Tender For Construction Of Community Soak Pit In Poondi Block Package03
Tender Value
4.32 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
0 days left
EMD
4500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Community Soak Pit In Poondi Block Package03
BOQ
| Sl. No. | Item Description |
| 1 | 1.Construction of Community soak pit @ Ramanjeri Mettu Colony 30000 Litre OHT in Ramanjeri Panchayat |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 3 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 4 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 5 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 6 | Filling the soak pit with 225 mm boulders as per specification |
| 7 | Soakpit Bottom 1st layer |
| 8 | Filling the soak pit with 63/65mm metal as per specification |
| 9 | Soakpit bottom 2nd layer |
| 10 | Filling the soak pit with 20mm metal as per specification |
| 11 | Soakpit bottom 3rd layer |
| 12 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 13 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 14 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 15 | 2.Construction of Community soak pit @ Ramanjeri ST Colony 30000 Litre OHT in Ramanjeri Panchayat |
| 16 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 17 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 18 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 19 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 20 | Filling the soak pit with 225 mm boulders as per specification |
| 21 | Soakpit Bottom 1st layer |
| 22 | Filling the soak pit with 63/65mm metal as per specification |
| 23 | Soakpit bottom 2nd layer |
| 24 | Filling the soak pit with 20mm metal as per specification |
| 25 | Soakpit bottom 3rd layer |
| 26 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 27 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 28 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 29 | 3.Construction of Community soak pit @ Valliammapet SC Colony 10000 Litre OHT in Ramanjeri Panchayat |
| 30 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 31 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 32 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 33 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 34 | Filling the soak pit with 225 mm boulders as per specification |
| 35 | Soakpit Bottom 1st layer |
| 36 | Filling the soak pit with 63/65mm metal as per specification |
| 37 | Soakpit bottom 2nd layer |
| 38 | Filling the soak pit with 20mm metal as per specification |
| 39 | Soakpit bottom 3rd layer |
| 40 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 41 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 42 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 43 | 4.Construction of Community soak pit @ Valliammapet Village 30000 Litre OHT in Ramanjeri Panchayat |
| 44 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 45 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 46 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 47 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 48 | Filling the soak pit with 225 mm boulders as per specification |
| 49 | Soakpit Bottom 1st layer |
| 50 | Filling the soak pit with 63/65mm metal as per specification |
| 51 | Soakpit bottom 2nd layer |
| 52 | Filling the soak pit with 20mm metal as per specification |
| 53 | Soakpit bottom 3rd layer |
| 54 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 55 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 56 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 57 | 5.Construction of Community soak pit @ Maduramettupalayam in Thommur Panchayat |
| 58 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 59 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 60 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 61 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 62 | Filling the soak pit with 225 mm boulders as per specification |
| 63 | Soakpit Bottom 1st layer |
| 64 | Filling the soak pit with 63/65mm metal as per specification |
| 65 | Soakpit bottom 2nd layer |
| 66 | Filling the soak pit with 20mm metal as per specification |
| 67 | Soakpit bottom 3rd layer |
| 68 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 69 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 70 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 71 | 6.Construction of Community soak pit @ Main Road Library in Thommur Panchayat |
| 72 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 73 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 74 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 75 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 76 | Filling the soak pit with 225 mm boulders as per specification |
| 77 | Soakpit Bottom 1st layer |
| 78 | Filling the soak pit with 63/65mm metal as per specification |
| 79 | Soakpit bottom 2nd layer |
| 80 | Filling the soak pit with 20mm metal as per specification |
| 81 | Soakpit bottom 3rd layer |
| 82 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 83 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 84 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 85 | 7.Construction of Community soak pit @ Main road near PUES in Thommur Panchayat |
| 86 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 87 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 88 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 89 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 90 | Filling the soak pit with 225 mm boulders as per specification |
| 91 | Soakpit Bottom 1st layer |
| 92 | Filling the soak pit with 63/65mm metal as per specification |
| 93 | Soakpit bottom 2nd layer |
| 94 | Filling the soak pit with 20mm metal as per specification |
| 95 | Soakpit bottom 3rd layer |
| 96 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 97 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 98 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 99 | 8.Construction of Community soak pit @ SC Colony in Thommur Panchayat |
| 100 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 101 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 102 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 103 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 104 | Filling the soak pit with 225 mm boulders as per specification |
| 105 | Soakpit Bottom 1st layer |
| 106 | Filling the soak pit with 63/65mm metal as per specification |
| 107 | Soakpit bottom 2nd layer |
| 108 | Filling the soak pit with 20mm metal as per specification |
| 109 | Soakpit bottom 3rd layer |
| 110 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 111 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 112 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 113 | 9.Construction of Community soak pit @ Village OHT sivan kovil main road 2/ 3 in Thommur Panchayat |
| 114 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 115 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 116 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 117 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 118 | Filling the soak pit with 225 mm boulders as per specification |
| 119 | Soakpit Bottom 1st layer |
| 120 | Filling the soak pit with 63/65mm metal as per specification |
| 121 | Soakpit bottom 2nd layer |
| 122 | Filling the soak pit with 20mm metal as per specification |
| 123 | Soakpit bottom 3rd layer |
| 124 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 125 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 126 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 127 | 10.Construction of Community soak pit @ Village OHT sivan kovil main road 3/ 3 in Thommur Panchayat |
| 128 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 129 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 130 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 131 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 132 | Filling the soak pit with 225 mm boulders as per specification |
| 133 | Soakpit Bottom 1st layer |
| 134 | Filling the soak pit with 63/65mm metal as per specification |
| 135 | Soakpit bottom 2nd layer |
| 136 | Filling the soak pit with 20mm metal as per specification |
| 137 | Soakpit bottom 3rd layer |
| 138 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 139 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 140 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 141 | 11.Construction of Community soak pit @ Irular Colony OHT in Thommur Panchayat |
| 142 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 143 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 144 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 145 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 146 | Filling the soak pit with 225 mm boulders as per specification |
| 147 | Soakpit Bottom 1st layer |
| 148 | Filling the soak pit with 63/65mm metal as per specification |
| 149 | Soakpit bottom 2nd layer |
| 150 | Filling the soak pit with 20mm metal as per specification |
| 151 | Soakpit bottom 3rd layer |
| 152 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 153 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 154 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 155 | 12.Construction of Community soak pit @ Thiruppair Colony in Thiruppair Panchayat |
| 156 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 157 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 158 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 159 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 160 | Filling the soak pit with 225 mm boulders as per specification |
| 161 | Soakpit Bottom 1st layer |
| 162 | Filling the soak pit with 63/65mm metal as per specification |
| 163 | Soakpit bottom 2nd layer |
| 164 | Filling the soak pit with 20mm metal as per specification |
| 165 | Soakpit bottom 3rd layer |
| 166 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 167 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 168 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 169 | 13.Construction of Community soak pit @ Neiveli Village OHT in Neiveli Panchayat |
| 170 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 171 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 172 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 173 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 174 | Filling the soak pit with 225 mm boulders as per specification |
| 175 | Soakpit Bottom 1st layer |
| 176 | Filling the soak pit with 63/65mm metal as per specification |
| 177 | Soakpit bottom 2nd layer |
| 178 | Filling the soak pit with 20mm metal as per specification |
| 179 | Soakpit bottom 3rd layer |
| 180 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 181 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 182 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 183 | 14.Construction of Community soak pit @ Odappai Village OHT 30000 lit in Odappai Panchayat |
| 184 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 185 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 186 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 187 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 188 | Filling the soak pit with 225 mm boulders as per specification |
| 189 | Soakpit Bottom 1st layer |
| 190 | Filling the soak pit with 63/65mm metal as per specification |
| 191 | Soakpit bottom 2nd layer |
| 192 | Filling the soak pit with 20mm metal as per specification |
| 193 | Soakpit bottom 3rd layer |
| 194 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 195 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 196 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 197 | 15.Construction of Community soak pit @ Monnavedupettai OHT in Monnavedu Panchayat |
| 198 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 199 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 200 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 201 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 202 | Filling the soak pit with 225 mm boulders as per specification |
| 203 | Soakpit Bottom 1st layer |
| 204 | Filling the soak pit with 63/65mm metal as per specification |
| 205 | Soakpit bottom 2nd layer |
| 206 | Filling the soak pit with 20mm metal as per specification |
| 207 | Soakpit bottom 3rd layer |
| 208 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 209 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 210 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 211 | 16.Construction of Community soak pit @ Gurupuram OHT 30000 lit in Meyyur Panchayat |
| 212 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 213 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 214 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 215 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 216 | Filling the soak pit with 225 mm boulders as per specification |
| 217 | Soakpit Bottom 1st layer |
| 218 | Filling the soak pit with 63/65mm metal as per specification |
| 219 | Soakpit bottom 2nd layer |
| 220 | Filling the soak pit with 20mm metal as per specification |
| 221 | Soakpit bottom 3rd layer |
| 222 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 223 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 224 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 225 | 17.Construction of Community soak pit @ Meyyur Village OHT 30000 lit in Meyyur Panchayat |
| 226 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 227 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 228 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 229 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 230 | Filling the soak pit with 225 mm boulders as per specification |
| 231 | Soakpit Bottom 1st layer |
| 232 | Filling the soak pit with 63/65mm metal as per specification |
| 233 | Soakpit bottom 2nd layer |
| 234 | Filling the soak pit with 20mm metal as per specification |
| 235 | Soakpit bottom 3rd layer |
| 236 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 237 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 238 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 239 | 18.Construction of Community soak pit @ Rajapalayam OHT 30000 lit in Meyyur Panchayat |
| 240 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) |
| 241 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 242 | Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc |
| 243 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 244 | Filling the soak pit with 225 mm boulders as per specification |
| 245 | Soakpit Bottom 1st layer |
| 246 | Filling the soak pit with 63/65mm metal as per specification |
| 247 | Soakpit bottom 2nd layer |
| 248 | Filling the soak pit with 20mm metal as per specification |
| 249 | Soakpit bottom 3rd layer |
| 250 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 251 | Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc., |
| 252 | Filling of Metal aggregate in the soakpit including the labour charges etc, completed |
| 253 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.