Defence Government Departments Closing in 17 days TDR #58275610

Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For Removal Replacement Of Gtg Tc Onboard In Ships; Any Other Suitable Brand; No; Buyer Premises - Degutting Of Hi Casings , Degutting Of System Lines , Shifting Of Chain-

Issued by Government Departments · Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Nov 2026
17 days left
EMD
4.20 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For Removal Replacement Of Gtg Tc Onboard In Ships; Any Other Suitable Brand; No; Buyer Premises - Degutting Of Hi Casings , Degutting Of System Lines , Shifting Of Chain-Blocks From Shop-Floor To Ship , Placement Of Chain-Blocks Inside Engine Room , Shifting Of Lifting Slings From Shop-Floor To Ship , Placement Of Lifting Slings Inside Engine Room , Removal Of Combustion Chamber , Degutting, Removal And Stowage Of Exhaust Branch Pipe , Degutting, Removal And Stowage Of Intake Branch Pipe , Removal Of Compressor Top Stator , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Main Air Intake Distance Piece Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Compensator Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Pipe Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Conical Ring Of Exhaust System Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Compensator Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Pipe Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 2Nd Exhaust System Compensator Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 2Nd Exhaust System Pipe Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – De-Icing System Pipes Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Breather System Pipes Of Gt. , Lifting & Shifting Combustion Chamber Ship To Jetty To Shop Floor. , Lifting & Shifting Exhaust Branch Pipe Ship To Jetty To Shop Floor. , Lifting & Shifting Suction Branch Pipe Ship To Jetty To Shop Floor. , Lifting & Shifting Gtg Tc Ship To Jetty To Shop Floor , Mechanical Cleaning Of Gtg Bed And Surrounding Area Prior Gtg Lowering , Assemble Of Old Gtg Tc In Shopfloor (Exhaust Duct And Suction Branch Pipe) , Mechanical Cleaning Of Gtg And Surrounding Area During Installation Of Gtgs , Dis-Assemble Of New Gtg Tc In Shopfloor (Exhaust Duct And Suction Branch Pipe) , Shifting & Lowering New Gtg Tc Ship To Jetty To Shop Floor. , Shifting & Lowering Suction Branch Pipe Ship To Jetty To Shop Floor. , Shifting & Lowering Exhaust Branch Pipe Ship To Jetty To Shop Floor. , Shifting & Lowering Combustion Chamber Ship To Jetty To Shop Floor. , Removal Of Lifting Slings Inside Engine Room , Shifting Of Lifting Slings From Ship To Shop-Floor , Removal Of Chain-Blocks From Engine Room , Shifting Of Chain-Blocks From Ship To Shop-Floor , Shifting Of Alignment Tools To Ship , Fitment Of Air Intake Branch Pipe , Fitment Of Exhaust Branch Pipe , Jack Bolt Alignment And Offering , 3 Pt Alignment And Offering , Fitment Of Combustion Chamber , Free Alignment And Offering , Final Alignment And Offering , Removal Of Alignment Tools From Ship , Fitment Of System Pipelines , Assistance For Trials

BOQ

Sl. No. Item TitleItem Description
1Degutting of HI casingsDegutting of HI casings
2Degutting of system linesDegutting of system lines
3Shifting of Chain-blocks from Shop-floor to shipShifting of Chain-blocks from Shop-floor to ship
4Placement of Chain-blocks inside Engine RoomPlacement of Chain-blocks inside Engine Room
5Shifting of Lifting slings from Shop-floor to shipShifting of Lifting slings from Shop-floor to ship
6Placement of Lifting slings inside Engine RoomPlacement of Lifting slings inside Engine Room
7Removal of combustion chamberRemoval of combustion chamber
8Degutting, removal and stowage of exhaust branch pipeDegutting, removal and stowage of exhaust branch pipe
9Degutting, removal and stowage of Intake branch pipeDegutting, removal and stowage of Intake branch pipe
10Removal of compressor Top statorRemoval of compressor Top stator
11De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Main air intake distance piece of GTG.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Main air intake distance piece of GTG.
12De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system compensator of GTG.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system compensator of GTG.
13De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system pipe of GTG.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system pipe of GTG.
14De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Conical ring of Exhaust system of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Conical ring of Exhaust system of GT.
15De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system compensator of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system compensator of GT.
16De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system pipe of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 1st exhaust system pipe of GT.
17De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 2nd exhaust system compensator of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 2nd exhaust system compensator of GT.
18De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 2nd exhaust system pipe of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – 2nd exhaust system pipe of GT.
19De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – De-icing system pipes of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – De-icing system pipes of GT.
20De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Breather system pipes of GT.De-gutting (removal of studs/ bolts), Shifting from ship to shop-floor, Shifting from shop-floor to ship and Re-gutting (fitment of studs/bolts) – Breather system pipes of GT.
21Lifting & Shifting Combustion Chamber Ship to Jetty to Shop floor.Lifting & Shifting Combustion Chamber Ship to Jetty to Shop floor.
22Lifting & Shifting Exhaust Branch Pipe Ship to Jetty to Shop floor.Lifting & Shifting Exhaust Branch Pipe Ship to Jetty to Shop floor.
23Lifting & Shifting Suction Branch Pipe Ship to Jetty to Shop floor.Lifting & Shifting Suction Branch Pipe Ship to Jetty to Shop floor.
24Lifting & Shifting GTG TC Ship to Jetty to Shop floorLifting & Shifting GTG TC Ship to Jetty to Shop floor
25Mechanical cleaning of GTG bed and surrounding area prior GTG loweringMechanical cleaning of GTG bed and surrounding area prior GTG lowering
26Assemble of Old GTG TC in shopfloor (Exhaust Duct and Suction Branch Pipe)Assemble of Old GTG TC in shopfloor (Exhaust Duct and Suction Branch Pipe)
27Mechanical cleaning of GTG and surrounding area during Installation of GTGsMechanical cleaning of GTG and surrounding area during Installation of GTGs
28Dis-Assemble of New GTG TC in shopfloor (Exhaust Duct and Suction Branch Pipe)Dis-Assemble of New GTG TC in shopfloor (Exhaust Duct and Suction Branch Pipe)
29Shifting & Lowering New GTG TC Ship to Jetty to Shop floor.Shifting & Lowering New GTG TC Ship to Jetty to Shop floor.
30Shifting & Lowering Suction Branch Pipe Ship to Jetty to Shop floor.Shifting & Lowering Suction Branch Pipe Ship to Jetty to Shop floor.
31Shifting & Lowering Exhaust Branch Pipe Ship to Jetty to Shop floor.Shifting & Lowering Exhaust Branch Pipe Ship to Jetty to Shop floor.
32Shifting & Lowering Combustion Chamber Ship to Jetty to Shop floor.Shifting & Lowering Combustion Chamber Ship to Jetty to Shop floor.
33Removal of Lifting slings inside Engine RoomRemoval of Lifting slings inside Engine Room
34Shifting of Lifting slings from ship to Shop-floorShifting of Lifting slings from ship to Shop-floor
35Removal of Chain-blocks from Engine RoomRemoval of Chain-blocks from Engine Room
36Shifting of Chain-blocks from Ship to Shop-floorShifting of Chain-blocks from Ship to Shop-floor
37Shifting of alignment tools to shipShifting of alignment tools to ship
38Fitment of air intake branch pipeFitment of air intake branch pipe
39Fitment of exhaust branch pipeFitment of exhaust branch pipe
40Jack bolt alignment and offeringJack bolt alignment and offering
413 pt alignment and offering3 pt alignment and offering
42Fitment of combustion chamberFitment of combustion chamber
43Free alignment and offeringFree alignment and offering
44Final alignment and offeringFinal alignment and offering
45Removal of alignment tools from shipRemoval of alignment tools from ship
46Fitment of system pipelinesFitment of system pipelines
47Assistance for trialsAssistance for trials

AI Tender Summary

OUR REF NO 58275610
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 19-11-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For Removal Replacement Of Gtg Tc Onboard In Ships; Any Other Suitable Brand; No; Buyer Premises - Degutting Of Hi Casings , Degutting Of System Lines , Shifting Of Chain-Blocks From Shop-Floor To Ship , Placement Of Chain-Blocks Inside Engine Room , Shifting Of Lifting Slings From Shop-Floor To Ship , Placement Of Lifting Slings Inside Engine Room , Removal Of Combustion Chamber , Degutting, Removal And Stowage Of Exhaust Branch Pipe , Degutting, Removal And Stowage Of Intake Branch Pipe , Removal Of Compressor Top Stator , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Main Air Intake Distance Piece Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Compensator Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Pipe Of Gtg. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Conical Ring Of Exhaust System Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Compensator Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 1St Exhaust System Pipe Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 2Nd Exhaust System Compensator Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – 2Nd Exhaust System Pipe Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – De-Icing System Pipes Of Gt. , De-Gutting (Removal Of Studs/ Bolts), Shifting From Ship To Shop-Floor, Shifting From Shop-Floor To Ship And Re-Gutting (Fitment Of Studs/Bolts) – Breather System Pipes Of Gt. , Lifting & Shifting Combustion Chamber Ship To Jetty To Shop Floor. , Lifting & Shifting Exhaust Branch Pipe Ship To Jetty To Shop Floor. , Lifting & Shifting Suction Branch Pipe Ship To Jetty To Shop Floor. , Lifting & Shifting Gtg Tc Ship To Jetty To Shop Floor , Mechanical Cleaning Of Gtg Bed And Surrounding Area Prior Gtg Lowering , Assemble Of Old Gtg Tc In Shopfloor (Exhaust Duct And Suction Branch Pipe) , Mechanical Cleaning Of Gtg And Surrounding Area During Installation Of Gtgs , Dis-Assemble Of New Gtg Tc In Shopfloor (Exhaust Duct And Suction Branch Pipe) , Shifting & Lowering New Gtg Tc Ship To Jetty To Shop Floor. , Shifting & Lowering Suction Branch Pipe Ship To Jetty To Shop Floor. , Shifting & Lowering Exhaust Branch Pipe Ship To Jetty To Shop Floor. , Shifting & Lowering Combustion Chamber Ship To Jetty To Shop Floor. , Removal Of Lifting Slings Inside Engine Room , Shifting Of Lifting Slings From Ship To Shop-Floor , Removal Of Chain-Blocks From Engine Room , Shifting Of Chain-Blocks From Ship To Shop-Floor , Shifting Of Alignment Tools To Ship , Fitment Of Air Intake Branch Pipe , Fitment Of Exhaust Branch Pipe , Jack Bolt Alignment And Offering , 3 Pt Alignment And Offering , Fitment Of Combustion Chamber , Free Alignment And Offering , Final Alignment And Offering , Removal Of Alignment Tools From Ship , Fitment Of System Pipelines , Assistance For Trials
Basic Detail
Tender No GEM/2026/B/8123882
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 29 Oct 2026
Submission Date 19 Nov 2026
Open Date 20 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4.20 Lakhs
Exemption Not Available
Document List
1bb566e7-ed25-4567-a6df-05b02cd5cc70.pdf
1791287583.xlsx
1793266545.pdf
1793266549.pdf
1793266552.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Nov 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

1bb566e7-ed25-4567-a6df-05b02cd5cc70.pdf

xlsx

1791287583.xlsx

pdf

1793266545.pdf

pdf

1793266549.pdf

pdf

1793266552.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender