Tender For New Construction Work Of Remaining Part Of Pahretha To Rehuniya Bihari Road
Tender Overview
Project Description
Tender for New Construction Work Of Remaining Part Of Pahretha To Rehuniya Bihari Road
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 05-Nov-2026 | Date | Date | 13-Nov-2026 |
| 2 | 13-Nov-2026 | Date-Extended | Date | 21-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and Grubbing road land incluiding urooting wild vegetation grass, bushes, shrubs, saplings and trees of girth up to 300mm romoval of strumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per SOR Ch 4 Item 259 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) |
| 3 | Blenket coatConstruction of granular surface Course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80 100 kn static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means |
| 6 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixture as approved curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clauser 1501 |
| 7 | Construction of sab grade and earthen shoulders Construction of sab grade and earthen shoulders with approved material obtained from borrow pits with a lift & lead, transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.2 with a lead up to 1000 meter as per technical specification clause 303.1 (patri) |
| 8 | Reinforced cement concrete M20 grade kilometre stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 |
| 9 | Reinforced cement concrete M20 grade Hectometer stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 |
| 10 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stups and other deleterious material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 11 | Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 / 1. Sand filling |
| 12 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 / Rate as per item No.11.4 of Chapter 11 |
| 13 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / (B) 1000 mm dia |
| 14 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / III. P.C.C. grade M20 (Mechanical mix) / (i) Nominal mix (1:2:4) |
| 15 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 / II. Coursed rubble masonry (2nd sort) / (ii) In 1:4 cement mortar |
| 16 | Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification / Rate as per item No.12.3 of Chapter 12 |
| 17 | Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 / Rate as per item No.12.2 of Chapter 12 |
| 18 | R.C.C. grade M 25Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (RCC 1:2:4) |
| 19 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Substructrue complete as per drawing and Technical Specifications Clauses1002,1005, 1010 and 1202 |
| 20 | Providing weep holes in Brick asonry/ plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV:20H towards drawing face. Complete as per drawing and Technical specifications |
| 21 | Maintenance Charge including @ repair of C.C. surface, culvert etc.as direction of E.I for the period of five years from the actual completion of work. Total of work Amount 1 to 20(Excluding G.S.T.)Maintenance of First Year @0.00 % of total work amount of 1 to 20) |
| 22 | Maintenance Charge including @ repair of C.C. surface, culvert etc.as direction of E.I for the period of five years from the actual completion of work. Total of work Amount 1 to 20(Excluding G.S.T.)Maintenance of Second Year @0.25 % of total work amount of 1 to 20) |
| 23 | Maintenance Charge including @ repair of C.C. surface, culvert etc.as direction of E.I for the period of five years from the actual completion of work. Total of work Amount 1 to 20(Excluding G.S.T.)Maintenance of Thard Year @0.50 % of total work amount of 1 to 20) |
| 24 | Maintenance Charge including @ repair of C.C. surface, culvert etc.as direction of E.I for the period of five years from the actual completion of work. Total of work Amount 1 to 20(Excluding G.S.T.)Maintenance of Fourth Year @0.75 % of total work amount of 1 to 20) |
| 25 | Maintenance Charge including @ repair of C.C. surface, culvert etc.as direction of E.I for the period of five years from the actual completion of work. Total of work Amount 1 to 20(Excluding G.S.T.)Maintenance of Fifth Year @1.00 % of total work amount of 1 to 20) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender