Tender For Providing Of Water Proofing Treatment In Wtf, Delay Tank, Wv Panel Building In Dfrp At Igcar, Kalpakkam.
Tender Overview
Project Description
Tender for Providing Of Water Proofing Treatment In Wtf, Delay Tank, Wv Panel Building In Dfrp At Igcar, Kalpakkam.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Nov-2026 | Sales Extension 1 | Date | 18-Nov-2026 |
| 2 | 19-Nov-2026 | sales extension 2 | Date | 25-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing water proofing treatment to the RCC cast insitu terrace and gutters using ‘CERA WP SHIELD P4180 / Fosroc Torchseal 4PI or approved equivalent’ 4mm thick and ‘CERA WP SHIELD SLATED / Fosroc Torchseal 4PI or approved equivalent’ 4mm thick as per specifications and as directed by the Engineer-in-Charge for following. a) The existing tarfelt, bituminous primer, WP Tiles and foam concrete, waterproofing membranes & cement based water proofing treatment, and all types of water proofing treatment shall be removed completely by cutting and peeling off from the surface and disposing the same 50m beyond the building area. b) V grooves shall be cut along the surface crack, along the construction joints on wall - slab joints and the same shall be filled with cementitious non shrink grout ‘Cera Grout 40 / Fosroc Conbextra GP / SikaGrout-214 IN S or approved equivalent’. c) The area shall be tested for any leakages by ponding of water (water holding test) before and after application of treatment in panels. (panels shall be made by least ratio of cement mortar and the same shall be thoroughly cleaned before receiving further treatment). Incase of any leaks found, Foam grouting shall be done, which will be paid under relevant item. d) When the entire surface is water-tight, dry and moisture free, one coat of bituminous primer shall be applied over surface @ 0.3 kg/sqm and 1st layer of 5 - layered, 4mm thick, polymer reinforced APP membrane WP SHIELD P4180 from CERA / Torchseal 4PI from FOSROC / SIKA shall be laid with 200mm overlapping by torch - on application when the primed surface is tacky and as per the manufacturers recommendation. e) The second layer of 4 or 5 - layered, 4mm thick, polymer reinforced APP membrane WP SHIELD - SLATED from CERA / Torchseal 4PI from FOSROC / SIKA shall be laid with 200mm overlapping by torch - on application when the primed surface is tacky and as per the manufacturers recommendation shall be laid in perpendicular direction to the first layer. Note: i) The treatment should be done by an agency specialised in the job having sufficient knowledge of water proofing treatment. Suggested vendors : (1) M/s. Cera-Chem Pvt. Ltd., Chemicals (2) M/s. Fosroc Chemicals (3) M/s. Sika India Pvt. Ltd. Chemicals ii) This item includes for lifting of material at higher elevation. iii) Ten years guarantee shall be given by the contractor in the prescribed form of the department for the above water proofing treatment work |
| 2 | Providing and laying High performance acrylic elastomeric water proofing treatment system including preparation of surface by cleaning the surface by washing thoroughly by mechanical and manual means, making surface free from dirt/oil/other materials, removal of loose/ cracked mortar joints of weathering tiles, filling the cracks using approved crack fillers, filling/injection/grouting the cracks/joints where ever required with polymer modified cement mortar using admixtures, loose tiles shall be fixed firmly, applying bond coat, applying second coat of two component highly flexible cementious water proofing coat, applying third and fourth coat of high performance acrylic elastomeric coating, leak test, etc., all complete as detailed below as per manufacturer specifications and as directed by the Engineer-in-Charge. i) Crack Treatment: Making V groove (upto 6mm depth and 6 mm width) along the surface cracks, cleaning the surface by sprinkling water to remove all the loose particles, dust and filling the cracks with Polymer modified cementitious crack sealer from ‘Renderoc CS of Fosroc / Mixbuild GP of FAB Chemical / Ceragrout 40 of CERA CHEM / Crack fill of Bostik Crack fill Bostik or other approved equivalent’, Mixing ratio, consumption and application procedure shall be as per manufacturer specifications ii) Bond Coat (1st Coat): Applying Base primer bond coat with ‘Mix Bond SBR of FAB chemical / Cera Latex SBR of CERA CHEM / Boscocem 475 of Bostik or other approved equivalent’ over the existing surface. Mixing ratio, consumption and application procedure shall be as per manufacturer specifications. iii) Glass Fibre Mesh: Laying the Glass Fibre mesh of 45-50 GSM of ‘Mixmat GFM 50 of FAB chemical / GEOTEXTILE 50GSM or other approved equivalent’ over the above bond coat is still green. Overlaps of joints of fibre cloth should not be less than 100mm or as per manufacturer specifications. iv) Highly flexible cementious water proofing coat (2nd Coat): Applying 2 component waterproofing coating of ‘Mixguard AC of FAB Chemical / Ceralastic of CERA CHEM / Boscolastic of Bostik / Brushbond RFX of Fosroc or other approved equivalent’, Mixing ratio of chemicals, consumption and application shall be as per manufacturer specifications. v) Highly performance acrylic elastomeric water proofing coat (3rd and 4th Coat): Applying seal coat and top coat using acrylic elastomeric waterproofing coating ‘Mixtex Super of FAB Chemical / Nitoproof 600 PF of Fosroc / Ceraflex of CERA CHEM / Elastocoat of Bostik or other approved equivalent’ Mixing ratio of chemicals, consumption and application shall be as per manufacturer specifications. |
| 3 | Providing and fixing 1st quality one course of cool roof vitrified tiles of approved make, using tiles of size 300x300mm and 10mm (±1mm) thick of with SRI (Solar Reflectance Index) > 78, Solar reflection > 0.70 & initial emittance >0.75, free from cracks, fissures & flakes with straight edges & perfect corners fixed at right angles as per design and pattern required over roof slab / sloped surface of terrace and skirting laid/fixing on water proof layers as specified below, including machine / hand cutting to required size and shape, grouting and cleaning the surface, exposing floor & wall function along parapet and column if any, cleaning the surface neatly at the time of handing over the area, all materials and labour complete all as directed by the Engineer-in-Charge(EIC). Note: 1) The sample tile in respect of brand, thickness, colour/shade, finishes or charges of tiles has to be got approved by the EIC before procurement. 2) Fixing method has to be got approval of EIC. 3)The water proofing treatment should be done by an agency specialized in the job having sufficient knowledge of water proofing treatment. 4)This item includes tile fixing compound / adhesive if any required as instructed by EIC & water proofing slurry (as approved system) required for fixing of tiles required as per EIC instruction. 5) Tiles fixing and water proof coats and layers has to follow the curing period strictly as per manufacturer recommendation and as per EIC instruction. 6) Testing charges of tiles shall be borne by the contractor. Cool roof - Tile fixing base layers of mortar & treatment to be done/coat as follows : a) 1st Bonding coat: applying 2 coats of bonding slurry agent of SBR latex of approved make at 2.2kg/sq.m on cleaned and prepared concrete surface. b) Applying Base coat of polymer modified mortar 1:2:2 (1 cement : 2 sand: 2 stone Aggregate of nominal size 6mm) admixed with SBR latex of approved make @ 3 kg per bag of cement for a thickness of 20mm. c) Fixing of Alkali resistance Glass fibre mesh (4- 5mm square aperture with 145 gsm) of approved make in base coat area as instructed by EIC. d) Applying 2nd coat of 2 coats of bonding slurry agent of SBR latex of approved make at 2.2kg/sq.m. e) Applying top coat of polymer modified mortar 1:2:2 (1 cement : 2 sand: 2 stone Aggregate of nominal size 6mm) admixed with SBR latex of approved make @ 3 kg per bag of cement for a thickness of 20mm. The rate includes cleaning the slab surface of all mortar fallings, opening, filling / grouting cracks, injection grouting to RCC surfaces, necessary curing and drying period for each coat, providing proper bonding keys in each layer on all sides. |
| 4 | Providing and constructing haunching of size 100mm X 100mm using CC 1:2:4 using 6mm down graded chips admixed with approved make of SBR latex at 1kg per 50kg (1 bag) of cement complete all as directed by Engineer-in-Charge. |
| 5 | Providing on the floor area by screeding with screed concrete of M20 grade with total minimum cementitious content (cement + fly ash content not exceed 20 % by weight of total cementitious content) 320kg/cum of concrete and minimum cement content of 256 Kg/cum of concrete (shall be using 10mm down aggregate) admixed with crystalline based integral water proofing admixture of approved make at the ratio of 0.8% by weight of cement (or as per manufacturer recommendation) to the required thickness and slope at terrace water proofing including applying one coat of SBR polymer modified cementitious bond coat at 2.2 kg cement per sqm of surface area mixed with specified proportion (at 10% of cement weight or as per manufacturer specification) of SBR polymer of approved make over the prepared surface at all locations and all elevation and specification and as directed by the Engineer-in-Charge. Note: 1) The area shall be tested for any leakage by ponding of water (water holding test) before and after application of treatment in panels. (panels shall be made by least ratio of cement mortar and the same shall be thoroughly cleaned before receiving further treatment). 2) This item shall include placing the pumpable concrete by boom placer, concrete pump, supply of RMC concrete in Transit mixer as directed by Engineer-in-charge if bulk quantity is required according to the site conditions. 3) Concrete shall be placed in layers in such a way that fibre glass mesh (if required by Engineer-in-Charge) will be fixed in between layers and fixing of fibre glass mesh shall be paid under separate item. |
| 6 | Supplying and fixing in all position of Alkali resistance Glass fibre mesh of Gyproc Fiber Mesh or approved equivalent (4-5mm square aperture or as per specified at site with 145 gsm) fixed with neat cement paste or by manufacturer recommendation fixed below screed concrete with minimum 100mm overlapping at mesh joints and as instructed by Engineer-in-Charge. |
| 7 | Supplying and providing the approved make of STRIP SEAL upto 250mm width Expansion joint strip treatment for Roof slab/vertical wall area including chipping & surface preparation, applying adhesive as per strip seal manufacturer recommendation over the roof slab expansion joint to a minimum width of 50mm and aligning to the required line, overlapping of minimum 100mm of strip with suitable rubber adhesive, carefully removing of air pockets & wrinkles as specification and as directed by Engineer-in-Charge. Note: The area shall be tested for any leakages by ponding water in panels. In case of any leaks found grouting shall be done with contractor cost. |
| 8 | Providing repair work to the cracks in joints between plastered wall to column/beam junctions and other required locations and at all elevations upto 20 to 30mm deep and below mentioned width including preparing the surface, applying polymer bonding agent, cost of all materials, labour, tools, tackles, equipment’s, transport etc. complete all as directed by Engineer-in-Charge and as per the specifications. a) Surface preparation: Chipping and removing the existing plastered wall surfaces to the required depth and surface preparation such as removing the loose materials, dust and other laitance with wire brush and coir brush, etc. complete. b) Bonding coat on surface: Providing and applying a coat of epoxy resin based bonding agent of ‘Cera Bond EP / Fosroc Nito Bond EP/ Sikadur-32 IN’ or approved equivalent to the cleaned and prepared concrete surface prior to applying of polymer modified mortar. c) Polymer modified mortar : Applying polymer modified mortar 1:3 (1 cement : 3 crushed stone sand) admixed with ‘Cera latex SBR / Fosroc Nito Bond SBR / Sikalatex SBR or approved equivalent’ at 6% weight of cement (or as per manufacturer recommendation) for a thickness of 20mm to 30mm by mechanically or manually and neatly finished as instructed over the prepared surface. Note: 1) Scaffolding will be paid in separately in the relevant item. 2) The contractor shall arrange the suitable safety arrangements for executing the work at his own cost as directed by the Engineer-in-Charge. |
| 9 | Above 50mm and upto 100mm wide |
| 10 | Providing Structural repair work to the exposed reinforced concrete surfaces of columns, beams, slabs, window sills, staircase and lintel cum sunshades at all locations and at all elevations by guniting including preparing the surface, providing and applying 25mm thick polymer modified mortar by manually over a coat of polymer bonding agent CERA LATEX SBR / NITOBOND SBR LATEX from FOSROC / CICA or equivalent @ 2kg per bag of cement and cost of all materials, labour, tools, tackles, equipment’s, fuel & transport etc. complete as directed by Engineer in charge and as per the specifications which consists of. a) Chipping, grinding and removing all the porous / loose parts, cracked / damaged concrete to the required sound concrete surface, exposing the rods and cleaning any foreign material including removing the rust and loose scales from the exposed reinforcement with wire and coir brushes and cleaning the entire surface by blowing compressed air and / or water jet. etc. complete. b) If required by Engineer-in-Charge, applying epoxy zinc rich primer of CERA ZINC-ZR / NITOZINC from FOSROC / SICA or equivalent in 2 coats to the exposed reinforcement and new reinforcement after doing the necessary surface preparation which will be paid separately under relevant item. c) Bonding coat on surface: Providing and applying a coat of epoxy resin based bonding agent of ‘Cera Bond EP / Fosroc Nito Bond EP/ Sikadur-32 IN’ or approved equivalent to the cleaned and prepared concrete surface prior to applying of polymer modified mortar. d) Polymer modified mortar : Applying polymer modified mortar 1:3 (1 cement : 3 crushed stone sand) admixed with ‘Cera latex SBR / Fosroc Nito Bond SBR / Sikalatex SBR or approved equivalent’ at 6% weight of cement (or as per manufacturer recommendation) for a thickness of 25mm by mechanically or manually and neatly finished as instructed over the prepared surface. Note: 1) Scaffolding will be paid in separately in the relevant item. 2) The contractor shall arrange the suitable safety arrangements for executing the work at his own cost as directed by the Engineer-in-Charge. |
| 11 | Providing and applying painting Two coats at all levels Acrylic emulsion paint (ACE or Equivalent approved brand, colour and manufacturer) to give an even shade including preparation of the surfaces, applying putty (putty for touch up to fill up crevices, mild depression etc.), scaffolding complete all as per specifications and as directed by the Engineer-in-Charge. |
| 12 | Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building. |
| 13 | Dismantling old weather proofing materials such as brick bat coba or foam and screed concrete at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. |
| 14 | Dismantling weather proofing old bitumen felt or App membrane sheets at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. |
| 15 | Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. |
| 16 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre |
| 17 | Providing and injecting cementitious non-shrink grout from ‘Cera/Fosroc Conbextra GP2/ SikaGrout-214 IN S’ at all levels in proportion recommended by the manufacturer into for required members by suitable gun/pump at required pressure including cutting of nipples after curing, all machinery, tools, manpower, necessary scaffoldings etc. complete all as directed by the Engineer-in-Charge. Note: The consumption of grout material measured for bill is the actual quantity of intake during grouting. Wastages during grouting process and other wastages are not considered for measurement. |
| 18 | Providing and injecting polyurethane based injection resin grout ‘Cera Inject SS/Fosroc Nitofill WS60/ Sika Injection-201 IN’ at all levels in proportion recommended by the manufacturer into cracks, honey-comb area, arresting roof leaks, low roof leakages, underground sump leaks and other required members by suitable gun/pump at required pressure including cutting of nipples after curing, all machinery , tools, manpower, necessary scaffoldings etc. complete all as directed by the Engineer-in-Charge. Note: The consumption of grout material measured for bill is the actual quantity of intake during grouting. Wastages during grouting process and other wastages are not considered for measurement. |
| 19 | Providing and fixing PVC rain water downtake pipes conforming to IS:13592 Type A and PVC SWR Fittings & specials confirming to IS:14735, ‘Finolex’ or other approved equivalent make of pipes, fittings & specials including jointing with seal ring / with PVC solvent adhesive including fixing in walls/columns using clamps, anchor fasteners, bolts and teakwood packing pieces, joint testing etc complete all as per drawings, specifications and as directed by the Engineer-in-Charge. |
| 20 | PVC SWR Rain water pipe 110mm outer dia |
| 21 | PVC SWR Rain water pipe 160mm outer dia |
| 22 | Cleaning the sun shades roof gutters/ rain water gutters at all levels of various building, removing the vegetation growth and cleaning the drain pipes, spouts periodically as and when required, conveying the removed unwanted materials to the bins as directed, cutting and making opening in brick masonry, RCC concrete, removing the debris, disposing off as directed, attending the masonry repairs and making good the sides of hole packing the removed portion of the inside by filling concrete / brick work including finishing the surfaces etc. construction of brick masonry foundation walls wherever required etc. complete all as directed by the Engineer-in-Charge. |
| 23 | Providing and applying a two-coat, 2K (two-component) aqueous, epoxy-based damp-proofing treatment for internal and external surfaces with ‘CERA DAMP PROOF or other approved equivalent’ as per direction of Engineer-in-charge. The application shall be carried out using a brush or roller, ensuring a recommended drying time of 6 to 8 hours between coats. Any existing cracks shall be filled and cured at least 24 hours prior to the application of the first coat with suitable material as directed by the Engineer-in-charge. Note : (1) The base and hardener must be stirred individually before mixing. The base shall then be poured into the hardener container and mixed thoroughly until a homogenous blend is achieved. (2) Scaffolding if required, shall be measured and paid for as a separate item. Overall rebate (Optional) INR Zero Only Please Enable Macros to View BoQ information Government of India Department of Atomic Energy Indira Gandhi Centre for Atomic Research CIVIL ENGINEERING GROUP Name of work : Providing of water proofing treatment in WTF, delay tank, WV panel building in DFRP at IGCAR, Kalpakkam. Tender No. : CEG/IGC/2241/2026 INDEX Section Title Page No. VIII Instructions to contractors 2 - 3 Schedule of Quantities 1 - 9 Section VIII I. GENERAL INFORMATION FOR GUIDANCE OF TENDERERS |
| 24 | The schedule of quantities is to be read for the purpose of pricing in conjunction with the special conditions, general rules for the guidance of contractors, conditions of contract, specifications, drawings, schedule of supply of materials and the appendices. |
| 25 | The prices inserted in the schedule of quantities shall be inclusive of value of the work described including all cost and expenses, which may be required in and for the construction of the work described together with the general risks, liabilities and obligations not forth or implied in the documents on which the tender is to be based. |
| 26 | The quantities stated are to be considered approximate only and the unit prices entered in the schedule of quantities and prices shall apply only to the actual quantities measured in the completed work in accordance with the specifications. |
| 27 | All the materials other than those shown in schedule of supply of materials in section VII are to be arranged by the contractor and his rates should account for the same. |
| 28 | Rates quoted for all items in this tender shall include cost of all materials including cement and steel. Department will not supply any materials other than materials stipulated in Section VII of the tender and as such the rates quoted must be all inclusive. |
| 29 | The contractor shall be responsible for supply of cement and procure OPC cement conforming to IS 269 (Latest edition) and use it on works. Since the supply of cement by the department has been dispensed all the clauses relevant to supply of cement by department in this tender document stands cancelled. The contractor shall purchase cement from the approved manufacturers only. Secured advances on cement up to 75% of purchase price shall be paid to the contractor after indemnifying the Government and through insurance cover. The quantity of cement on which secured advance shall be paid will be restricted to the consignment of cement tested and passed in the test in department laboratory. The secured advance on cement shall be regulated as per Clause 10B of conditions of contract. Prior approval to be obtained from the Engineer for the quantities proposed to be purchased. |
| 30 | Contractor shall make his own arrangements for construction water supply to carryout this work. |
| 31 | Compensation for escalation in the prices of materials and labour when due is permissible as per provisions in Clause 10CC of conditions of contract. |
| 32 | If contractors need any clarification they are required to contact the Chief Engineer, Civil Engineering Group, Indira Gandhi Centre for Atomic Research, Central Design Office, Kalpakkam 603 102, Kancheepuram District, Tamilnadu. (Telephone STD Code: 044 – 27480306) II. CONDITIONS FOR CEMENT : |
| 33 | The contractor shall procure OPC cement conforming to IS 269 (Latest edition), as required in the work, from reputed manufacturers of cement, such as M/s. Ultratech Cements, M/s. Zuari Cements, M/s. Coromandel, M/s. Penna, M/s. Priya Cements, M/s. Chettinadu Cement,M/s. Dalmia cementsand holding license to use ISI certification mark for their product whose name shall be got approved from Engineer-in-charge. Supply of cement shall be taken in 50 Kg. bags bearing manufacturer’s name and ISI marking, samples of cement arranged by the contractor shall be taken by the Engineer-in-charge and got tested in accordance with provisions of relevant BIS codes. In case test results indicate that the cement arranged by contractor does not conform to the relevant BIS codes, the same shall stand rejected and shall be removed from the site by the contractor at his own cost within a week’s time of written order from the Engineer-in-charge to do so. |
| 34 | The cement shall be brought at site in bulk supply of approximately 50 tonnes or as decided by the Engineer-in-charge. |
| 35 | The cement Godown of having a capacity to store minimum of 2000 bags of cement shall be constructed by the contractor at site of work for which no extra payment shall be made from department. Double lock provision shall be made to the door of the cement godown. The keys of one lock shall remain with the Engineer in charge or his authorised representative and the key of the other lock shall remain with the contractor. The contractor shall be responsible for the watch and ward the safety of the cement godown. The contractor shall facilitate the inspection of the cement godown by the Engineer-in-charge at any time. |
| 36 | The contractor shall supply free of charge the cement required for testing. The cost of tests shall be borne by the contractor. |
| 37 | The actual issue and consumption of cement on work shall be regulated and proper accounts maintained as provided in Clause 10 of the contract. The theoretical consumption of cement shall be worked out as per procedure prescribed in Clause 42 of the contract and shall be governed by conditions laid therein. |
| 38 | Cement brought to site and cement remaining unused after completion of work shall not be removed from site without written permission of the Engineer-in-charge. ----- |
| 39 | Government of IndiaDepartment of Atomic EnergyIndira Gandhi Centre for Atomic ResearchCivil Engineering Group TENDER DOCUMENT FOR Cleaning of Storm water drains and roads in Southern side of IGCAR Premises during the year 2024-2025 at Kalpakkam. Tender No. CEG/IGC/1937/2023 Part – II : Financial Bid (Section - VIII) INDEX Sl. No. Title Page No. |
| 40 | Schedule of Quantities 1 - 2 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender