Tender For New Connections/Lines / Increasing Capacity Works And Other Associated Works Under The Deposited Scheme In The Area Of Electricity Distribution-Sub Division Atrouli, Kachhona, & Sandila, Under Edd Sadnila
Tender Value
28.91 Lakhs
Estimated cost
Bid Submission
12 Nov 2026
3 days left
EMD
28910
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hardoi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Connections/Lines / Increasing Capacity Works And Other Associated Works Under The Deposited Scheme In The Area Of Electricity Distribution-Sub Division Atrouli, Kachhona, & Sandila, Under Edd Sadnila
BOQ
| Sl. No. | Item Description |
| 1 | Supply of following material |
| 2 | 11 KV fuse set |
| 3 | LT Fuse set in SMC Box |
| 4 | X-Arm holding Clamp 50x6 mm with nut and bolts for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 5 | X-arm holding clamp for PCC 11 Mtr. long as per RESPO Norms |
| 6 | Nut, Bolts and Washer all Size as per RESPO Norms |
| 7 | 11 KV F-Clamp 50x6mm MS Flat as per RESPO Norms |
| 8 | I Hook as per RESPO Norms |
| 9 | Suspension for LT Clamp |
| 10 | PG clamp |
| 11 | Piercing Connector |
| 12 | Dead End Clamp |
| 13 | LT Clamp with nut Bolts for pcc pole 8.5mtr. long as per RESPO Norms |
| 14 | LT Clamp with nut Bolts for pcc pole 11mtr. long as per RESPO Norms |
| 15 | Stay Clamp 50x6mm MS Flat for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 16 | Stay Clamp 50x6mm MS Flat for ST Pole 11 mtr. long as per RESPO Norms |
| 17 | Stay Clamp 50x6mm MS Flat for PCC Pole 11 mtr. long as per RESPO Norms |
| 18 | Stay Insulator as per RESPO norms. |
| 19 | Safe loading Carriage & unloading of following material from store centre to pit site/JE dump store approx 40 Km |
| 20 | PCC Pole 11 Mtr Long |
| 21 | PCC Pole 8.5 Mtr Long |
| 22 | 11 kv metering cubical unit |
| 23 | CT/PT pole unit |
| 24 | 33 KV polymeric 'Disc Insulator |
| 25 | 33 KV Polymeric pin Insulater with nut |
| 26 | 33 KV V type X-arm MS Angle 65x65x6 mm |
| 27 | 33KV Dropper Channel |
| 28 | 33KV T-off Channel |
| 29 | 33KV Top Channel |
| 30 | 11 KV F bracket |
| 31 | 11 KV polymeric 'Disc fitting |
| 32 | 11 KV polymeric 'Disc Insulator |
| 33 | 11 KV Polymeric pin Insulator with nut |
| 34 | 11 KV V type X-arm MS Angle 65x65x6 mm |
| 35 | 11kv Dropper Channel |
| 36 | 11kv T-off Channel |
| 37 | 11kv Top Channel |
| 38 | M.S. SS Base Angle |
| 39 | G.I Wire |
| 40 | MS Earthing Complete 20mm |
| 41 | ACSR Dog Conductor |
| 42 | ACSR Rabbit Conductor |
| 43 | ACSR Waeasel |
| 44 | Stay Set Complete |
| 45 | Transformer 250 KVA |
| 46 | Transformer 100 KVA |
| 47 | Transformer 25 KVA |
| 48 | Transformer 63 KVA |
| 49 | I/D cable termination box 3x70/3x185/3x120 sqmm |
| 50 | O/D cable termination box 3x70/3x185/3x120 sqmm |
| 51 | 11 KV XLPE cable 3x70/3x185/3x120 sqmm |
| 52 | AB conductor 3x120 |
| 53 | AB conductor 3x95 |
| 54 | AB conductor 3x50 |
| 55 | AB conductor 1x16 |
| 56 | Erection & Stringing and Sagging of 11 KV & LT line |
| 57 | Erection of PCC 8.5 mtr long Single pole with all accessories |
| 58 | Erection of PCC 8.5 mtr long Double Pole with all accessories |
| 59 | Erection of PCC single pole 11 mtr. Long all necessary accessories |
| 60 | Erection of PCC Double pole 11 mtr. Long all necessary accessories |
| 61 | Erection of 33 KV polymeric 'Disc Insulator, 33 KV Polymeric pin Insulater with nut, 33 KV V type X-arm MS Angle 65x65x6 mm, 33KV Dropper Channel, 33KV T-off Channel, 33KV Top Channel, 11 KV F bracket, 11 KV polymeric 'Disc fitting, 11 KV polymeric 'Disc Insulator, 11 KV Polymeric pin Insulator with nut, 11 KV V type X-arm MS Angle 65x65x6 mm , 11kv Dropper Channel, 11kv T-off Channel, 11kv Top Channel, M.S. SS Base Angle, G.I Wire |
| 62 | Fixing of 11 KV fuse set |
| 63 | Fixing of LT Fuse set in SMC Box |
| 64 | Fixing of X-Arm holding Clamp 50x6 mm with nut and bolts for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 65 | Fixing of X-arm holding clamp for PCC 11 Mtr. long as per RESPO Norms |
| 66 | Fixing of Nut, Bolts and Washer all Size as per RESPO Norms |
| 67 | Fixing of 11 KV F-Clamp 50x6mm MS Flat as per RESPO Norms |
| 68 | Fixing of I Hook as per RESPO Norms |
| 69 | Fixing of Suspension for LT Clamp |
| 70 | Fixing of PG clamp |
| 71 | Fixing of Piercing Connector |
| 72 | Fixing of Dead End Clamp |
| 73 | Fixing of LT Clamp with nut Bolts for pcc pole 8.5mtr. long as per RESPO Norms |
| 74 | Fixing of LT Clamp with nut Bolts for pcc pole 11mtr. long as per RESPO Norms |
| 75 | Fixing of Stay Clamp 50x6mm MS Flat for PCC Pole 8.5 mtr. long as per RESPO Norms |
| 76 | Fixing of Stay Clamp 50x6mm MS Flat for ST Pole 11 mtr. long as per RESPO Norms |
| 77 | Fixing of Stay Clamp 50x6mm MS Flat for PCC Pole 11 mtr. long as per RESPO Norms |
| 78 | Fixing of Stay Insulator as per RESPO norms. |
| 79 | Construction of FRP type T/F plinth of size 1.5x1.5x1.5 sqm |
| 80 | Construction of T/F plinth of size 1.5x1.5x1.5 m on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor). |
| 81 | Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 250 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs) |
| 82 | Mounting of 100 KV T/F form dump place to newly constructed Double pole/Plinth & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 83 | Mounting of 25 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 84 | Mounting of 63 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 85 | ACSR Dog Conductor stringing sagging binding and jumpering of with all accessories |
| 86 | ACSR Rabbit Conductor stringing sagging binding and jumpering of ABC with all accessories |
| 87 | ACSR Waeasel stringing sagging binding and jumpering of ABC with all accessories |
| 88 | Hoisting of 11 kv XLPE (3x120/3x 185 )sq.mm with the provision of G.I. Pipe of size 150 mm dia. ( |
| 89 | Tailless Unit with all Accessories |
| 90 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:6 in cement sand & bla ST |
| 91 | Muffing Plinth 300mmX45mm Above ground level in Ratio 1:2:4 in cement coarse sand & stone grit |
| 92 | Grouting and Nozzling of 11 KV / 33 kv stayset complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 93 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor. |
| 94 | Earthling by way of Boring and lowering the \\"B\\" class GI pipe (Gindal ) of 50mm dia from ground upto water level not less than 20mtr as per standard practice |
| 95 | Laying of 11KV (3x70/3x185/3x120mm) single XLPE cable by digging of trench size 500 mm wide 900 mm after laying of brick, sand and stone slab. |
| 96 | Installation of 11 kv I/D cable box (3x70/3x185/3x120). All material shall be supplied by the Department. |
| 97 | Installation of 11 kv O/D cable box (3x70/3x185/3x120). All material shall be supplied by the Department. |
| 98 | Installation of 11 KV CT/PT double metering unit of constructed double pole structure as per RESPO norms. Only 11 KV CT/PT unit shall be supplied by department. |
| 99 | Fixing & commissioning of 11 KV pilfer Resistance meter All material except pilfer Resistance metering cubical shall be supplied by the contractor. |
| 100 | Stringing & Sagging ABC (3X95+1X35+1X16)Sqmm |
| 101 | Stringing & Sagging ABC (3X50+1X35+1X16)Sqmm |
| 102 | Stringing & Sagging ABC (1x25+1X16)Sqmm |
| 103 | Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm) |
| 104 | Tree cutting |
| 105 | Dismantling of old & used (Existing) material and loading, Carriage & unloading from site to JE Dump store/store centre, Hardoi. (approx 40 Km) |
| 106 | Dismentling of line (Scrap conductor) |
| 107 | PCC 8.5 mtr long single pole with all accessories |
| 108 | PCC 8.5 mtr long double pole with all accessories |
| 109 | STP 11 mtr long single pole with all accessories |
| 110 | STP 11 mtr long double pole with all accessories |
| 111 | TRANSFORMER 250/400/630, KVA |
| 112 | 100 KVA T/F on Double pole with all accessories. |
| 113 | 63/25 KVA T/F on Double pole with all accessories. |
| 114 | Carriage of material pit site to Hardoi store Je dump store/store center of Hardoi. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 12, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender