Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Bsnl Warangal Oa; Power Generators; As Per Atc - Attending The Break Down Complaints/ Preliminary Inspection/ Inspection Of Ea Sets Including Checki
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Bsnl Warangal Oa; Power Generators; As Per Atc - Attending The Break Down Complaints/ Preliminary Inspection/ Inspection Of Ea Sets Including Checking, Rectifying The Minor Faults, Testing The Ea Set On Exchange Load Etc.,Complete As Required If Any Faults So Giving The Complete Estimation Etc., As Required , General Servicing Of Following Capacity Ea Sets Including Draining Out The Existing Oil, Filling New Lubricating Oil, Replacing The Filter Kits, Adjusting The Belt Tensions, Cleaning The Ea Set And Testing On Exchange Load As Required.A) 10/15/12.5 Kva , Replacement Of The Following Components (When Found Faulty) I/C Removing The Existing One And Testing After Replacement As Required.A) Nomal Duty Fuel Flexible Pipe Of Length Approx.30/36 Inches , A) Removing Of Faulty Fuel Injection Pump From Engine, By Removing All All Fuel Connections, All Bolts And Nuts. Shifting Of Fuel Iniection Pump The Nearest Authorised Mico/Bosch Workshop For Calibration.Calibration Of Fuel Injecton Pump By Replacemernt Of Necessory Such As Delivery Valves, Elements, Rollers Springs, Bearings, Packing Kit, O Ring Kit Etc As Required. Calibration Of Fuel Injection Pump On Test Bench By Skilled Manpower Taking The Readings (Discharge Quantity And Pressure) On Testing Machine Etc As Required And Vice-Versa. , Providing And Repairing Of Self Starter Of Ea Set Upto 63 Kva I/ C Transportation To Workshop, Reinstallation, Testing And Commissioning As Required , Providing Servicing Of Radiator Of Ea Set Up To 40 Kva, Including Cleaning, Arresting The Minor Leakages, I/C Brazing The Cracks, Etc. Complete As Required , Supplying And Fixing Of The Following Dg Startup Batteries Including Initial Charging,Testing At Site Including Making Good Etc As Required.A) 12V 180 Ah
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Attending the break down complaints/ Preliminary Inspection/ inspection of EA sets including checking, rectifying the minor faults, testing the EA set on exchange load etc.,complete as required if any faults so giving the complete estimation etc., as required | Attending the break down complaints/ Preliminary Inspection/ inspection of EA sets including checking, rectifying the minor faults, testing the EA set on exchange load etc.,complete as required if any faults so giving the complete estimation etc., as required |
| 2 | General servicing of following capacity EA sets including draining out the existing oil, filling new lubricating oil, replacing the filter kits, adjusting the belt tensions, cleaning the EA set and testing on exchange load as required.a) 10/15/12.5 KVA | General servicing of following capacity EA sets including draining out the existing oil, filling new lubricating oil, replacing the filter kits, adjusting the belt tensions, cleaning the EA set and testing on exchange load as required.a) 10/15/12.5 KVA |
| 3 | Replacement of the following components (when found faulty) i/c removing the existing one and testing after replacement as required.a) Nomal duty fuel flexible pipe of length approx.30/36 Inches | Replacement of the following components (when found faulty) i/c removing the existing one and testing after replacement as required.a) Nomal duty fuel flexible pipe of length approx.30/36 Inches |
| 4 | a) Removing of faulty fuel Injection Pump from Engine, by removing all All Fuel connections, all bolts and nuts. Shifting of fuel iniection Pump the nearest authorised Mico/Bosch Workshop for calibration.Calibration of Fuel injecton pump by replacemernt of necessory Such as Delivery valves, elements, rollers springs, bearings, packing kit, 'o' ring kit etc as required. Calibration of fuel injection Pump on test bench by skilled manpower taking the readings (Discharge quantity and pressure) on testing machine etc as required and vice-versa. | a) Removing of faulty fuel Injection Pump from Engine, by removing all All Fuel connections, all bolts and nuts. Shifting of fuel iniection Pump the nearest authorised Mico/Bosch Workshop for calibration.Calibration of Fuel injecton pump by replacemernt of necessory Such as Delivery valves, elements, rollers springs, bearings, packing kit, 'o' ring kit etc as required. Calibration of fuel injection Pump on test bench by skilled manpower taking the readings (Discharge quantity and pressure) on testing machine etc as required and vice-versa. |
| 5 | Providing and Repairing of self starter of EA set upto 63 KVA i/ c transportation to workshop, reinstallation, testing and commissioning as required | Providing and Repairing of self starter of EA set upto 63 KVA i/ c transportation to workshop, reinstallation, testing and commissioning as required |
| 6 | Providing Servicing of radiator of EA set up to 40 KVA, including cleaning, arresting the minor leakages, i/c brazing the cracks, etc. complete as required | Providing Servicing of radiator of EA set up to 40 KVA, including cleaning, arresting the minor leakages, i/c brazing the cracks, etc. complete as required |
| 7 | Supplying and fixing of the following DG Startup batteries including initial charging,testing at site including making good etc as required.a) 12V 180 Ah | Supplying and fixing of the following DG Startup batteries including initial charging,testing at site including making good etc as required.a) 12V 180 Ah |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender