Tender For Augmentation And Extension Of Lis Barli In Tehsil Nurpur Distt. Kangra (Hp) (Sub Head:- Construction Of Reinforced Cement Concrete Feeder Channel To Divert The Flow Of Water)
Tender Overview
Project Description
Tender for Augmentation And Extension Of Lis Barli In Tehsil Nurpur Distt. Kangra (Hp) (Sub Head:- Construction Of Reinforced Cement Concrete Feeder Channel To Divert The Flow Of Water) , Excavation In Foundations Trenches Etc. In Earth Work In All Kinds Of Soil Such As Pick Work, Jumper Work, Blasting Work In Hard/ Soft Rocks, Chiselling / Wedgeing Out Of Hard /Soft Rock Including Dewatering In Saturated Soil Upto All Leads And Lifts Stacking The Excavated Soil / Materials Not More Than 3 Metres Clear From The Edge Of Excavation And Then Returning The Stacked Soil In 15 Centimetre Layers When Required Into Plinths Side Of Foundations Etc., Consoildating Each Deposited Layer By Ramming And Watering And Then Disposing Of All Surplus Excavated Earth Within All Leads And Lifts As Per The Direction Of Engineer-In -Charge. , Providing And Laying Cement Concrete 1:4:8 ( 1 Cement : 4 Sand: 8 Graded Stone Aggregate 40Mm Nominal Size) Excluding Cost Of Centring And Shuttering In Foundation And Plinth Within All Leads And Lifts As Per The Direction Of Engineer-In-Charge. , Providing And Laying Cement Concrete 1:2:4(1Cement:2Sand:4Graded Stone Agg., 20Mm Nominal Size) And Curing Complete Excluding Cost Of Form Work And Reinforcement For Reinforced Concrete Work In :- , In Foundation, Footings, Bases Of Columns And The Like And Mass Concrete Within All Leads And Lifts As Per The Directions And Satisfactions Of The Engineer-In-Charge. , In Walls (Any Thickness) But Not Less Than 0.10 Metre Thickness Including Attached Pillasters,Buttresses,Plinth And String Courses Etc.From Top Of Foundation Level Upto Any Floor Level Within All Leads And Lifts As Per The Directions And Satisfactions Of The Engineer-In-Charge. , Providing Form Work With Steel Plates 3.15 Milimetre Thick Welding With Angle Iron In Frame 30X30x5 Milimetre, So As To Give Fair Finish Including Centering, Shuttering Strutting And Propping Etc. With Wooden Battens And Ballies, Height Of Propping And Centring Below Supporting Floor To Ceiling Not Exceeding 4 Metres And Removal Of The Same For In-Situ-Reinforced Concrete And Plain Concrete Work In:- , Foundation Footings And Bases Of Column I.E. Siesmic Band At Plinth Level Complete In All Respect Within All Eads And Lifts As Per Direction Of Engineer-In-Charge. , Vertical Surfaces Such As Walls (Any Thickness) Partitions And The Like Including Attached Pillasters, Buttresses, Plinth And String Courses And The Like Within All Leads And Lifts As Per The Direction Of Engineer-In Charge. , Providing And Laying Mild Steel / Tor Steel Reinforcement For Rcc.Work Including Bending,Binding And Placing In Position Complete Upto Any Floor Within All Leads And Lifts As Per The Directions And Satisfactions Of The Engineer-In-Charge.
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiselling / wedgeing out of hard /soft rock including dewatering in saturated soil upto all leads and lifts stacking the excavated soil / materials not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15 centimetre layers when required into plinths side of foundations etc., consoildating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. |
| 2 | Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. |
| 3 | Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg., 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- |
| 4 | In foundation, footings, bases of columns and the like and mass concrete within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. |
| 5 | In walls (any thickness) but not less than 0.10 Metre thickness including attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto any floor level within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. |
| 6 | Providing form work with steel plates 3.15 milimetre thick welding with angle iron in frame 30x30x5 milimetre, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for in-situ-reinforced concrete and plain concrete work in:- |
| 7 | Foundation footings and bases of column i.e. Siesmic band at plinth level complete in all respect within all eads and lifts as per direction of Engineer-in-charge. |
| 8 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge. |
| 9 | Providing and laying mild steel / tor steel reinforcement for RCC.work including bending,binding and placing in position complete upto any floor within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender