Housing Urban and Rular Development Government Departments Closing in 12 days TDR #58287362

Tender For New Construction Work Of Talepur To Dehli Khurd (Shiva Temple) In Aligarh District

Issued by Government Departments · Aligarh, Uttar Pradesh
Tender Value
1.96 Crore
Estimated cost
Bid Submission
12 Nov 2026
12 days left
EMD
11.90 Lakhs
Bank guarantee accepted
Document Fee
2354
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Aligarh → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for New Construction Work Of Talepur To Dehli Khurd (Shiva Temple) In Aligarh District

BOQ

Name of Work:- New construction work of Talepur to Dehli Khurd (Shiva Temple) in Aligarh district
Sl. No. Item Description
1Part-A (Bituminious work)Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Local Earth) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
2Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compecting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
3Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the place with rotavator and compecting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
4Providing and applying Tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
5Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
6Providing, laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification Clause 510 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
7Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Local Earth) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
8Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
9Kilometre StoneReinforced cement concret M-15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical specification cluase 1703 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
10Hectometer StoneReinforced cement concret M-15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical specification cluase 1703 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
11Part-B (Culvert & Sign Board work)Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
12Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M 10) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
13Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
14Supply, laying and fixing of 350 mm dia NP-4 class hume pipes in proper position in culvert & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
15Supply, laying and fixing of 600 mm dia NP-4 class hume pipes in proper position in culvert & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
16Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
17Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
18White washing with lime on undecorated wall surfaces (Three coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters.. as per DSR 13.37.1. & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
19Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (As per Mord Sl. 11.1) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
20Sand Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9. (As per Mord Sl.No. 11.2) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
21Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (P.C.C grade M 15) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
22Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 800&1200 (P.C.C grade M 20) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
23Providing and laying reinforced cement concrete in foundation as per drawing and technical specifications Clauses 800 & 1200(V) (R.C.C grade M 25) (As per Mord Sl.No. 11.4) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
24Providing and laying reinforced cement concrete in sub-structure as per drawing and technical specifications Clauses 800 (R.C.C grade M 25) (As per Mord Sl.No. 12.5) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
25Providing and laying reinforced cement concrete in Super structure as per drawing and technical specifications Clauses 800 (R.C.C grade M 25) Sl. 13.1(ii) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
26Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211. (As per Mord Sl. 13.12) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
27Providing and laying cement concrete wearing course M-30 grade excluding reinforcement complete as per drawing and technical specification clause 800 and 1206.3 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
28Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
29Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
30Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
31Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (As per Mord Sl.No. 12.9) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
32Drainage spouts complete as per drawing and technical specifications Clause 1209 (As per Mord Sl.No. 13.10) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
33Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (As per Mord Sl.No. 12.10) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
34Dewatering work of undergroung water as well as surface water with the help of diesel engine pumping set during earth work in excavation of foundation for laying lean concrete and brick work in foundation including cost of Boring charges @ 5 mtr c/c distance (or as required), hire chargeg of pumping set, fuel charges, labour and other T&P including cost of operation as per requierment at site (As per MORT&H) & as directed by the Engineer-in-charge & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
35DIVERSION WORKConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
36Supply, laying and fixing of 900 mm dia NP-4 class hume pipes in proper position & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
37PROTECTION WORKProviding and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification No. 2504 (15.5) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
38Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications No. 2504 (15.4) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
39Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 (As Per Mord Sl. 14.1) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
40Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
41Brick work with Common burnt clay and cement & coarse sand mortar in proportion of 1:3 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
4212 mm thick plaster on brick work with cement & coarse sand in proportion of 1:4. as per & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
43Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
44Part-A) Routine Maintenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)1-1st Year @ Nill
452nd Year @ 0.75%
463rd Year @ 1.50%
474th Year @ 2.25%
485th Year @ 3.00% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58287362
AUTHORITY Government Departments
TENDER VALUE 1.96 Crore
LAST DATE 12-11-2026
Authority
Authority Name Public Works Department
Work Description Tender for New Construction Work Of Talepur To Dehli Khurd (Shiva Temple) In Aligarh District
Basic Detail
Tender No 5961-Cashier(P.D.A)-26-27 Dt- 22-10-2026
Bidding Type Tender
Location
City Aligarh
State Uttar Pradesh
Key Dates
Publish Date 30 Oct 2026
Submission Date 12 Nov 2026
Open Date 12 Nov 2026
Finance
Tender Value 1.96 Crore
Tender Fee 2354
EMD 11.90 Lakhs
Exemption Available
Document List
aba9a602-2117-46e0-ac53-73ebb28f6457.html
BOQ_2277498.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 30, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Nov 12, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

aba9a602-2117-46e0-ac53-73ebb28f6457.html

xls

BOQ_2277498.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender