Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For Removal And Renewal Of Fire Acoustic Thermal Insulation Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises - Removal Of Fire, Acoustic And Thermal (Fat)
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For Removal And Renewal Of Fire Acoustic Thermal Insulation Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises - Removal Of Fire, Acoustic And Thermal (Fat) Insulation Material From Bulkhead/Deckheads.Removal Process :- Systematically Remove Existing Insulation Material, Including The Removal Of Welded Pins, Caps And Fasteners. Perform Necessary Cutting, Buffing And Scraping To Ensure The Underlaing Structure Is Clean And Free Of Residual Insulation And Debris.Waste Management :- Responsible For The Collection, Segregation, And Disposal Of All Generated Waste Material. Transport Waste From The Vessel/Jetty Premises To An Authorised, Designated Off-Site Location Or Yard -Approved Disposal Area. Technical Specifications: Ncd 1430, Issue 1, 2020. , Renewal Of Fire, Acoustic And Thermal Insulation (Fat) On Bulkheads And Deckheads In Accordance With Ncd 1430 (Issue: 01 Jul 2020).Surface Praparation:- Perform Comprehensive Surface Perparation Including Grinding And Buffing Of The Structural Substrate To Meet Techinical Requirements For Adhesion And Installation.Installation:- Fit New Insulation Pins Utilising Approved Arc Welding Procedures. Install Fat Insulation Materials, Securing Them Firmly With Apppropriate Washers And Caps. Apply Glass Tape Finishing To All Joints And Edges To Meet Insulation Specifications.Waste Management :- Responsible For The Collection And Disposal Of All Construction Debris And Surplus Material. Transport Waste From The Vessel/Jetty Premises To An Authorised, Designated Off-Site Location Or Yard-Approved Disposal Area. , Provide Bamboo Staging/Scaffolding/Platform Upto 5Mtr Height For The Renewal/Removal Of Fire, Acoustic And Thermal (Fat) Insulation , Wherever Required. (Erection And Removal With Material Supply By Firm)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Removal of Fire, Acoustic and Thermal (FAT) insulation material from Bulkhead/Deckheads.Removal Process :- Systematically remove existing insulation material, including the removal of welded pins, caps and fasteners. Perform necessary cutting, buffing and scraping to ensure the underlaing structure is clean and free of residual insulation and debris.Waste Management :- Responsible for the collection, segregation, and disposal of all generated waste material. Transport waste from the vessel/jetty premises to an authorised, designated off-site location or yard -approved disposal area. Technical Specifications: NCD 1430, issue 1, 2020. | Removal of Fire, Acoustic and Thermal (FAT) insulation material from Bulkhead/Deckheads.Removal Process :- Systematically remove existing insulation material, including the removal of welded pins, caps and fasteners. Perform necessary cutting, buffing and scraping to ensure the underlaing structure is clean and free of residual insulation and debris.Waste Management :- Responsible for the collection, segregation, and disposal of all generated waste material. Transport waste from the vessel/jetty premises to an authorised, designated off-site location or yard -approved disposal area. Technical Specifications: NCD 1430, issue 1, 2020. |
| 2 | Renewal of Fire, Acoustic and Thermal insulation (FAT) on bulkheads and deckheads in accordance with NCD 1430 (Issue: 01 Jul 2020).Surface Praparation:- Perform comprehensive surface perparation including grinding and buffing of the structural substrate to meet techinical requirements for adhesion and installation.Installation:- Fit new insulation pins utilising approved ARC welding procedures. Install FAT insulation materials, securing them firmly with apppropriate washers and caps. Apply glass tape finishing to all joints and edges to meet insulation specifications.Waste Management :- Responsible for the collection and disposal of all construction debris and surplus material. Transport waste from the vessel/jetty premises to an authorised, designated off-site location or yard-approved disposal area. | Renewal of Fire, Acoustic and Thermal insulation (FAT) on bulkheads and deckheads in accordance with NCD 1430 (Issue: 01 Jul 2020).Surface Praparation:- Perform comprehensive surface perparation including grinding and buffing of the structural substrate to meet techinical requirements for adhesion and installation.Installation:- Fit new insulation pins utilising approved ARC welding procedures. Install FAT insulation materials, securing them firmly with apppropriate washers and caps. Apply glass tape finishing to all joints and edges to meet insulation specifications.Waste Management :- Responsible for the collection and disposal of all construction debris and surplus material. Transport waste from the vessel/jetty premises to an authorised, designated off-site location or yard-approved disposal area. |
| 3 | Provide Bamboo staging/Scaffolding/Platform upto 5mtr Height for the Renewal/Removal of Fire, Acoustic and Thermal (FAT) insulation , Wherever required. (erection and removal with Material supply by firm) | Provide Bamboo staging/Scaffolding/Platform upto 5mtr Height for the Renewal/Removal of Fire, Acoustic and Thermal (FAT) insulation , Wherever required. (erection and removal with Material supply by firm) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender