Tender For Short Term Maintenance Contract (Stmc) Work In National Highway Division, Bengaluru For The Stretch From Km.265.800 To Km.287.500 Of Nh-209 (New Nh-948) Chamarajanagar To T.N. Border Section (Bengaluru-Dindigul Section) In The State Of Kar
Tender Overview
Project Description
Tender for Short Term Maintenance Contract (Stmc) Work In National Highway Division, Bengaluru For The Stretch From Km.265.800 To Km.287.500 Of Nh-209 (New Nh-948) Chamarajanagar To T.N. Border Section (Bengaluru-Dindigul Section) In The State Of Karnataka (Job. No.Nh-948-Knt-Bng-Stmc-2026-27-63).
BOQ
| Sl. No. | Item Description |
| 1 | BILL 1 ROAD MAINTANANCE |
| 2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Average filling depth 150 mm), including all labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete. |
| 3 | Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 1000 metres including all lead, lifts, all labour, usage charges of all machinery etc., complete. |
| 4 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries with all lead and lift etc., complete as per the direction of Engineer-in-Charge of work (For new road) - In area of light jungle by Mechanical means. |
| 5 | Providing treatment to bleeding bituminous surface by uniform spreading of crusher dusk other fine graded material as per Clause 3004.4 of Technical Specifications SAM crack wiidth less than 6mm complete in all respects and as per direction of Engineer-ln Charge |
| 6 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm thick. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, all labour, usage charges of machinery, lead, lifts, loading, unloading stacking,transporting etc., complete exepet lead for bitumen & emulsion. Grading II 13mm (Nominal size) and other items mentioned in Clause 3 of Section 7 of comtract agreement. |
| 7 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete.(P.No.108, I.No.8.08,NHSR, B'luru 2022-23) |
| 8 | Bill -2 ROAD PROPERTY MAINTANANCE |
| 9 | Removal of unserviceable soil including excavation, loading and disposal excluding repalcement by suitable soil which shall be paid separately as per clause 305 including all labour, load unload usage charges of all machineries etc., complete..As per the directions of Engineer-in charge of work (NHSR Bangalore Circle 2022-23 Item No-3.11, Page No-18) |
| 10 | BILL-3 ROUTINE MAINTANANCE OF PAVEMENT REPAIRE &ROAD |
| 11 | Routine Maintenance of road assets and pavement as given below:(i) Clearing and grubbing road land(ii) Repair of potholes/edge cuts/ruts/ patches (iii) Carrying out cleaning, removing of dust/silt/thrash from carriageway.(iv) Cleaning, clearing and repairing roadside open/unlined/lined/covered drains and cross drainage works(v) maintenance of road signs and delineatorsFrom Km 265.800 to 287.50 of NH-209(948) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender