Tender For Conversion Of The Existing 33 Kv Bare Conductor In To Covered Conductor & Allied Works Along Valapad- Anchangadi 33 Kv Line Route (Supply And Stringing 1.5 Km Of Covered Conductor - 33Kv Aaac)
Tender Value
1.04 Crore
Estimated cost
Bid Submission
20 Nov 2026
16 days left
EMD
50000
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thrissur → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Conversion Of The Existing 33 Kv Bare Conductor In To Covered Conductor & Allied Works Along Valapad- Anchangadi 33 Kv Line Route (Supply And Stringing 1.5 Km Of Covered Conductor - 33Kv Aaac)
BOQ
| Sl. No. | Item Description |
| 1 | Stringing of 33kV,120sqmm, XLPE Covered Conductor including fitting all accessories, providing end terminations, midspan joints,installing insulated piercing connectors etc. |
| 2 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 3 | Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers. (cost index(e) : 1.3132 included in Rate) |
| 4 | Dismanling 3 Line Dog from the tower detaching the clamps,connectors and line accessories from the conductor,winding and stacking the same at site.Take 50% of the stringing rate vide item no 63 (cost index(e) : 1.3132 included in Rate) |
| 5 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Loading HT A type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). |
| 7 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 8 | Transporting A type pole of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading). |
| 9 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 10 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 11 | Fitting one Additional 2.4m Channel cross arm in existing single pole including conveyance of materials. |
| 12 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 13 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 14 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 15 | Transporting A type pole of all sizes by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). |
| 16 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 18 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 19 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 20 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 21 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 22 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 23 | Additional rate for excavation of Pit for A type pole in Rock. |
| 24 | Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 25 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 26 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 27 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 28 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 29 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 30 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 31 | Dismantling one LT 2 line cross arm with clamp from existing pole and stacking. |
| 32 | Dismantling one LT 4 line cross arm with clamp from existing pole and stacking. |
| 33 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |
| 34 | Cutting Channel/Cross Arm/Angle Iron into two pieces. |
| 35 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 36 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 37 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 38 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 39 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 40 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 41 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level.The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 42 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 43 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 44 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil (cost index(c) : 1.4445 included in Rate) |
| 45 | 2.9.1 : Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock (cost index(c) : 1.4445 included in Rate) |
| 46 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (cost index(c) : 1.4445 included in Rate) |
| 47 | 2.26.2 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock (cost index(c) : 1.4445 included in Rate) |
| 48 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (cost index(c) : 1.4445 included in Rate) |
| 49 | 2.17.2 : Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding1.5 m but not exceeding 3 m (cost index(c) : 1.4445 included in Rate) |
| 50 | 2.22.2 : Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered):Depth exceeding 1.5 m but not exceeding 3 m (cost index(c): 1.4445 included in Rate) |
| 51 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (cost index(c) : 1.4445 included in Rate) |
| 52 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete (cost index(c): 1.4445 included in Rate) |
| 53 | 13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) (cost index(c) : 1.4445 included in Rate) |
| 54 | Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete (cost index(e) : 1.3132 included in Rate) |
| 55 | Dewatering Manual (cost index(c) : 1.4445 included in Rate) |
| 56 | Providing Tack welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of Anti corrossive paint after cleaning the surface and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour transport charges etc complete. (cost index(e) : 1.3132 included in Rate) |
| 57 | Loading MS / GI materials hardware fittings of line work and clamps for equipments and bus from the place of its storage to department lorry and make it ready for transportation as per the direction of departmental officers. (cost index(e) : 1.3132 included in Rate) |
| 58 | Unloading MS / GI materials, hardware fittings of line work and clamps for equipments and bus from department lorry to substation site and stacking for proper storage as per the direction of departmental officers. (cost index(e) : 1.3132 included in Rate) |
| 59 | Marking the trees as specified with using enamel paint of approved quality and shades as specified, letters/figures of height 2.5 cm to 5 cm including all charges of labour and cost of materials etc complete (cost index(c) :1.4445 included in Rate) |
| 60 | Numbering of Tree (marking for cutting the tree) using yellow enamel paint as specified including cost of paint. |
| 61 | 2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth (cost index(c) : 1.4445 included in Rate) |
| 62 | 2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth (cost index(c) : 1.4445 included in Rate) |
| 63 | 2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cmgirth (cost index(c) : 1.4445 included in Rate) |
| 64 | 2.33.4 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth (cost index(c) : 1.4445 included in Rate) |
| 65 | 50.2.33.5 Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete (cost index(c) : 1.4445 included in Rate) |
| 66 | 50.2.33.6 Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete (cost index(c) : 1.4445 included in Rate) |
| 67 | 50.2.33.7 Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (cost index(c) : 1.4445 included in Rate) |
| 68 | 50.2.33.8 Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (cost index(c) : 1.4445 included in Rate) |
| 69 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 70 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 71 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 72 | 33 kV grade XLPE insulated Covered conductor, water blocked stranded circular of size CC-120 sq.mm AAAC conductor |
| 73 | 33 kV class polymeric Pin Insulator |
| 74 | 33 kV class polymeric Tension Insulator with special string hardware & accessories |
| 75 | Termination kit ( Bolted/Crimped lug+Heat shrinkable type) |
| 76 | Earth Pipe GI 40mm dia, 2.5 mtrs long |
| 77 | Mid Span joint for 33 kV 120 sqmm covered conductor |
| 78 | Insulating piercing connectors for branching / surge arresters/ CC to bare connnection. |
| 79 | Polymeric surge arrestors 33kV class, 10 kA, Class 1 |
| 80 | Pre formed metallic cable ties suitable to bind covered conductor with pin insulator. Please Enable Macros to View BoQ information |
| 81 | Labour Chrges from BOQ Sheet 1 |
| 82 | Material Chrges from BOQ Sheet 2 |
AI Tender Summary
Tender Timeline
Nov 02, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysNov 23, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓
Disclaimer