Tender For Upgradation/Modernization Of Existing Parks/Green Beltssub-Head : Providing And Fixing Of Green /Hort. Waste Processingplant On Monthly Rental Basis Including O&M For Five Yearsto Provide The Final Compost / Manure@350 Kg/Day, I/Cerection
Tender Overview
Project Description
Tender for Upgradation/Modernization Of Existing Parks/Green Beltssub-Head : Providing And Fixing Of Green /Hort. Waste Processingplant On Monthly Rental Basis Including O&M For Five Yearsto Provide The Final Compost / Manure@350 Kg/Day, I/Cerection Of Shed, Platform Etc. And Transportation Of Greenwaste From Cluster Of Dda Parks/ Green Area Up To Theprocessing Plant In Following 1 No. Dda Park.(I) maintenance of Distt. Park (Lake Area) Pitampura
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Nov-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 14-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing/fixing on monthly rental basis including operation and maintenance (O&M) of Green/Hort. Waste Processing Plant with all requisite components such as :-a. Provision of steel framed shelter of size 22’ X 35’X13.12’ (clear height) covered from all sides including all civil works such as erection, preparation of foundation making good after installation, etc. complete in all respect as per the drawing/direction provided by Engineer-in-charge.b. Shredder/mixer, segregator, weighing machine, water storage tank, all requisite (E&M) such as roof turbo ventilator, cabling, switch panels, spray pump sets, etc. complete to provide compost/manure @350 kg per day.c. Comprehensive (O&M) of the plant so as to produce compost/manure @350 kg per day including cost of operators, consumable parts such as :- forge blades of shredder, bio culture, pipes, arrangement of water for plant, adequate manpower and maintenance/replacement of all (E&M) parts as per requirement and quarterly testing of manure on the basis of random sampling.d. Electricity supply for the plant will be provided by DDA whose consumption shall not exceed 30 Kwh per day. Excess consumption beyond 30 Kwh shall be borne by the agency. A sub-meter shall be installed for the purpose with the approval of Engineer-in-charge by the agency on his own cost.e. The payment shall be reckoned from the date of commission of the plant i.e. with effect from the date on which the plant starts production of compost @ 350 kg per day complying FCO standards. Non-compliance of (O&M) shall make the agency liable for the recovery from the security deposit/bank guarantee.f. Any other item not specified/indicated in the contract but essentially required for satisfactory functioning of the plant will be deemed to have been included and the same shall be executed by the agency after the approval of Engineer-in-charge at his own cost. |
| 2 | Transportation of green waste by mechanical means from other parks of cluster as per the list attached.a. Hire charges of Motorized vehicle including Driver & Fuel |
| 3 | Terms & Conditions1. The agency will install the plants in the park as per list enclosed.2. The labour for collection, loading and unloading of green waste & compost manure shall be provided by DDA to the agency free of cost.3. Green Waste processing Plant shall be capable to process all horticulture waste including grass, leaves, shrubs, hedges, twigs, flowers, small branchesupto 20 mm dia etc. The components of the plant to be installed shall be got approved from the Engineer-in-Charge before installation.4. The Green Waste Processing Plant shall be installed in the designated parks and at the location as decided by the Engineer-in-Charge in consultationwith Dy. Dir. (Hort.)/DDA.5. The required land / space for installation of Green Waste Processing Plant, storage of raw material, final product shall be provided by DDA in the parkfree of cost as decided by the Engineer-in-Charge in consultation with Dy. Director (Hort.)/DDA.6. The electricity to run the plant shall be provided by DDA to the agency. The agency shall ensure minimum power consumption for operationmaintenance of the machine. It should not be more than 900 units per month. Cost over it shall be borne by the agency himself.7. Construction of covered shed with platform of suitable size as per drawing issued by the DDA for the Green Waste Processing Plant and storagegodowns, etc. is to be carried by the agency and nothing extra to be paid on this account.8. Agency has to ensure the operation of the Green Waste Processing Plant to its full efficiency and its proper maintenance for at least 8 hours /day.9. In case of breakdown / non-functioning of plant/ less production than the specified production capacity of compost/manure, recovery shall be made @Rs. 20/- Per kg or if the agency compensates the quantity on the next day by running the plant for extra hours, then no recovery shall be made.10. Agency shall be responsible for making the environment, around the Green Waste Processing Plant installation point and in surrounding areas, neat andclean in compliance to NGT Guidelines to be followed.11. Remaining waste which cannot be converted into compost, if any, shall also be disposed-off by the agency without any extra cost as decided by theEngineer-in-charge in consultation with Dy. Director (Hort.).12. DDA will assist the agency to obtain N.O.C./statutory approvals from Traffic Police, or any other agency, if needed. |
| 4 | 13. The total product / final product such as manure / compost so generated shall be the property of the Hort. Department (DDA) over which agency shallhave no claim what so ever and shall hand over to the Horticulture Staff. A Log Book (Register) containing quantities of production & issue to be maintainedby the agency and SO(Hort.)/officer- in-charge at site.14. DD(Hort.) will collect compost minimum 350 kg per day.15. The final product (manure / compost) shall be got tested in approved laboratory quarterly (once in three months) or as desired by Site-in-charge, If thequality of the product is not found satisfactory, in that case decision for payment shall rest with the Engineer-in-Charge whose decision shall be final andbinding.16. After the expiry of contract period, the agency has to clear the site.17. Agency is allowed to erect small advertising boards / banners around processing plant at his own cost.18. The responsibility of proper and smooth operation, security of the machine and maintenance of the whole operation shall rest with the agency solely.19. After satisfactory performance and result the offer can be extendable after 5 years on same terms & conditions on year-to-year basis for a period of 5years.20. The manure should not contain any sort of weed’s seeds etc. able to germinate. The agency shall have to treat/ process the manure by adding herbicideetc. at their own cost & the product should not be harmful to plants.21. The payment shall be made on monthly basis after successful daily production of compost as per agreement and satisfactory test result as per fertilizercontrol order. (FCO standards).22. Rates are inclusive of applicable GST & nothing shall be reimbursed on this account.23. The list of parks stipulated in the NIT for collection and processing of green waste may be modified/more number of parks may be added in future asper requirement of the work/plant by the Engineer-in-charge. Nothing extra shall be paid to the contractor for collection &transportation of the green waste tothe plant site on account of such modification/addition of parks.24. Agency will arrange the firefighting system such as water tank, fire extinguisher etc at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender