Tender For Repair And Reconstruction Of Link Road Pachim Saria Barigipur Marg Se Umrawa Tak Road Repair Work 05 Year Defecat Lability Work
Tender Value
17.15 Lakhs
Estimated cost
Bid Submission
04 Nov 2026
4 days left
EMD
1.72 Lakhs
Bank guarantee accepted
Document Fee
3100
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Repair And Reconstruction Of Link Road Pachim Saria Barigipur Marg Se Umrawa Tak Road Repair Work 05 Year Defecat Lability Work
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by EC |
| 2 | W.B.M. Grading-3Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per Technical Specification Clauses 405. |
| 3 | Providing and applying Primer coat with emulsion(ss-1) prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical menans |
| 4 | Providing and applying tack coat with bitumen VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis |
| 5 | Providing laying and rolling of open graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen of cut back or emulsion to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tone capacity finished to required level and qrades |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface |
| 7 | S/F of signboard as per direction of engineer in charge |
| 8 | Supply and fixing of 350mm dia hp Chapter 01 Page 15 sedule 2020For pipe |
| 9 | Supply and fixing of 350mm dia hp Chapter 01 Page 15 sedule 2020for coller |
| 10 | Supply and fixing of 350mm dia hp Chapter 01 Page 15 sedule 2020for Labour |
| 11 | cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5fm and cement proportion of M20 1:1.5:3 including supply of all materials of all materials |
| 12 | W.B.M. Grading-3Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper gra |
| 13 | C.C with 40mm brick ballst 1:6:12 as per |
| 14 | Brick work 1:4 with cement and sand as per |
| 15 | Interlocking with 80mm thick block pavement As per Mord |
| 16 | W.B.M. Grading-3Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per Technical Specification Clauses 405. |
| 17 | Providing and applying tack coat with bitumen VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis |
| 18 | Providing laying and rolling of open graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen of cut back or emulsion to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tone capacity finished to required level and qrades |
| 19 | Providing and laying seal coat sealing the voids in a bituminous surface |
| 20 | Excavation in foudation in ordinary soil |
| 21 | The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]% |
| 22 | The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected]% |
| 23 | The routine maintenance of above road work including earthen shoulder interlocking road pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]% |
| 24 | The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]% |
| 25 | The routine maintenance of above road work including earthen shoulder and interlocking etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]% |
| 26 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]% |
| 27 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected]% |
| 28 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]% |
| 29 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]% |
| 30 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]% |
| 31 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 1st year maintenance cost@ 0.% |
| 32 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost@ 0.75% |
| 33 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]% |
| 34 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for Fourth year maintenance cost@ 2.25% |
| 35 | The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]% Item No. 1 to 20 cost of work (item no 21 to 35 Maintenance work) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 04, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender