Tender For Operation And Maintenance Of Stp At Khadia Area For A Period Of 2 Years
Tender Value
54.50 Lakhs
Estimated cost
Bid Submission
19 Nov 2026
0 days left
EMD
68200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation And Maintenance Of Stp At Khadia Area For A Period Of 2 Years
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | CIVIL PART |
| 3 | Operation and Maintenance of Sewage Trearment Plant to ensure smooth, efficient and uninterrupted operation of STP 1.5ML per day capacity which implies routinely observing and analyzing the chemical and physical characterstics of effluent before, during and after their treatment in STP including routine and periodic maintenance of equiments and units, mechanical and electrical parts as described in scope of work. Deployment of adequate manpower to operate the whole system round the clock 365 days of year including up-keeping work of entire premises as per instructions of EIC. The whole system of STP consists of operation and maintenance of raw sewage pumps, inlet chamber, screen chamber, grit chamber, aeration tank including replacement of MBBR media as and when required, blowers, ACF & DMF, secondary clarifier, tube settler, sludge drying bed, chlorination unit and discharge unit of treated sewage. Daily log or diary should be maintained to record events, operation and test results during plant operation consisting following information.i) Flow meter reading, if any.; ii) Period of operarion of each equipment.; iii) Information of break down (BD) to the department (material required are included).Note: this item has to be executed by engaging max. nos of labours per day ( in 24 hours & in shifts) given below- Operators/fitters- 6 nos, Supervisor-1 no.; General Mazdoor/guard- 1 No.;Double wages will be recovered in case of short engagement of labours. (special condition - If the plant is in breakdown condition (partial or fully) for more than 06 hours in a day for any reason other than disruption of power supply a deduction of rupees 2000/day will be done... recovery for short engagement of labour, if any, will be in addition to the Rs. 2000/day if such case arises) |
| 4 | 1-Maintenace of all pumps and motors & mechanical equipments properly including oiling, greasing & changes of gallon dor also including motor winding with copper wire,oil seal replacement, repair of rotor, repair of shaft, \\"O\\" ring changing, changing of bush, changing of oil.Allen key Bolt of required size and length and lifting lowering and aligning of pump with motor etc, all complete as per instruction of EIC |
| 5 | 1.1- Submersible Pump/Motor : 30 HP-Motor winding with copper wire |
| 6 | 1.2 Submersible Pump/Motor : 30 HP-Oil seal |
| 7 | 1.3 Submersible Pump/Motor : 30 HP-Repair of Rotor |
| 8 | 1.4 Submersible Pump/Motor : 30 HP-Repair of shaft |
| 9 | 1.5 Submersible Pump/Motor : 30 HP-\\"O\\" ring Changing |
| 10 | 1.6 Submersible Pump/Motor : 30 HP-Bush changing |
| 11 | 1.7 Submersible Pump/Motor : 30 HP-Grease |
| 12 | 1.8 Submersible Pump/Motor : 30 HP-oil change |
| 13 | 1.9 Submersible Pump/Motor : 30 HP-Allen key bolt of required size and length |
| 14 | 1.10 Centrifugal Pump/Motor : 10 to 20 HP-Motor winding with copper wire |
| 15 | 1.11 Centrifugal Pump/Motor : 10 to 20 HP-Repair of Rotor |
| 16 | 1.12 Centrifugal Pump/Motor : 10 to 20 HP-Repair of shaft |
| 17 | 1.13 Centrifugal Pump/Motor : 10 to 20 HP-Bearing Changing |
| 18 | 1.14 Centrifugal Pump/Motor : 10 to 20 HP-Impellar Repair |
| 19 | 1.15 Centrifugal Pump/Motor : 10 to 20 HP-Pankhi & Bush Repair |
| 20 | 1.16 Centrifugal Pump/Motor : 2 to 5 HP-Motor winding with copper wire and repair |
| 21 | 1.17 Motor : 0.5 HP-Repair of Motor and winding with copper wire |
| 22 | Provide grease and greasing |
| 23 | Procurement of reagents, and daily testing of raw and treated effluent as per norms,weekly & testing from authorized laboratory (for BOD,PH & SS in STP) including cost of all accessories |
| 24 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 25 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 19, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayNov 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender