Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #58320550

Tender For Provn Of 400 Kva Transformer And Associated E/M Works Services At Af School Agra Under Ge (Af) Adm Area Agra

Issued by Statutory Bodies & Commissions/Committees · Agra, Uttar Pradesh
Tender Value
40.89 Lakhs
Estimated cost
Bid Submission
21 Nov 2026
0 days left
EMD
81780
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Provn Of 400 Kva Transformer And Associated E/M Works Services At Af School Agra Under Ge (Af) Adm Area Agra

BOQ

Name of Work:- PROVN OF 400 KVA TRANSFORMER AND ASSOCIATED E/M WORKS SERVICES AT AF SCHOOL AGRA UNDER GE (AF) ADM AREA AGRA
Sl. No. Item Description
1Supply, installation, Testing, Commissioning of Oil Cooled, Copper wound, Step down down \\"BIS marked as per Electrical transformers (Quality Control) order, 2014 issued by ministry of Heavy Industries and Public Enterprises & BEE star labelled as per DT notification issued by ministry of power” transformer of capacity 400 KVA plinth mounted outdoor type with latest feature complete with standard fitted HT 11 KV 3 phase, LT 433V 3phase 4 wire,50 Hz, copper wound, outdoor type , vector group Dyn 11, percentage impedance 4.5% with copper winding ,oil immerse, naturally cooled (ONAN) externally cooling tube delta connection on primary HT 11 KV side and star connection on secondary LT 433V with tapping range of +/-7.5 % in step of +/-2.5 on HV side and to be changed by means of hand operated off load tap changing gear including first filling of new transformer oil as per IS:335 (mineral oil) of dilectric strength not less than 55 KV with all fitting and accessories such as LT box with cable gland, HT box with cable gland, Silica gel, breather, Oil level indicator gauge, drain out valve (oil tank), exhaust vent, air release valve, temp gauge, cast iron wheel etc.comply with Energy Efficiency Level- 3 IS 1180 (Part-1)-2014 with amendment no. 4 having total losses @ 50% load 1080W & total losses @ 100% load 3214W with no positive tolerance at rated voltage & frequency Including following items/ Accessories. Contd.(i) Name, rating & diagram plate(ii) Off circuit tap changing switch(iii) Earthling terminals(iv) Lifting lugs(v )Oil drain valve with plug(vi) Oil filter valve with plug (vii) Conservator with oil filling hole
2(viii) Thermometer pocket(ix) Air release plug(x) Silicagel breather(xi) Removable inspection opening(xii) Explosion vent Note : (i) The drawings of transformer shall be got approved from GE.(ii) Manufacturer’s inhouse Lab must be NABL accredited for the relevant tests.(iii) All tests shall be carried out at factory before the dispatch in the presence of the inspection officer.(iv) Manufacturer must have ISO Certificates (ISO:9001, ISO:14001, ISO:45001).v) In case of any fault or failure of the transformer during the warranty/defect liability period, the contractor shall be fully responsible to arrange and install a temporary replacement transformer of the same capacty and compatible voltage ratio/vector group and rating within 24 (twenty-four) hours at site to ensure uninterrupted power supply..vi) The rent/hire charges of the temporary transformer, including transportation, installation, operation and removal, shall be borne entirely by the contractor until the original transformer is repaired, tested, and reinstalled in healthy working condition at site, to the satisfaction of the Engineer-in-Charge, at no extra cost to the department.
3M & L for Providing and constructing OEM recommended RCC foundation for 400 kVA transformer, including excavation, PCC bed, RCC work with reinforcement, shuttering, grouting, transformer rails (if required), earthing provisions, finishing, curing, backfilling, and making the foundation ready to receive the transformer, complete in all respects as per approved drawings, technical specifications, and directions of the Engineer-in-Charge.((Transformer foundation size should be as per the actual transformer OEM foundation drawing recommentation)
4M & L for Providing and fixing GI chain link fencing of 18.00 RM forming a rectangular enclosure of 5.00 m × 4.00 m, 2.40 m high above ground level, around 400 kVA outdoor transformer foundation, comprising 50×50 mm diamond mesh of 4.0 mm dia hot-dip galvanized GI wire; MS angle 65×65×6 mm / 80 mm dia GI pipe posts at maximum 2.50 m c/c, embedded in 300×300×600 mm deep PCC (1:3:6) foundation blocks including excavation and backfilling; corner/end struts and gate-post supports; 3 rows of 12×12 gauge GI barbed wire on cranked GI arms; one 3.00×2.40 m double-leaf MS angle framed gate covered with same chain-link mesh, complete with hinges, bolts, locking and stopper arrangements; including zinc chromate primer and two coats synthetic enamel paint to MS components, GI binding/tension wires, clamps, nuts, bolts, erection, alignment, finishing and all associated works, complete in all respects as per approved layout, OEM requirements and direction of Engineer-in-Charge.Clearance;- 1.5 m clear distance between the transformer and chain-link fence
5Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 300 sq mm 3.5 core all as specifiand as directed.
6Excavation in trenches in soft/loose soil n.exc 1.5m wide and n. exc 1.5m depth for laying of cable, errection of poles, stay and pipe line,and getting out complete all as specified and directed
7Returning & filling including spreading, leveling watering and well ramming in layers n. exc 25 cm thick in any type of soil complete all as specified.
8Removal of excavated soil to a distance n. exc 50 m above the starting point complete all as specified.
9Supply & laying double walled corrugated (DWC) HDPE full rounded pipe in 6 mtr lenght conforming to IS 16205 Pt-24 of approved colour complete with fittings for cable protection of size 120 mm outer dia and 103.5 mm inner dia completed all as specified and directed.
10M & LCable jointing kit for 11 KV (Earthed) grade cable for outdoor termination cold shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 sqmm to 185 sqmm complete all as specified and directed.
11M&L Earthing complete with 60cm x 60cm x 6 mm thick GI plate electrode buried in ground vertically not less than 2.25mtrs deep below ground level with top edge of the plate not less than 1.5mtrs below ground level with GI strip of size 32 x 6mm as earthing lead including necessary excavation and earth work (in any of strata) providing charcoal dust, salt mixed with fine sand in continuous layers, PCC (1:3:6 ) type C1 in chember ,Precast 50 mm thick in cement ( 1: 2:4) type B.1 with CI frame with cover, 20mm dia bore light grade GI watering pipe furnel etc fixing of GI Pipe 40 mm bore protection for earthing strip from earth pit to test point complete & making connection all as specified in Electrical plate No 3 and as directed by Engineer-in-Charge.
12Supply, installing, erecting, commissioning and testing new factory made LT panel board, 415 Volts, 3 Phase & 4wire system, cubical out door type of suitable size for housing of all equipments & proper heat dissipation, CPRI approved weather/dust proof, made out of 3.15 mm thick CRCA sheet powder coated with front and back side openable with suitable cable alley protected with bakelite sheet between bus bar & cable alley with front side shutters with locking arrangement, including TPN Aluminium bus bar insulated with colour coaded heat shrinkable sleeve of rating not less then 1.5 times the rated capacity of the incomer ACB/ MCCB and bus bar chamber covered both side using bakelite sheet partition and wire mesh to the back side of cable alley for the protection purpose . All type Test Certificates and Design varification with switch gears ( ACB & MCCB) as per confirming to IS/ IEC: 61439/2011 Part-1 and part -2 with short circuit test at 65 KA, should be submitted by the contractor before executing the job. The TPN bus bar shall be mounted on F class insulators with intervals not more then 500 mm. All interconnections between the main bus bar as well as incoming/outgoing feeders shall be carried out with TPN Aluminium bus bar of rating not less then 1.5 times rated capacity of individual outgoing feeders. All control wiring shall be with FRLS PVC insulated 2.5 sqmm multi-stranded copper conductor and shall be properly bunched. The panel board shall have bottom channel of size 75 x 40 mm properly welded with 45 CM long 04 legs of angle iron 50x50x6 mm using 3 mm thick CRCA sheet corners to all legs and complete mounted or fixed on PCC foundation above 0.45 mtr on floor and cable connection with suitable size of Aluminum lugs and suitable size of chrome plated brass double compression glands provided for incoming and out-going cables comprising the following :- Make of ACB/ MCCB/MCB/Change over switch: L&T /ABB/ LEGRAND/ SCHNIEDER/ SIEMENS
13INCOMING ACB(a) All main busbar and interconnections shall be suitable cross section and current rating with continouse current rating not less than the desighn current of the panel and short circuit withstand rating compatible with the specified fault level.(b)630 Amp ACB 4 Pole, 415 V,50 KA Drawout ACB with electronic microprocessor based protection release, suitable for overload , short circuit and Earth fault protection as applicable.OUTGOING MCCBa) 250 Amp 4 pole MCCB 36 KA breaking capacity with adjustable thermal magnetic setting with rotary handle Ics= 100% Icu - 02 Nos.b) 160 Amp 4 pole MCCB 36 KA breaking capacity with adjustable thermal magnetic setting with rotary handle Ics= 100% Icu - 02 Nos.C) Space for spare MCCB .Metering:d) AC digital voltmeter 0-500 volts Size 4\\"X4\\" with 3 Ph selector switch-01 Nose) 0-500 digital Amp meter with suitable Size 4\\"X4\\" with 3 Ph selector switch- 01 No..f) LED Indicating lamps RYB set of three -01 SetsNote: (a) Cable entry should be incoming/ out going from separate cable gallery.(b) All incoming/outgoing ACB shall be provided with suitable size of copper connection plates.(c) All incoming/outgoing ACB shall be provided with suitable spreader links.(d) Provision of gland hole, brass glands and heat shrinkable end joints of all incoming and out going cables all as directed.(e) All incoming/outgoing ACBs should be marking label/end plate/end clams/ suitable size of terminal block stud/screw less type etc.(f) Main bus bar/ link bus bar should be full covered including back side. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58320550
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 40.89 Lakhs
LAST DATE 21-11-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Provn Of 400 Kva Transformer And Associated E/M Works Services At Af School Agra Under Ge (Af) Adm Area Agra
Basic Detail
Tender No 80026-45/E8
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 31 Oct 2026
Submission Date 21 Nov 2026
Open Date 28 Nov 2026
Finance
Tender Value 40.89 Lakhs
Tender Fee 500
EMD 81780
Exemption Available
Document List
6ae1d671-3743-4388-9780-135014d302b7.html
BOQ_893680.xls
Tenderdocus.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 31, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

6ae1d671-3743-4388-9780-135014d302b7.html

xls

BOQ_893680.xls

pdf

Tenderdocus.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender