Bids Are invited for High Density Foam Pigging
Tender Overview
Project Description
Bids Are invited for Foam Pigging Of 10 Inch Line From Railway Siding To Pump House - Internal Cleaning, De-Sludging, And Flushing Of 10 Inch Nb Pipeline From Railway Siding To Pump House (Approx. 650 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge , Foam Pigging Of 8 Inch Line From Railway Siding Crossing To Pump House - Internal Cleaning, De-Sludging, And Flushing Of 8 Inch Nb Pipeline From Railway Siding Crossing To Pump House (Approx. 110 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 10 Inch Line From Twg Unloading Pump House To Tank Inlet Header - Internal Cleaning, De-Sludging, And Flushing Of 10 Inch Nb Pipeline From Twg Unloading Pump House To Tank Inlet Header (Approx. 150 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge , Foam Pigging Of 6 Inch Line From Tanks Outlet To Tlf Pump House - Internal Cleaning, De-Sludging, And Flushing Of 6 Inch Nb Pipeline From Tanks Outlet (Tk-3/4 Manifold) To Tlf Pump House (Approx. 625 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 6 Inch Line From Tlf Pump House To Tt Gantry - Internal Cleaning, De-Sludging, And Flushing Of 6 Inch Nb Pipeline From Tlf Pump House To Tt Gantry (Approx. 280 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 3 Inch Tsv Line From Tlf Pump House To Tt Gantry - Internal Cleaning, De-Sludging, And Flushing Of 3 Inch Nb Thermal Safety Valve (Tsv) Bypass/Product Pipeline Running From Tlf Pump House To Tt Gantry (Approx. 325 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Hook-Up Of Temporary Launchers/Receivers, Propellant Medium Supply, Progressive Pigging Runs To Eliminate Trapped Residual Heavy Hydrocarbons, Safe Disposal Of Drained Effluent Into Depot Slop Network, And Box-Up With Fresh Gaskets As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 3 Inch Railway Siding Header Line Connections - Internal Cleaning, De-Sludging, And Flushing Of 3 Inch Nb Railway Siding Header Line Connections (Approx. 250 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Hook-Up Of Temporary Launchers/Receivers, Propellant Medium Supply, Progressive Pigging Runs To Clear Pipe Scales And Residual Product, Decanting/Slop Collection, Dismantling, And Line Box-Up With Fresh Gaskets As Per Instructions Of Engineer-In-Charge.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Foam Pigging of 10 Inch Line from Railway Siding to Pump House | Internal cleaning, de-sludging, and flushing of 10 Inch NB pipeline from Railway Siding to Pump House (approx. 650 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes mobilization of temporary pig launcher and receiver rated for line test pressure, certified air compressor/pumping equipment with spark arrestor, progressive pigging runs (swabbing, scraping, and final drying runs), draining and containment of flushed product/sludge into designated slop containers, dismantling of temporary traps, and line reinstatement with new spiral-wound gaskets and studs as per instructions of Engineer-in-Charge |
| 2 | Foam Pigging of 8 Inch Line from Railway Siding Crossing to Pump House | Internal cleaning, de-sludging, and flushing of 8 Inch NB pipeline from Railway Siding Crossing to Pump House (approx. 110 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes mobilization of temporary pig launcher and receiver rated for line test pressure, certified air compressor/pumping equipment with spark arrestor, progressive pigging runs (swabbing, scraping, and final drying runs), draining and containment of flushed product/sludge into designated slop containers, dismantling of temporary traps, and line reinstatement with new spiral-wound gaskets and studs as per instructions of Engineer-in-Charge. |
| 3 | Foam Pigging of 10 Inch Line from TWG Unloading Pump House to Tank Inlet Header | Internal cleaning, de-sludging, and flushing of 10 Inch NB pipeline from TWG Unloading Pump House to Tank Inlet Header (approx. 150 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes mobilization of temporary pig launcher and receiver rated for line test pressure, certified air compressor/pumping equipment with spark arrestor, progressive pigging runs (swabbing, scraping, and final drying runs), draining and containment of flushed product/sludge into designated slop containers, dismantling of temporary traps, and line reinstatement with new spiral-wound gaskets and studs as per instructions of Engineer-in-Charge |
| 4 | Foam Pigging of 6 Inch Line from Tanks Outlet to TLF Pump House | Internal cleaning, de-sludging, and flushing of 6 Inch NB pipeline from Tanks Outlet (TK-3/4 manifold) to TLF Pump House (approx. 625 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes mobilization of temporary pig launcher and receiver rated for line test pressure, certified air compressor/pumping equipment with spark arrestor, progressive pigging runs (swabbing, scraping, and final drying runs), draining and containment of flushed product/sludge into designated slop containers, dismantling of temporary traps, and line reinstatement with new spiral-wound gaskets and studs as per instructions of Engineer-in-Charge. |
| 5 | Foam Pigging of 6 Inch Line from TLF Pump House to TT Gantry | Internal cleaning, de-sludging, and flushing of 6 Inch NB pipeline from TLF Pump House to TT Gantry (approx. 280 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes mobilization of temporary pig launcher and receiver rated for line test pressure, certified air compressor/pumping equipment with spark arrestor, progressive pigging runs (swabbing, scraping, and final drying runs), draining and containment of flushed product/sludge into designated slop containers, dismantling of temporary traps, and line reinstatement with new spiral-wound gaskets and studs as per instructions of Engineer-in-Charge. |
| 6 | Foam Pigging of 3 Inch TSV Line from TLF Pump House to TT Gantry | Internal cleaning, de-sludging, and flushing of 3 Inch NB Thermal Safety Valve (TSV) bypass/product pipeline running from TLF Pump House to TT Gantry (approx. 325 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes hook-up of temporary launchers/receivers, propellant medium supply, progressive pigging runs to eliminate trapped residual heavy hydrocarbons, safe disposal of drained effluent into depot slop network, and box-up with fresh gaskets as per instructions of Engineer-in-Charge. |
| 7 | Foam Pigging of 3 Inch Railway Siding Header Line Connections | Internal cleaning, de-sludging, and flushing of 3 Inch NB Railway Siding Header line connections (approx. 250 Mtrs) by launching high-density open-cell polyurethane foam pigs. Scope includes hook-up of temporary launchers/receivers, propellant medium supply, progressive pigging runs to clear pipe scales and residual product, decanting/slop collection, dismantling, and line box-up with fresh gaskets as per instructions of Engineer-in-Charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender