Tender For Malappuram Dp Annual Plan-Project No: 405/27 Comprehensive Works To Moolayil Sc Nagar At Pulikkal Gp
Tender Value
19.91 Lakhs
Estimated cost
Bid Submission
06 Nov 2026
5 days left
EMD
49775
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Malappuram → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Malappuram Dp Annual Plan-Project No: 405/27 Comprehensive Works To Moolayil Sc Nagar At Pulikkal Gp
BOQ
| Sl. No. | Item Description |
| 1 | APP A - Side Protection works to House |
| 2 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil |
| 3 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil |
| 4 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 5 | 4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | 4.2.5 Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 9 | 4.3.2 Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 10 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 11 | 60.6 PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. |
| 12 | 60.7.1 DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 13 | 13.33.1 Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand): Flush/ Ruled pointing |
| 14 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement: 2 coarse sand (zone-III)derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | 10.26.3 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes |
| 16 | 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 17 | OD138849/2026-2027 Providing and fixing Granite of any colour and shade for Name Board of required size laid over base of cement mortar 1:4(1 cement: 4 coarse sand), including all charges etc, complete at all levels, including lettering & fixing. |
| 18 | APP- NEW ROAD WAY CONCRETING |
| 19 | OD138888/2026-2027 OD from DAR 2.28.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 20 | OD138887/2026-2027 [OD From MORD 4.1.A.1] Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with plate vibrator to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material |
| 21 | OD138886/2026-2027 Modified 75.8.1 Providing Plain cement concrete without form work for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm, mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender