Block Making Machine With Strong Vibratory Compaction, Of Approved Size, Design& Shape, Laid In Required Colour And Pattern Over And Including 50Mm Thick Compacted Bed Of Coarse Sand, Filling The Joints With Line Sand Etc. All Complete As Per The Direction Of Engineer-In-Charge , Brick Work With Common Burnt Clay Modular Bricks Of Class Designation 7.5 In Foundation And Plinth In: Cement Mortar 1:6 (1 Cement : 6 Coarse Sand). , 12 Mm Cement Plaster Of Mix : 1:4 (1 Cement: 4 Fine Sand) , Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade . New Work (Two Or More Coat Applied @ 1.67 Ltr/10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 0.90 Litre/10 Sqm
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Up keeing & Maintenance of Lawn & plants with daily watering, sweeping, brooming applying manure & pesticides whichever is required, trimming of plants. Mowing of Lawn, uprooting of unwanted vegetation, shrubs keeping the area neat & clean & disposal of waste materials/garbage and the disposed waste materials to be leveled and neaty dressed including the cost of tools and plants plastic flexible pipes, Manure etc. required as per site condition and instruction of Engineer Incharge. (By Engaging 01 Unskilled Manpower). | Up keeing & Maintenance of Lawn & plants with daily watering, sweeping, brooming applying manure & pesticides whichever is required, trimming of plants. Mowing of Lawn, uprooting of unwanted vegetation, shrubs keeping the area neat & clean & disposal of waste materials/garbage and the disposed waste materials to be leveled and neaty dressed including the cost of tools and plants plastic flexible pipes, Manure etc. required as per site condition and instruction of Engineer Incharge. (By Engaging 01 Unskilled Manpower). |
| 2 | Providing & laying of Selection no. 1 Doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same and maintenance for 30 days or more till the grass establish properly, as per direction of the officer-in-charge. | Providing & laying of Selection no. 1 Doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same and maintenance for 30 days or more till the grass establish properly, as per direction of the officer-in-charge. |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design& shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design& shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge |
| 7 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). |
| 8 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade . New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm | Finishing walls with Acrylic Smooth exterior paint of required shade . New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender