Tender For Construction Of Lis Seri Talla (Chaknobad) Under Nabard
Tender Value
1.65 Crore
Estimated cost
Bid Submission
16 Nov 2026
14 days left
EMD
3.31 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Rajouri → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of Lis Seri Talla (Chaknobad) Under Nabard-Selection Of Private Partners For Oem Of Pmbjk At Anantapur Rh Under Ppp Mode, Purba Medinipur
BOQ
| Sl. No. | Item Description |
| 1 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedAll kinds of soil : Avg. Width (1.4+1.7)/2 = 1.55 m |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 7 | Carriage of material for avg. 21 km by MT and 300m by Head Load. |
| 8 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedAll kinds of soil : Qty (1.3+1.7)/2 = 1.5m |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 14 | Carriage of material for avg. 21 km by MT and 300m by Head Load. |
| 15 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 16 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedAll kinds of soil :(1.5+1.1) / 2 = 0.8 m |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 18 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 19 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 21 | Carriage of material for avg. 21 km by MT and 300m by Head Load. |
| 22 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 23 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters 40% All kinds of soil : 60% Hard Rock (Blasting Prohibited)Qty. 1 x 5x 3x0.75 =11.25 cum @1679.65/cum |
| 24 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 25 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 26 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 27 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars |
| 28 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. |
| 29 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 30 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 3 ( 1 cement : 3 fine sand) |
| 31 | Carriage of sand and bajree for avg. 21 km by MT and 300m by Head Load. Qty. = 25.66 cum @ 840.10/cum |
| 32 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 33 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters 40% All kinds of soil : 60% Hard Rock (Blasting Prohibited)Qty. 1.10+1.30/2 x0.20x180=43.20 |
| 34 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 35 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. |
| 36 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars |
| 37 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. |
| 38 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 3 ( 1 cement : 3 fine sand) |
| 39 | Carriage of sand and bajree for avg. 21 km by MT and 300m by Head Load. Qty. = 25.66 cum @ 840.10/cum |
| 40 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD |
| 41 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) |
| 42 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |
| 43 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : Of area beyond 3 sqm. |
| 44 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate |
| 45 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 46 | CEMENT PLASTER (IN FINE SAND)12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 47 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.1 Foundations, footings, bases for columns |
| 48 | Providing MS steel angles in frames of doors, windows, celerestory windows and other frames, wrought framed and fixed in position. (LMR) = 300Kg |
| 49 | White washing with lime to give an even shade on New Work (three or more coats) |
| 50 | Carriage of sand and bajree for avg. 21 km by MT and 300m by Head Load. Qty. = 25.66 cum @ 840.10/cum |
| 51 | Construction of L.I.S Seri Talla (Chaknobad) under NABARD (10 Tractor Crossings) |
| 52 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil |
| 53 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 54 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 55 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars |
| 56 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 57 | Foundations, footings, bases of columns etc for mass concrete |
| 58 | T-Xings |
| 59 | Carriage of sand and bajree for avg. 25 km by MT and 300m by Head Load. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 30, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysNov 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender