Power Private Organizations Closing in 20 days TDR #58343912

Tender For Implementation Of Rainwater Harvesting & Artificial Groundwater Recharge System - Part-B (Percolation Pits) At Jhabua Power Ltd. (A Jv Of Ntpc Ltd.)

Issued by Private Organizations · Seoni, Madhya Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Nov 2026
20 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Seoni → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Implementation Of Rainwater Harvesting & Artificial Groundwater Recharge System - Part-B (Percolation Pits) At Jhabua Power Ltd. (A Jv Of Ntpc Ltd.)

BOQ

Name of Work:- Implementation of Rainwater Harvesting & Artificial Groundwater Recharge System – Part-B (Percolation Pits) at Jhabua Power Ltd. (A JV of NTPC Ltd.)
Sl. No. Item Description
1Percolation Pit + Double Recharge Shaft
2Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil
3Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Hard rock (blasting prohibited)
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
6Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum
7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more (only Fixing)
8Centering and shuttering including strutting, propping etc. and removalof form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
9Brick work with common burnt clay modular bricks of class designation7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)
1012 mm cement plaster of mix :1:4 (1 cement: 4 fine sand)
11Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in-charge.
12Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineerin- charge.
13Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
14Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge.
15Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.All types of soil-300 mm dia
16Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.Rocky strata including Boulders-300 mm dia
17Gabion Check Dam
18Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter 2.7/3.7 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge.
19Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil
20Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
21Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand)
22Dry stone pitching 22.5 cm thick including supply of stones and preparingsurface complete.
23Storm Water Diversion Drain
24Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means over areas (exceeding 30cm in depth.1.5m in width as well as 10 Sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.All kinds of soil.
25Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers eat exceeding 20cm in depth: consolidating ea deposited layer by ramming and watering lead upto 50m and lift upto 1.5m: (INSIDE plant only)
261:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
27Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.All works upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /Cum
28Concrete of M30 grade with minimum cement content of 350 kg /Cum
29Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge
30Reinforcement for RCC work including transportation from store, straightening,cutting bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more.
31Centring and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc.
32Structural steel work riveted, bolted or welded in built up sections,trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:
33PVC slotted pipe 150 mm dia for weep holes as per IS: 12818 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58343912
AUTHORITY Private Organizations
TENDER VALUE Ref. Documents
LAST DATE 24-11-2026
Authority
Authority Name Jhabua Power Limited
Work Description Tender for Implementation Of Rainwater Harvesting & Artificial Groundwater Recharge System - Part-B (Percolation Pits) At Jhabua Power Ltd. (A Jv Of Ntpc Ltd.)
Basic Detail
Tender No JPL/CnM/26-27/1200008619
Bidding Type Tender
Location
City Seoni
State Madhya Pradesh
Key Dates
Publish Date 03 Nov 2026
Submission Date 24 Nov 2026
Open Date 25 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 2 Lakhs
Exemption Not Available
Document List
71ff6e83-862d-4589-9a02-06076777cd98.html
BOQ_345745.xls
FormsFormats.pdf
GCC.pdf
ITB.pdf
SafetyManual.pdf
SCC.pdf
SOW.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Nov 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
html

71ff6e83-862d-4589-9a02-06076777cd98.html

xls

BOQ_345745.xls

pdf

FormsFormats.pdf

pdf

GCC.pdf

pdf

ITB.pdf

pdf

SafetyManual.pdf

pdf

SCC.pdf

pdf

SOW.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender