Tender For Supply, Erection, Installation, Testing And Commissioning Of Tower Split Air Conditioning System For Mechanical Department, Bel Bangalore.
Tender Overview
Project Description
Tender for Supply, Erection, Installation, Testing And Commissioning Of Tower Split Air Conditioning System For Mechanical Department, Bel Bangalore. , Part-A Supply , Supply Of Tower Split Ac (Supply Of Tower Split Ac Of Capacity Not Less Than 3.0Tr Of Rotary / Scroll Compressor, Aircooled Condensing Unit With Copper Cooling Coil, Fan Motor And Indoor Unit Complete With Filter Section, Cooling Coil Of Copper Tubes With Aluminium Fins, Electric Motor, Fans Including Initial Charge Of R32 Refrigerant And Subsequent Charge / Tapping Of Refrigerant During Testing / Commissioning If Any, Etc. As Required, Including Minor Civil Works Like Core Cutting, Ms Stand / Supports For Ac Units All As Specified And / Or Directed Etc.,Complete. Quoted Price Shall Include Cost Of Wireless Remote Controller, Outdoor Unit Stand,Cooling Thermostat, Wiring, Control Cabling And Earthing. Unit Shall Be Provided With Auto Clean Mode, Auto Timer Setting And As Per Specifications.) , Part-B Installation, Testing & Commissioning , Erection, Testing & Commissioning Tower Split Ac (Erection, Testing And Commissioning Tower Split Ac Of Capacity Not Less Than 3.0Tr Of Rotary / Scroll Compressor, Aircooled Condensing Unit With Copper Cooling Coil, Fan Motor And Indoor Unit Complete With Filter Section, Cooling Coil Of Copper Tubes With Aluminium Fins, Electric Motor, Fans Including Initial Charge Of R32 Refrigerant And Subsequent Charge / Tapping Of Refrigerant During Testing / Commissioning If Any, Etc. As Required, Including Minor Civil Works Like Core Cutting, Ms Stand / Supports For Ac Units All As Specified And / Or Directed Etc.,Complete. Quoted Price Shall Include Cost Of Wireless Remote Controller, Outdoor Unit Stand,Cooling Thermostat, Wiring, Control Cabling And Earthing. Unit Shall Be Provided With Auto Clean Mode, Auto Timer Setting And As Per Specifications.) , Supply, Erection, Test & Commissioning Of Refrigerant Grade (Supply, Erection, Testing And Commissioning Of Refrigerant Grade Copper Piping Between Indoor And Outdoor Units Of Suitable Size (Both Suction And Discharge Piping Will Be Treated As One Unit And Will Not Be Measured Separately),Both The Suction And Liquid Lines Shall Be Insulated With Closed Cell Nitrile Rubber Tubular Insulation With Factory Laminated With Glass Cloth Of Thickness As Specified In Dts Including Pressure Testing And Charging Of Refrigerant And Oil, Joints, Fittings, Accessories, Core Cutting In Brick/ Concrete Wall As Required And Making Surface Good, Supports Etc.Suitable For Upto 3.0 Tr Capacity Tower Split Ac Unit) , Providing & Laying Of Cpvc (Sdr11) 32Mm Dia (Providing And Laying Of Cpvc (Sdr11) Pipes Of 32 Mm Dia, With 9 Mm Thick Elastomeric Nitrile Rubber Tubular Insulation With Factory Laminated Frp Cloth/ Glass Cloth For Condensate Water Drain From The Ac Indoor Units To Nearest Drain Point, Fittings, Support Including Core Cutting In Brick/ Concrete Wall As Required And Making Surface Good With Adhesive Materials Like Silicon Sealant Etc. Complete ) , Providing & Laying Of Cpvc (Sdr11) 32Mm (Providing And Laying Of Cpvc (Sdr11) Pipes Of 32 Mm Dia For Ac Condensate Water Drain Outside Building With Fittings, Support Including Core Cutting In Brick/ Concrete Wall As Required And Making Surface Good Etc. Complete ) , Supply Of Pvc Mini Trunking Size 150Mmx50mm (Supply Of Pvc Mini Trunking Profile/ System Of Size Minimum 150Mm X 50Mm Along With Base, Covers, Endcaps, Joints (Coupler), Bends, Tees, Mounting Accessories Etc. And Installation Of The Same On The Wall By Providing Required Bolt-Nuts/ Screws With Tw Gutties/ Fixing Accessories As Per Manufacturers Recommendation Etc. Complete As Directed By Engineer In Charge.)
BOQ
| Sl. No. | Item Description |
| 1 | PART-A SUPPLY |
| 2 | Supply of Tower Split AC(Supply of Tower Split AC of capacity not less than 3.0TR of rotary / scroll compressor, aircooled condensing unit with copper cooling coil, fan motor and indoor unit complete with filter section, cooling coil of copper tubes with aluminium fins, electric motor, fans including initial charge of R32 refrigerant and subsequent charge / tapping of refrigerant during testing / commissioning if any, etc. as required, including minor civil works like core cutting, MS stand / supports for AC units all as specified and / or directed etc.,complete.Quoted price shall include cost of wireless remote controller, outdoor unit stand,cooling thermostat, wiring, control cabling and earthing. Unit shall be provided with auto clean mode, auto timer setting and as per specifications.) |
| 3 | PART-B Installation, testing & commissioning |
| 4 | Erection, Testing & commissioning Tower Split AC(Erection, testing and commissioning Tower Split AC of capacity not less than 3.0TR of rotary / scroll compressor, aircooled condensing unit with copper cooling coil, fan motor and indoor unit complete with filter section, cooling coil of copper tubes with aluminium fins, electric motor, fans including initial charge of R32 refrigerant and subsequent charge / tapping of refrigerant during testing / commissioning if any, etc. as required, including minor civil works like core cutting, MS stand / supports for AC units all as specified and / or directed etc.,complete.Quoted price shall include cost of wireless remote controller, outdoor unit stand,cooling thermostat, wiring, control cabling and earthing. Unit shall be provided with auto clean mode, auto timer setting and as per specifications.) |
| 5 | Supply, erection, test & commissioning of refrigerant grade (Supply, erection, testing and commissioning of refrigerant grade copper piping between indoor and outdoor units of suitable size (both suction and discharge piping will be treated as one unit and will not be measured separately),Both the suction and liquid lines shall be insulated with closed cell nitrile rubber tubular insulation with factory laminated with glass cloth of thickness as specified in DTS including pressure testing and charging of refrigerant and oil, joints, fittings, accessories, core cutting in brick/ concrete wall as required and making surface good, supports etc.suitable for upto 3.0 TR capacity Tower split AC unit) |
| 6 | Providing & laying of cPVC (SDR11) 32MM dia(Providing and laying of cPVC (SDR11) pipes of 32 mm dia, with 9 mm thick elastomeric nitrile rubber tubular insulation with factory laminated FRP cloth/ glass cloth for condensate water drain from the AC indoor units to nearest drain point, fittings, support including core cutting in brick/ concrete wall as required and making surface good with adhesive materials like silicon sealant etc. complete ) |
| 7 | Providing & laying of cPVC (SDR11) 32MM(Providing and laying of cPVC (SDR11) pipes of 32 mm dia for AC condensate water drain outside building with fittings, support including core cutting in brick/ concrete wall as required and making surface good etc. complete ) |
| 8 | Supply of PVC mini trunking size 150mmX50mm(Supply of PVC mini trunking profile/ system of size minimum 150mm X 50mm along with base, covers, endcaps, joints (coupler), bends, tees, mounting accessories etc. and installation of the same on the wall by providing required bolt-nuts/ screws with TW gutties/ fixing accessories as per manufacturers recommendation etc. complete as directed by Engineer in charge.) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender