Bids Are invited for Repair And Overhauling Service - Rate Contract For Repairs Routines On Self Contained Air Conditioners Package Acs Fsus Marine Acs Fcus Hvacs Afus Ahus And Tacs In Vessels; Any Other Suitable Brand; No; Buyer Premises - Condition
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Rate Contract For Repairs Routines On Self Contained Air Conditioners Package Acs Fsus Marine Acs Fcus Hvacs Afus Ahus And Tacs In Vessels; Any Other Suitable Brand; No; Buyer Premises - Condition Assessment: (A) Complete Trials Of Scac, Package Acs, Fsus And Marine Acs For Condition Assessment, Prior To Carrying Out Any Repairs, To Be Undertaken In The Presence Of Ss, User Department Rep And Qc Rep. (B) Condition Of Following Items On The Plants To Be Assessed: - (I) Compressors (Ii) Condensers (Iii) Evaporators (Iv) Blower (V) Pressure Relief Valve (Vi) Liquid Shutoff Valve (Vii) Filter Dryer & Strainer (Viii) Sight Glasses (Ix) Thermostatic Expansion Valve (X) Air Filters (Xi) Sea Water Strainer (Xii) Water Regulating Valve (Xiii) Three Position Switch (Xiv) Thermostat (Xv) Hp Switch (Xvi) Lp Switch (Xvii) System Piping (Xviii) Body (C) Post Assessment Of The Above, A Report Of The Same Pertaining To The Equipment To Be Submitted With Relevant Photographs As Required. , Compressor: Routines/ Repair Of Compressor:(A)Repair Of Inlet And Outlet Pipelines Of Compressors. (B)Repair Of Inlet/Outlet Port Threads. (C)Renewal Of Lub Oil (D)Serviceability Checks Of Compressor Including Starting Current, Running Current And Pumping Of Compressor. (E)Integrate Compressor With System And Carry Out Pt/Vt , Compressor: Replacement Of Compressor Will Entail Following (Compressor Will Be Provided To The Contractor): (If Serial (D) Above Is Un-Sat)(A)Matching Of Inlet And Outlet Port To Existing System (B)Serviceability Checks Of Compressor Including Starting Current, Running Current And Pumping Of Compressor. (C)Carry Out Insulation Checks Of The Compressor.(D)Integrate Compressor With Entire System And Carry Pt/Vt, Modification To Pipelines And Foundation If Required , Compressor: Degutting & Regutting Of The Compressor In Case Of Deck Survey/ Any Other Requirement , Condenser: Repair/ Routines On Condenser: -(A)Degut Condenser To Shop Floor. (B)Cleaning Of Condenser Tubes (C)Check All Tubes Of Condenser For Leakages And Plug If Any Leaking (Within 10%Only)(D)Cleaning Of Gas Side Of Condenser With Kerosene Followed By Flushing Through With Nitrogen.(E)Replace All Gaskets Of Condenser (F)Replacement Of Condenser Anodes (G)Pressure Test To 1.5 Times The Working Pressure (H)Regut Condenser To Onboard And Integrate With System. , Condenser: In Case Renewal Of The Condenser Is To Be Undertaken, The Following Actions Need To Be Undertaken: - (Condenser Will Be Provided To The Contractor)(A)Degut Old Condenser (B)Match Inlet And Outlet Pipelines Of The New Condenser. (C)Carry Out Modification On Pipelines And Foundation If Required. (D)Carry Out Pressure Testing On Both Gas And Water Side. (E)Position Condenser Onboard And Carry Out Entire System Pt/Vt. , Condenser: Degutting & Regutting Of The Condenser In Case Of Deck Survey/ Any Other Requirement. , Evaporator: Repair/ Routines On Evaporator: - (A)Degut Evaporator To Shop Floor (B)Cleaning Of Finned Surface By Using Soft Bristle Brush To Remove Dislodge Dirt (C)Clean Evaporator Fins By Using Water And Cleaning Solution (D)Blow Cleaning Of Evaporator Coil With Nitrogen (E)Pressure Test To 1.5 Times The Working Pressure. (F)Regut Evaporator To Onboard And Integrate With System. (G)Carry Out Pt/Vt Of The System. , Evaporator: In Case Renewal Of The Evaporator Needs To Be Undertaken: - (Evaporator Will Be Provided To The Contractor)(A)Degut Old Evaporator (B)Match Inlet And Outlet Pipelines Of The New Evaporator (C)Carry Out Modifications On The Pipeline And Foundation If Required. (D)Carry Out Pressure Testing Of The Evaporator (E)Position Evaporator Onboard And Carry Out Pt/Vt Of Entire System. , Evaporator: Degutting And Regutting Of Evaporator In Case Of Deck Survey/ Any Other Requirement. , Complete Blower: - Repair/Renewal Of Blower , Pressure Relief Valves: Carry Out Calibration Of Pressure Relief Valves Including Removal And Refitment. , Water Regulating Valves: (A)Carry Out Physical Check On Water Regulating Valve (Wrv).(B)Removal And Refitment. , Liquid Line Shut Off Valve: (A) Removal And Refitment(B) Check Physical Condition.(C) Check Operation By Manual Actuation.(D) Replace If Necessary.(E) Carry Out Pt. , Thermostatic Expansion Valve:(A) Calibration Of Tevs To The Desired Superheat.(B) Replace If Necessary. , Filters, Driers Strainers& Sight Glass: Repair / Renewal Of Filter Drier And Strainer , Filters, Driers Strainers& Sight Glass: Repair / Renewal Of Sight Glass , Filters, Driers Strainers& Sight Glass: Repair / Renewal Of Air Filter , Filters, Driers Strainers& Sight Glass: Repair / Renewal Of Sea Water Strainer , Repair / Renewal Of Water Regulating Valve , Repair / Renewal Of Three Position Switch If Reqd. , Repair / Renewal Of Thermostat , Repair / Renewal Of Hp Cut-Out , Repair / Renewal Of Lp Cut-Out , Repair/Renewal & Calibration Of Gauges. , System Piping: Repairs/Renewal Of Gas And Water System Piping & Isolating Valves Associated To Scac Unit , Body Repairs: Repairs To The Equipment Unit Body Including Renewal Of Foundation Bolt, Cabinet Fasteners, Shock Mounts And Unit Foundation As Required. , Stw & Trials: Post Completion Of The Routines, Carryout Pressure Testing Of The Gas System With Nitrogen & Water System With Fresh Water (1 ½ Times Working Pressure), Vacuum Testing, Gas Charging, Fresh Oil Charging, Comprehensive Stw, Testing, Tuning And Trials. Ensure Sustained Operation Of Plant For Duration Of 72 Hours.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Condition Assessment: (a) Complete trials of SCAC, Package ACs, FSUs and Marine ACs for condition assessment, prior to carrying out any repairs, to be undertaken in the presence of SS, user department rep and QC rep. (b) Condition of following items on the plants to be assessed: - (i) Compressors (ii) Condensers (iii) Evaporators (iv) Blower (v) Pressure relief valve (vi) Liquid shutoff valve (vii) Filter dryer & strainer (viii) Sight glasses (ix) Thermostatic expansion Valve (x) Air filters (xi) Sea water strainer (xii) Water Regulating Valve (xiii) Three Position switch (xiv) Thermostat (xv) HP Switch (xvi) LP switch (xvii) System Piping (xviii) Body (c) Post assessment of the above, a report of the same pertaining to the equipment to be submitted with relevant photographs as required. | Condition Assessment: (a) Complete trials of SCAC, Package ACs, FSUs and Marine ACs for condition assessment, prior to carrying out any repairs, to be undertaken in the presence of SS, user department rep and QC rep. (b) Condition of following items on the plants to be assessed: - (i) Compressors (ii) Condensers (iii) Evaporators (iv) Blower (v) Pressure relief valve (vi) Liquid shutoff valve (vii) Filter dryer & strainer (viii) Sight glasses (ix) Thermostatic expansion Valve (x) Air filters (xi) Sea water strainer (xii) Water Regulating Valve (xiii) Three Position switch (xiv) Thermostat (xv) HP Switch (xvi) LP switch (xvii) System Piping (xviii) Body (c) Post assessment of the above, a report of the same pertaining to the equipment to be submitted with relevant photographs as required. |
| 2 | Compressor: Routines/ Repair of compressor:(a) Repair of inlet and outlet pipelines of compressors. (b) Repair of inlet/outlet port threads. (c) Renewal of lub oil (d) Serviceability checks of compressor including starting current, running current and pumping of compressor. (e) Integrate compressor with system and carry out PT/VT | Compressor: Routines/ Repair of compressor:(a) Repair of inlet and outlet pipelines of compressors. (b) Repair of inlet/outlet port threads. (c) Renewal of lub oil (d) Serviceability checks of compressor including starting current, running current and pumping of compressor. (e) Integrate compressor with system and carry out PT/VT |
| 3 | Compressor: Replacement of Compressor will entail following (Compressor will be provided to the contractor): (if serial (d) above is un-sat)(a) Matching of inlet and outlet port to existing system (b) Serviceability checks of compressor including starting current, running current and pumping of compressor. (c) Carry out insulation checks of the compressor.(d) Integrate compressor with entire system and carry PT/VT, Modification to pipelines and foundation if required | Compressor: Replacement of Compressor will entail following (Compressor will be provided to the contractor): (if serial (d) above is un-sat)(a) Matching of inlet and outlet port to existing system (b) Serviceability checks of compressor including starting current, running current and pumping of compressor. (c) Carry out insulation checks of the compressor.(d) Integrate compressor with entire system and carry PT/VT, Modification to pipelines and foundation if required |
| 4 | Compressor: Degutting & Regutting of the compressor in case of deck survey/ any other requirement | Compressor: Degutting & Regutting of the compressor in case of deck survey/ any other requirement |
| 5 | Condenser: Repair/ Routines on condenser: -(a) Degut condenser to shop floor. (b) Cleaning of condenser tubes (c) Check all tubes of condenser for leakages and plug if any leaking (within 10%only)(d) Cleaning of gas side of condenser with kerosene followed by flushing through with nitrogen.(e) Replace all gaskets of condenser (f) Replacement of condenser anodes (g) Pressure test to 1.5 times the working pressure (h) Regut condenser to onboard and integrate with system. | Condenser: Repair/ Routines on condenser: -(a) Degut condenser to shop floor. (b) Cleaning of condenser tubes (c) Check all tubes of condenser for leakages and plug if any leaking (within 10%only)(d) Cleaning of gas side of condenser with kerosene followed by flushing through with nitrogen.(e) Replace all gaskets of condenser (f) Replacement of condenser anodes (g) Pressure test to 1.5 times the working pressure (h) Regut condenser to onboard and integrate with system. |
| 6 | Condenser: In case renewal of the condenser is to be undertaken, the following actions need to be undertaken: - (condenser will be provided to the contractor)(a) Degut old condenser (b) Match inlet and outlet pipelines of the new condenser. (c) Carry out modification on pipelines and foundation if required. (d) Carry out pressure testing on both gas and water side. (e) Position condenser onboard and carry out entire system PT/VT. | Condenser: In case renewal of the condenser is to be undertaken, the following actions need to be undertaken: - (condenser will be provided to the contractor)(a) Degut old condenser (b) Match inlet and outlet pipelines of the new condenser. (c) Carry out modification on pipelines and foundation if required. (d) Carry out pressure testing on both gas and water side. (e) Position condenser onboard and carry out entire system PT/VT. |
| 7 | Condenser: Degutting & Regutting of the condenser in case of deck survey/ any other requirement. | Condenser: Degutting & Regutting of the condenser in case of deck survey/ any other requirement. |
| 8 | Evaporator: Repair/ routines on evaporator: - (a) Degut evaporator to shop floor (b) Cleaning of finned surface by using soft bristle brush to remove dislodge dirt (c) Clean evaporator fins by using water and cleaning solution (d) Blow cleaning of evaporator coil with Nitrogen (e) Pressure test to 1.5 times the working pressure. (f) Regut evaporator to onboard and integrate with system. (g) Carry out PT/VT of the system. | Evaporator: Repair/ routines on evaporator: - (a) Degut evaporator to shop floor (b) Cleaning of finned surface by using soft bristle brush to remove dislodge dirt (c) Clean evaporator fins by using water and cleaning solution (d) Blow cleaning of evaporator coil with Nitrogen (e) Pressure test to 1.5 times the working pressure. (f) Regut evaporator to onboard and integrate with system. (g) Carry out PT/VT of the system. |
| 9 | Evaporator: In case renewal of the evaporator needs to be undertaken: - (Evaporator will be provided to the contractor)(a) Degut old evaporator (b) Match inlet and outlet pipelines of the new evaporator (c) Carry out modifications on the pipeline and foundation if required. (d) Carry out pressure testing of the evaporator (e) Position evaporator onboard and carry out PT/VT of entire system. | Evaporator: In case renewal of the evaporator needs to be undertaken: - (Evaporator will be provided to the contractor)(a) Degut old evaporator (b) Match inlet and outlet pipelines of the new evaporator (c) Carry out modifications on the pipeline and foundation if required. (d) Carry out pressure testing of the evaporator (e) Position evaporator onboard and carry out PT/VT of entire system. |
| 10 | Evaporator: Degutting and regutting of evaporator in case of deck survey/ any other requirement. | Evaporator: Degutting and regutting of evaporator in case of deck survey/ any other requirement. |
| 11 | Complete Blower: - Repair/Renewal of Blower | Complete Blower: - Repair/Renewal of Blower |
| 12 | Pressure Relief valves: Carry out calibration of Pressure Relief Valves including removal and refitment. | Pressure Relief valves: Carry out calibration of Pressure Relief Valves including removal and refitment. |
| 13 | Water Regulating Valves: (a) Carry out physical check on Water regulating valve (WRV).(b) Removal and refitment. | Water Regulating Valves: (a) Carry out physical check on Water regulating valve (WRV).(b) Removal and refitment. |
| 14 | Liquid line shut off valve: (a) Removal and refitment(b) Check physical condition.(c) Check operation by manual actuation.(d) Replace if necessary.(e) Carry out PT. | Liquid line shut off valve: (a) Removal and refitment(b) Check physical condition.(c) Check operation by manual actuation.(d) Replace if necessary.(e) Carry out PT. |
| 15 | Thermostatic expansion valve:(a) Calibration of TEVs to the desired superheat.(b) Replace if necessary. | Thermostatic expansion valve:(a) Calibration of TEVs to the desired superheat.(b) Replace if necessary. |
| 16 | Filters, Driers Strainers& sight glass: Repair / Renewal of filter drier and strainer | Filters, Driers Strainers& sight glass: Repair / Renewal of filter drier and strainer |
| 17 | Filters, Driers Strainers& sight glass: Repair / Renewal of sight glass | Filters, Driers Strainers& sight glass: Repair / Renewal of sight glass |
| 18 | Filters, Driers Strainers& sight glass: Repair / Renewal of air filter | Filters, Driers Strainers& sight glass: Repair / Renewal of air filter |
| 19 | Filters, Driers Strainers& sight glass: Repair / Renewal of sea water strainer | Filters, Driers Strainers& sight glass: Repair / Renewal of sea water strainer |
| 20 | Repair / Renewal of Water regulating valve | Repair / Renewal of Water regulating valve |
| 21 | Repair / Renewal of Three position switch if reqd. | Repair / Renewal of Three position switch if reqd. |
| 22 | Repair / Renewal of Thermostat | Repair / Renewal of Thermostat |
| 23 | Repair / Renewal of HP Cut-out | Repair / Renewal of HP Cut-out |
| 24 | Repair / Renewal of LP Cut-out | Repair / Renewal of LP Cut-out |
| 25 | Repair/Renewal & calibration of gauges. | Repair/Renewal & calibration of gauges. |
| 26 | System piping: Repairs/renewal of gas and water system piping & isolating valves associated to SCAC unit | System piping: Repairs/renewal of gas and water system piping & isolating valves associated to SCAC unit |
| 27 | Body repairs: Repairs to the equipment unit body including renewal of foundation bolt, cabinet fasteners, shock mounts and unit foundation as required. | Body repairs: Repairs to the equipment unit body including renewal of foundation bolt, cabinet fasteners, shock mounts and unit foundation as required. |
| 28 | STW & Trials: Post completion of the routines, carryout pressure testing of the gas system with nitrogen & water system with fresh water (1 ½ times working pressure), vacuum testing, gas charging, fresh oil charging, comprehensive STW, testing, tuning and trials. Ensure sustained operation of plant for duration of 72 hours. | STW & Trials: Post completion of the routines, carryout pressure testing of the gas system with nitrogen & water system with fresh water (1 ½ times working pressure), vacuum testing, gas charging, fresh oil charging, comprehensive STW, testing, tuning and trials. Ensure sustained operation of plant for duration of 72 hours. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender