Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #58289888

Tender For Construction Of Community Soak Pit In Poondi Block Package03

Issued by Local Bodies · Thiruvallur, Tamil Nadu
Tender Value
4.32 Lakhs
Estimated cost
Bid Submission
16 Nov 2026
0 days left
EMD
4500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of Community Soak Pit In Poondi Block Package03

BOQ

Name of Work:-
Sl. No. Item Description
11.Construction of Community soak pit @ Ramanjeri Mettu Colony 30000 Litre OHT in Ramanjeri Panchayat
2Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
3Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
4Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
5Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
6Filling the soak pit with 225 mm boulders as per specification
7Soakpit Bottom 1st layer
8Filling the soak pit with 63/65mm metal as per specification
9Soakpit bottom 2nd layer
10Filling the soak pit with 20mm metal as per specification
11Soakpit bottom 3rd layer
12Supply of 0.60m dia cement tank with top cover including cost etc.,
13Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
14Filling of Metal aggregate in the soakpit including the labour charges etc, completed
152.Construction of Community soak pit @ Ramanjeri ST Colony 30000 Litre OHT in Ramanjeri Panchayat
16Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
17Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
18Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
19Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
20Filling the soak pit with 225 mm boulders as per specification
21Soakpit Bottom 1st layer
22Filling the soak pit with 63/65mm metal as per specification
23Soakpit bottom 2nd layer
24Filling the soak pit with 20mm metal as per specification
25Soakpit bottom 3rd layer
26Supply of 0.60m dia cement tank with top cover including cost etc.,
27Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
28Filling of Metal aggregate in the soakpit including the labour charges etc, completed
293.Construction of Community soak pit @ Valliammapet SC Colony 10000 Litre OHT in Ramanjeri Panchayat
30Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
31Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
32Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
33Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
34Filling the soak pit with 225 mm boulders as per specification
35Soakpit Bottom 1st layer
36Filling the soak pit with 63/65mm metal as per specification
37Soakpit bottom 2nd layer
38Filling the soak pit with 20mm metal as per specification
39Soakpit bottom 3rd layer
40Supply of 0.60m dia cement tank with top cover including cost etc.,
41Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
42Filling of Metal aggregate in the soakpit including the labour charges etc, completed
434.Construction of Community soak pit @ Valliammapet Village 30000 Litre OHT in Ramanjeri Panchayat
44Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
45Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
46Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
47Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
48Filling the soak pit with 225 mm boulders as per specification
49Soakpit Bottom 1st layer
50Filling the soak pit with 63/65mm metal as per specification
51Soakpit bottom 2nd layer
52Filling the soak pit with 20mm metal as per specification
53Soakpit bottom 3rd layer
54Supply of 0.60m dia cement tank with top cover including cost etc.,
55Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
56Filling of Metal aggregate in the soakpit including the labour charges etc, completed
575.Construction of Community soak pit @ Maduramettupalayam in Thommur Panchayat
58Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
59Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
60Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
61Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
62Filling the soak pit with 225 mm boulders as per specification
63Soakpit Bottom 1st layer
64Filling the soak pit with 63/65mm metal as per specification
65Soakpit bottom 2nd layer
66Filling the soak pit with 20mm metal as per specification
67Soakpit bottom 3rd layer
68Supply of 0.60m dia cement tank with top cover including cost etc.,
69Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
70Filling of Metal aggregate in the soakpit including the labour charges etc, completed
716.Construction of Community soak pit @ Main Road Library in Thommur Panchayat
72Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
73Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
74Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
75Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
76Filling the soak pit with 225 mm boulders as per specification
77Soakpit Bottom 1st layer
78Filling the soak pit with 63/65mm metal as per specification
79Soakpit bottom 2nd layer
80Filling the soak pit with 20mm metal as per specification
81Soakpit bottom 3rd layer
82Supply of 0.60m dia cement tank with top cover including cost etc.,
83Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
84Filling of Metal aggregate in the soakpit including the labour charges etc, completed
857.Construction of Community soak pit @ Main road near PUES in Thommur Panchayat
86Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
87Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
88Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
89Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
90Filling the soak pit with 225 mm boulders as per specification
91Soakpit Bottom 1st layer
92Filling the soak pit with 63/65mm metal as per specification
93Soakpit bottom 2nd layer
94Filling the soak pit with 20mm metal as per specification
95Soakpit bottom 3rd layer
96Supply of 0.60m dia cement tank with top cover including cost etc.,
97Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
98Filling of Metal aggregate in the soakpit including the labour charges etc, completed
998.Construction of Community soak pit @ SC Colony in Thommur Panchayat
100Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
101Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
102Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
103Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
104Filling the soak pit with 225 mm boulders as per specification
105Soakpit Bottom 1st layer
106Filling the soak pit with 63/65mm metal as per specification
107Soakpit bottom 2nd layer
108Filling the soak pit with 20mm metal as per specification
109Soakpit bottom 3rd layer
110Supply of 0.60m dia cement tank with top cover including cost etc.,
111Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
112Filling of Metal aggregate in the soakpit including the labour charges etc, completed
1139.Construction of Community soak pit @ Village OHT sivan kovil main road 2/ 3 in Thommur Panchayat
114Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
115Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
116Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
117Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
118Filling the soak pit with 225 mm boulders as per specification
119Soakpit Bottom 1st layer
120Filling the soak pit with 63/65mm metal as per specification
121Soakpit bottom 2nd layer
122Filling the soak pit with 20mm metal as per specification
123Soakpit bottom 3rd layer
124Supply of 0.60m dia cement tank with top cover including cost etc.,
125Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
126Filling of Metal aggregate in the soakpit including the labour charges etc, completed
12710.Construction of Community soak pit @ Village OHT sivan kovil main road 3/ 3 in Thommur Panchayat
128Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
129Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
130Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
131Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
132Filling the soak pit with 225 mm boulders as per specification
133Soakpit Bottom 1st layer
134Filling the soak pit with 63/65mm metal as per specification
135Soakpit bottom 2nd layer
136Filling the soak pit with 20mm metal as per specification
137Soakpit bottom 3rd layer
138Supply of 0.60m dia cement tank with top cover including cost etc.,
139Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
140Filling of Metal aggregate in the soakpit including the labour charges etc, completed
14111.Construction of Community soak pit @ Irular Colony OHT in Thommur Panchayat
142Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
143Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
144Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
145Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
146Filling the soak pit with 225 mm boulders as per specification
147Soakpit Bottom 1st layer
148Filling the soak pit with 63/65mm metal as per specification
149Soakpit bottom 2nd layer
150Filling the soak pit with 20mm metal as per specification
151Soakpit bottom 3rd layer
152Supply of 0.60m dia cement tank with top cover including cost etc.,
153Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
154Filling of Metal aggregate in the soakpit including the labour charges etc, completed
15512.Construction of Community soak pit @ Thiruppair Colony in Thiruppair Panchayat
156Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
157Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
158Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
159Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
160Filling the soak pit with 225 mm boulders as per specification
161Soakpit Bottom 1st layer
162Filling the soak pit with 63/65mm metal as per specification
163Soakpit bottom 2nd layer
164Filling the soak pit with 20mm metal as per specification
165Soakpit bottom 3rd layer
166Supply of 0.60m dia cement tank with top cover including cost etc.,
167Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
168Filling of Metal aggregate in the soakpit including the labour charges etc, completed
16913.Construction of Community soak pit @ Neiveli Village OHT in Neiveli Panchayat
170Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
171Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
172Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
173Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
174Filling the soak pit with 225 mm boulders as per specification
175Soakpit Bottom 1st layer
176Filling the soak pit with 63/65mm metal as per specification
177Soakpit bottom 2nd layer
178Filling the soak pit with 20mm metal as per specification
179Soakpit bottom 3rd layer
180Supply of 0.60m dia cement tank with top cover including cost etc.,
181Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
182Filling of Metal aggregate in the soakpit including the labour charges etc, completed
18314.Construction of Community soak pit @ Odappai Village OHT 30000 lit in Odappai Panchayat
184Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
185Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
186Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
187Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
188Filling the soak pit with 225 mm boulders as per specification
189Soakpit Bottom 1st layer
190Filling the soak pit with 63/65mm metal as per specification
191Soakpit bottom 2nd layer
192Filling the soak pit with 20mm metal as per specification
193Soakpit bottom 3rd layer
194Supply of 0.60m dia cement tank with top cover including cost etc.,
195Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
196Filling of Metal aggregate in the soakpit including the labour charges etc, completed
19715.Construction of Community soak pit @ Monnavedupettai OHT in Monnavedu Panchayat
198Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
199Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
200Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
201Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
202Filling the soak pit with 225 mm boulders as per specification
203Soakpit Bottom 1st layer
204Filling the soak pit with 63/65mm metal as per specification
205Soakpit bottom 2nd layer
206Filling the soak pit with 20mm metal as per specification
207Soakpit bottom 3rd layer
208Supply of 0.60m dia cement tank with top cover including cost etc.,
209Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
210Filling of Metal aggregate in the soakpit including the labour charges etc, completed
21116.Construction of Community soak pit @ Gurupuram OHT 30000 lit in Meyyur Panchayat
212Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
213Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
214Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
215Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
216Filling the soak pit with 225 mm boulders as per specification
217Soakpit Bottom 1st layer
218Filling the soak pit with 63/65mm metal as per specification
219Soakpit bottom 2nd layer
220Filling the soak pit with 20mm metal as per specification
221Soakpit bottom 3rd layer
222Supply of 0.60m dia cement tank with top cover including cost etc.,
223Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
224Filling of Metal aggregate in the soakpit including the labour charges etc, completed
22517.Construction of Community soak pit @ Meyyur Village OHT 30000 lit in Meyyur Panchayat
226Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
227Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
228Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
229Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
230Filling the soak pit with 225 mm boulders as per specification
231Soakpit Bottom 1st layer
232Filling the soak pit with 63/65mm metal as per specification
233Soakpit bottom 2nd layer
234Filling the soak pit with 20mm metal as per specification
235Soakpit bottom 3rd layer
236Supply of 0.60m dia cement tank with top cover including cost etc.,
237Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
238Filling of Metal aggregate in the soakpit including the labour charges etc, completed
23918.Construction of Community soak pit @ Rajapalayam OHT 30000 lit in Meyyur Panchayat
240Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam)
241Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
242Brick work in cement mortar 1:5 mix Using country bricks 83/4\\"x41/4\\"x23/4\\"including cost and conveyance of all materials to site and all labour charges etc
243Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
244Filling the soak pit with 225 mm boulders as per specification
245Soakpit Bottom 1st layer
246Filling the soak pit with 63/65mm metal as per specification
247Soakpit bottom 2nd layer
248Filling the soak pit with 20mm metal as per specification
249Soakpit bottom 3rd layer
250Supply of 0.60m dia cement tank with top cover including cost etc.,
251Supply of PVC pipes 50mm dia including necessary joints for inspection chamber to the soak pit etc.,
252Filling of Metal aggregate in the soakpit including the labour charges etc, completed
253GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58289888
AUTHORITY Local Bodies
TENDER VALUE 4.32 Lakhs
LAST DATE 16-11-2026
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender for Construction Of Community Soak Pit In Poondi Block Package03
Basic Detail
Tender No 513/2022/A9
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 30 Oct 2026
Submission Date 16 Nov 2026
Open Date 16 Nov 2026
Finance
Tender Value 4.32 Lakhs
Tender Fee Ref. Documents
EMD 4500
Exemption Available
Document List
26536662-8bee-458c-9f44-da924f3b2467.html
BOQ_864618.xls
TenderDocumentPND003.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

26536662-8bee-458c-9f44-da924f3b2467.html

xls

BOQ_864618.xls

pdf

TenderDocumentPND003.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender